Loading…
Loading…
6,225 results • Best match
Online UPS (>10 KVA) With Battery (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7056526 Dated : 31-12-2025 Bid Document 1/8 Number of Auto Extension count 2 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 700000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 21000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 39 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : OS & Director Naval Materials Research Laboratory, Department of Defence Research & Development, Office of DG ( NS & M), 2/8 Ministry of Defence (The Director Nmrl, Ambernath)
PROMPT UPS 3.5-4.0, 220 TO 250 AH BATTERY, UPS Battery Rack, ELECTRIC MATERIAL WITH FITTING AND TESTING, UPS INSTALLATION TESTING COMMISSIONING GUARANTEE BOQ Title BOQ BID
HERMATIC(SEALED) COMPRESSOR FOR RECIPROCATING, NON-INVERTER, 2TON SPLIT/WINDOW AC UNIT, CAPACITY-2TR. MA ( 6 the number ten for arbitrary powers ), SEALED COMPRESSOR MODEL NO. PH 310 MZCS-4KTH-R-22, 1.5 TR, 230V 50 HZ- ROHS, TOSHIBA MAKE/EQIVALENT FOR V ( 15 the number ten for arbitrary powers ), DISPENSOR COMPRESSOR MODEL NO. THK 1330 MAKE TECUMSHA OR EQUIVALENT. SUITABLE FOR BLUE STER OR VOLTAS ( 5 the number ten for arbitrary powers )
Online UPS (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6534633 Dated : 05-08-2025 Bid Document 1/9 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Providing and Erection of on Line UPS System in A.B.C.D at NICU Dept. at Govt.Medical College and Hospital Aurangabad
High End Laptop - Notebook (Q2), All in One PC (V2) (Q2), Multifunction Machine MFM (V2) (Q2), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
Design, Supply, Installation, Testing and Commissioning (DSITC) of Roof Top Grid Interactive SPV based 50 KWp Solar Power System (Bifacial N-type Topcon Panel) with Solar optimizer or micro-inverter in the Bank’s Officers’ colony at Nalanda, Chembur, Mumbai
REPAIR/REPLACEMENT OF UG CABLE, LT PANEL/FEEDER PILLAR BOXES ,SWITCH GEARS, STREET LIGHTS, PERIMETER LIGHTS WITH CONNECTED ITEMS OF WORKS AND DG SETS AND REPAIR/RENEWAL OF INTERNAL WIRING AND LIGHT FITTINGS WITH RECHARGEABLE SMART INVERTER LED BATTEN
REPAIR/REPLACEMENT OF UG CABLE, LT PANEL/FEEDER PILLAR BOXES ,SWITCH GEARS, STREET LIGHTS, PERIMETER LIGHTS WITH CONNECTED ITEMS OF WORKS AND DG SETS AND REPAIR/RENEWAL OF INTERNAL WIRING AND LIGHT FITTINGS WITH RECHARGEABLE SMART INVERTER LED BATTEN
Online UPS (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6113126 Dated : 08-04-2025 Bid Document 1/8 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6760202 Dated : 27-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 41000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 30 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Gail India Ltd Gail India Ltd, Navi Mumbai 2/7 (Gail India Ltd)
WINDOW TYPE AIR CONDITIONER CAPACITY: 1.5 TR, TECHNOLOGY OF AC- INVERTER AC, BEE STAR RATING: 5, 2 TR INVERTER TYPE SPLIT AC DETAILED TECHNICAL SPECIFICATION AS PER ENCLOSURE, INSTALATTION AND COMMISSIONING OF 2 TR INVERTER TYPE SPLIT AC
Refrigeration Rotary Compressor Hermetic Type Non Inverter type Split Air conditioner capacity 1.5 TR, Refrigeration Rotary Compressor Hermetic Type Inverter type Split Air conditioner capacity 1.5 TR, Outdoor Unit with compressor Non-Inverter type ... for Inverter type ... Non- Inverter type ... for Inverter type ... Non- Inverter Split ... for Inverter Split ...
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2026/B/7060213 Dated : 01-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Wireless Keyboard and Mouse Combo (Q3), ANTIVIRUS (Q3), ALL IN ONE (Q3), LAPTOP CORE I3 WITH BAG (Q3), PRINTER (Q3), UPS battery with 1.0 kv with fitting (Q3)
1) Renovation of STPI, Bhosari, Pune office i/c interior work customized furniture, internal electrical work, EPABX, CCTV, Access Control, DG Set, UPS System, VRV Air-conditioning system etc. SH: Providing and fixing of exhaust pipe extension of 250 KVA Kirloskar make DG Set, STPI, Bhosari, Pune. 2) Installation of Advanced Static VAR Generation (ASVG) at STPI Bhosari, Pune. Subwork/Packages: As per NIT
Solar Inverter 1135 VA Inverter with Battery 16A Solar Panel Of 450 W with Wall MountStand At KAMOD V.P KAMOD Tal. Navapur Dist. Nandurbar
4 Chanel CCTV Setup (Q3), All in One Computer AMD Ryzen3 (Q3), INVERTER 5.5KVA Sinew Wave Inverter (Q3), SCREEN 24 INCH LED SCREEN (Q3)
Desktop computer, UPS 1 KVA, Rack server, Online UPS of rating 5.0 KVA with bty, 65 Inch Display Panel, 16 Channels NVR with 4K, Bullet camera, Color Printer, UTP cable CAT 6
Ceilling Array Microphone, Digital Sensor Proceesor, Port Audio Mixer, 500 Watt Audio Amplifier, 100 Watt Wall Mount Speaker, HDMI Cable, USB Extender Over Cat TX RX, Wall Mount Rack, Online UPS, Installation
Video Recorder For Cctv System-IS 9000, Online Ups-IS:9000, Layer 2 Access Switch, Laying & Installation Charges for Cables (with or without conduit) Suitable for CCTV System(Accessor, Surveillance Hard disk
All in One PC (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2), Computer Printer (V2) (Q2), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SOLAR INVERTER (Q3)
SOLAR PANEL 1KV, BATTERY 100, INVERTER, POWER CABLE, INSTALLATION
WATER JAR, INVERTER, BATTERY BOQ Title BOQ Title 3
All in one PC, inverter BOQ Title boq bid
Battery 12V 88AH, Lithium Battery 3 point 6V, Battery 12V 17AH Maintenance for UPS Maintenance Free ