Loading…
Loading…
3,989 results • Best match
Survey, Supply, Transportation, Erection, Testing and Commissioning for permanent Restoration of Infrastructure Damaged due to flash floods in the month of Aug 2025 in respect of Mangota Hambal Feeders of Electric Sub Division II Doda under the j
Survey, Supply, Transportation, Erection, Testing and Commissioning for permanent Restoration of Infrastructure Damaged due to flash floods in the month of Aug 2025 in respect of Khalani Bhalla Feeder of Electric Sub Division II Doda under the ju
Reinforcement of already existing Manual Oxygen Manifold system at Sheeshnag/ Panchtarni/ Base Camp Lower Holy Cave/ Upper Holy Cave by way of SITC of additional Oxygen Points/Pipeline etc along with transportation empty/filled D type Oxygen Cyl
Solid waste management of various hamlets inside Dal Nigeen lake by way of door to door collection of Solid Waste, its transportation and disposal at designated collection Centers of SMC Srinagar Complete job for the year 2023-24
Collection, Lifting, Transportation, Unloading, Segregationof garbage; Dry Waste
Collection, Lifting, Unloading, Transportation, dryandwet waste; Dry Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage; Dry Waste
Collection, Transportation, Procession & Management of Segregation Waste (Q3)
Collection, Transportation, Waysofdisposal, Segregationof garbage, Unloading; Dry Waste
Collection, Transportation, Procession & Management of Segregation Waste (Q3)
Collection, Lifting, Transportation, Unloading, Segregationof garbage; Dry Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage; Dry Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage; Dry Waste
Collection, Lifting, Transportation, Unloading, Waysof disposal; Dry Waste
Collection, Transportation, Unloading, Segregationof garbage, Waysofdisposal; Dry Waste
Collection, Lifting, Transportation, Unloading, Waysof disposal; Dry Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage; Dry Waste
Collection, Unloading, Transportation, Lifting, Segregationof garbage; Dry Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage; Dry Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage; Dry Waste
Survey, Supply, Transportation, Erection, Testing and Commissioning for permanent Restoration of Infrastructure Damaged due to flash floods in the month of Aug 2025 in respect of Koti and Sazan Feeders of Electric Sub Division I Doda under the ju
Survey, Design, Supply, Transportation / Carriage, Erection, Testing And Commissioning of Concrete Plat Form Mounted 01no. 63 KVA , 01 no. 100 KVA and 01 no. 250 KVA Electrical Sub-Station At Three No. Pumping Stations Of WSS Phalata Alongwith Tappi
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Creation of 8x100KVA. 3x63 KVA Sub station alongwith erection of 11 KV Line on 9 mtr. long ST poles, 30mm Sq ACSR weasel conductor at WSS Pinger under JJM Scheme
Planting with provision fo water harvesting structure, lantana eradication of 2 Ha and extra carriage of plants in Co.51/J (Chaina) of Mastgarh
Survey, Design, Supply, Transportation/Carriage , Erection, Testing and Commissioning of 1 no 400 KVA Substation along with tapping point and 11KV HT/LT Line on 9 mtr/8 mtr ST Poles with ACSR Weasel Conductor for PHE installation of Scheme Thill
Design, Engineering, Manufacture, Survey and Route alignment, Supply, Transportation, Erection, Testing n Commissioning of 4.5 Km 33 KV line on 11 Mtr. STP with Dog conductor with cement bottoming of all poles from 132 b 33 KV Grid Khellani to propo
DESIGN, ENGINEERING, MANUFACTURE, SURVEY AND ROUTE ALIGNMENT, SUPPLY, TRANSPORTATION, ERECTION, TESTING n COMMISSIONING OF 5.5 KM (NEW) 33 KV LINE ON 11 MTR STP WITH DOG CONDUCTOR FROM DRUDHU (TAPPING POINT) TO BHALARA FOR CREATION OF 33 by 11 KV 1x3
Shifting of departmental 200 mm dia (8 mm thick) MS Pipes (6.01 meter each) from Mazbugh to Model Town Sopore/ Bye Pass Sideeq Colony, including welding, transportation, and laying in trenches at WSS Sideeq Colony Model Town under Capex Budget Regula
Design, Engineering, Manufacture, Survey and Route alignment, Supply, Transportation, Erection, Testing n Commissioning of 7 km new 33 KV line on 11 mtr STP With Dog conductor and completion of balance work of already erected 5 Km line only ST Pole
Extraction of Firewood from Compartments 30 31 33 37 38 43 44 45 and 46/Matchil of Matchil Range and Transportation from PLP upto PC Depot Srinagar including Loading Unloading Weighment and other allied operations of Kamraj Forest Division 980 Qtls
Survey Design Supply Transportation Carriage Erection Testing and Commissioning of 400 KVA Substation along with Tapping Point and 11KV Line on 9 mtr ST Poles with ACSR Weasel Conductor between Siar Baba and PTC Talwara on river Chenab single S
Survey Design Supply Transportation Carriage Erection Testing and Commissioning of 250 KVA Substation along with Tapping Point and 11KV Line on 9 mtr ST Poles with ACSR Weasel Conductor at WSS Nuion Reasi on Katra Back Feeder in District Reas
Survey Design Supply Transportation Carriage Erection Testing and Commissioning of 400 KVA Substation along with Tapping Point and 11KV Line on 9 mtr ST Poles with ACSR Weasel Conductor on Jeri-Jambri road in river Chenab (single Stage) of lift
DESIGN, ENGINEERING, MANUFACTURE, SURVEY AND ROUTE ALIGNMENT, SUPPLY, TRANSPORTATION, ERECTION, TESTING n COMMISSIONING OF 7 KM(NEW) 33 KV LINE ON 11 MTR STP WITH DOG CONDUCTOR AND COMPLETION OF BALANCE WORK OF ALREADY ERECTED 5 KM LINE (ONLY ST POLE
GIS related Survey Services - Sq. Meter; 1 Bridges 2 Flyover 3 Residential 4 Commercial 5 Semi Commercial 6 Educational 7 Health Services 8 Railway 9 Religious 10 Recreational 11 Public Utilities 12 Communication 13 Vacant Land 14 Transportation 15 T..
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Creation of 3x250 ,2x63 KVA Sub stations alongwith erection of 11 KV Line on 9 mtr. ST poles, LT line on 8 mtr ST pole at WSS Kud Lower under JJM
GIS related Survey Services - Sq. Meter; 1 Bridges 2 Flyover 3 Residential 4 Commercial 5 Semi Commercial 6 Educational 7 Health Services 8 Railway 9 Religious 10 Recreational 11 Public Utilities 12 Communication 13 Vacant Land 14 Transportation 15 T..
Collection, Lifting, Transportation, Unloading, Segregationof garbage, Waysofdisposal; Dry Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage, Waysofdisposal; Dry Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage, Waysofdisposal; Dry Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage, Waysofdisposal; Dry Waste
NIT for Lifting / transportation / Dispose of Bio Medical Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage, Waysofdisposal; Dry Waste
Collection, Lifting, Transportation, Unloading, Segregationof garbage, Waysofdisposal; Dry Waste
Collection, Lifting, Transportation, Unloading, Waysof disposal, Segregationofgarbage; Dry Waste
Collection, Transportation, Unloading, Segregationof garbage, Waysofdisposal, Lifting; Dry Waste
Collection, Lifting, Transportation, Unloading, Waysof disposal, Segregationofgarbage; Dry Waste
Collection & Disposal Waste Management Service - Lifting, Transportation; Dry Waste