Loading…
Loading…
2,458 results • Best match
Online UPS (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6477344 Dated : 21-07-2025 Bid Document 1/8 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
L2 Manageable Switch with 24 Gigabit Ethernet Ports and 4 x 10G SFP Port, 3 KVA Online UPS with 60 Min Backup, 2 KVA Online UPS with 60 Min Backup, OTE SFP type 120 KM, 12U wall Mountable Rack, UTP cat 6 cable 305 mtr, NAS 6 TB
Rate contract for Supplying, Installation, Testing and Commissioning of 30 Nos 3 Star rating inverter type 1.5TR Split AC unit for various sites under BSNL Electrical Zone Ambala.
The Item Description to be read as per the GeM Contract No. 511687718571786 dated : 06/09/22 - Tech Pro Rectifier Inverter Based (IGTB) Double Bridge Type Welding Set.
Bullet Camera, NVR, Hard Disk,LED Monitor, HDMi Cable, POE 8 Port, 9U Rack, Online UPS and water cooler with R.O.
Online UPS (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate ... category Online UPS (V2) ...
A Mtc of Office Complex Building in Sec 1 Rewari Prov and fixing of 150 AH 12 V inverter battery at Office complex building in Sec 1 NMT Rewari
Bolni Providing canal based water supply scheme for Garhi Bolni, Baghthala and Kheri Motla Providing and fixing of inverter and battery with trolly and all other works contingent thereto
Supply, Installation and Commissioning of Inverter Based Mig Mag Synergic Pules Welding Plant air Cooled torch 400 Amp as per attached Technical Specification. Make: Micro Welds India, Brand: MBI
SUPPLY, INSTALLATION AND COMMISSIONING OF IGBT BASED INVERTER MANUAL ARC WELDING PLANT , Input Supply -415, V Phase - 3-phase Frequency - 50Hz open circuit voltage - 75V,Cooling - Forced air cooled ,
Air plasma cutting machine 100ampscapacity, 3 phase, rated frequency 50/60 HZ, rated input 17.67KVA ( cutting) , 19.82 KVA ( Gouginng) , duty cycle 60, IGBT inverter control process, forced cooling, I
Supply, Installation and Commissioning of energy efficient BEE 5 star Inverter based wall mounted Split Air Conditioner of 1.5 Ton capacity and Decorative light fittings (diffused type), Required for
1.5Ton Split AC Plant inverter type with minimum 3Star rating as per detailed specification enclosed . Make: Blue Star,Lloyd,Voltas, Mitsubishi, Haier, LG, Hitachi, Daikin, Carrier, and Panasonic Only
PROVIDING E & M SERVICES AT HAF TILPAT-II, FARIDABAD SH PROVIDING SERVICES FOR OPERATION AND ROUTINE MAINTENANCE OF DG SET DRINKING WATER SUPPLY PUMP SET AND SOLAR BATYTERY INVERTER ETC AT TILPAT RANGE II Subwork/Packages: PROVIDING SERVICES FOR ... BATTERY INVERTER ETC ...
Providing and fixing industrial tile on the H2SO4 tank ,Acid alkaline tank and Battery bank room at RGTPP,KHEDAR (HISAR).
Providing Grid Connected Roof Top Solar Power Plant without Battery Bank in Sewage Treatment Plant and Water Work at Jind.
Entry and Mid Level Desktop Computer (Q2), Online UPS (? 10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
WORKSTATION, LED DISPLAY, PLOTTER, LAMINATION MACHINE, ONLINE UPS 15 KVA, SERVER BASED STORAGE, PORTABLE NAS BOQ Title AUTH IT EQUIPMENTS FOR IIT
HIGH END LAPTOP, DESKTOP WITH TFT, ONLINE UPS WITH LITHIUM BATTERY, OFFLINE UPS 1 KVA, HP 277A TONER BOQ Title BOQ BID
Split Air Conditioner, Online UPS, Desktop, Computer Table, Computer Chair, All-In-One Printer, Set of Items for Networking and Electrical Work
Air Conditioner Air Conditioner ( 4 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC highwallsplitac Technology of AC Non- Inverter (Fixed Speed) Inverter ... Non- Inverter (Fixed ...
Supply installation, testing and commissioning of 1.5 TR Split Inverter Air Conditioner 5 Star in Office the superintending Engineer and Driver room in the Office Building Sector-13P at Hisar.
Tech Pro Rectifier inverter based(IGTB) double bridge type Welding Set 415V,three Phase with trapping to compensate for variation in input supply Brand: Tech Pro (Detailed Description/Specification as
Tech Pro Rectifier inverter based(IGTB) double bridge type Welding Set 415V,three Phase with trapping to compensate for variation in input supply Brand: Tech Pro (Detailed Description/Specification as
Consumable Spare Parts for Air Plasma Cutting Machine Make Tech PRO (Inverter Based) one set consisting of Following 1. Electrode-01 No., 2. Nozzle-01 No. MAKE_ AS PER SPECIFICATION
Crux Weld Rectifier inverter based(IGTB) double bridge type Welding Set 240V,single Phase Brand: Crux Weld (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-5116877410920
ALL STAR Rectifier inverter based(IGTB) double bridge type Welding Set 415V,three Phase with trapping to compensate for variation in input supply Brand: ALL STAR (Detailed Description/Specification as
Interactive smart touch panel, Public Address voice Alarm System with all Accessories, Electric Siren, Hands free kit for HHRS, Online UPS 5 KVA
Online UPS (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5728932 Dated : 08-01-2025 Bid Document 1/7 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Online UPS (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/5848499 Dated : 28-01-2025 Bid Document 1/7 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Supply and installation of Offline UPS System on behalf of various Govt Departments
Air Conditioner Air Conditioner ( 15 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC High wall Split AC Technology of AC Non- Inverter (Fixed Speed) ... Speed) Inverter (Variable ... Non- Inverter (Fixed ...
400 Amperes Dual IGBT inverter type DC arc welding system with inbuilt safe welding device. Details of Technical specification attached in Annexure-A with Term and condition. Accepted Make/Brand: "MBI
MBI ARC--MICRO WELDS INDIA Welding Machine Portable Inverter type Brand: MBI ARC--MICRO WELDS INDIA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687723139496 dt.1
SUPPLY,INSTALLATION AND COMMISSIONING OF RECTIFIER (SMAW machine set) INVERTER BASED (IGBT) 400 AMP. DOUBLE BRIDGE TYPE WELDING SET,415V,3 PHASE WITH TRAPPING TO COMPENSATE FOR VARIATION IN INPUT SUPP
Inverter 1.0KVA Cap Without Battery & without trolly,CRCA steel enclosure having 1.2 mm thickness sheet,input-single phase sine wave 120-260V, output-single phase sine wave 230 V,Make- Microtek.
MBI ARC--MICRO WELDS INDIA Welding Machine Portable Inverter type Brand: MBI ARC--MICRO WELDS INDIA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687759356921 dt.2
LUMINOUS 3 KVA/12960 VAH 5 Star with trolley Sine Wave Inverter Brand: LUMINOUS (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687719846080 dt.20/07/2023)
LUMINOUS 3 KVA/12960 VAH 5 Star with trolley Sine Wave Inverter Brand: LUMINOUS (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687749253268 dt.18/08/2023)
Online UPS (V2) (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6648881 Dated : 05-09-2025 Bid Document 1/7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Online UPS (V2) (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6512229 Dated : 30-07-2025 Bid Document 1/7 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Interactive Panels with CPU (Q2), Dry Erase Writing Boards (V3) (Q3), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
MBI ARC--MICRO WELDS INDIA Rectifier inverter based(IGTB) double bridge type Welding Set 240V,single Phase Brand: MBI ARC--MICRO WELDS INDIA (Detailed Description/Specification as per Product # 1 of G
400 Amps IGBT Inverter based Manual Metal Arc Welding machine to Model No. TORNADO 401 of ADOR Fontech or similar models (Full description as per enclosed Annexure) Note : OEM / Authorised dealer only
ARC RECTIFIER INVERTER BASED (IGBT) DOUBLE BRIDGE TYPE WELDING SET CONFIRMING TO IS: 4559/ 1993. RATED INPUT VOLTAGE: 415 V, THREE PHASE WITH TRAPPING TO COMPENSATE FOR VARIATION IN INPUT SUPPLY,MAXIM
Single Phase MMAW Arc Welding Plant IGBT Inverter type 250 Amps as per specification enclosed. Make :ESAB/ADOR/ELECTRO KOKO TAWA/YES TECNO/MIGATRONIC/MEMCO/WARPP .Note:Test reports to be submitted at
MBI ARC--MICRO WELDS INDIA Rectifier inverter based(IGTB) double bridge type Welding Set 240V,single Phase Brand: MBI ARC--MICRO WELDS INDIA (Detailed Description/Specification as per Product # 1 of G
Supply and installation of aerosol fire detection &suppression system cartridge of minimum 20gm (1 no with complete accessories) provide in RMPU control panel and inverter panel of SG AC coaches in li
Online UPS (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5580510 Dated : 05-12-2024 Bid Document 1/10 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 17 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : PRESIDENT OF INDIA ACTING THROUGH DIRECTOR; Directorate Of Purchase And Stores, Department of Atomic Energy, Directorate of Purchase and Stores, PMO;DPS/CPU/21/A3/4608 (.) MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Air Conditioner ( 23 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC High wall Split AC Technology of AC Non- Inverter ... Speed) Inverter (Variable ... Non- Inverter (Fixed ...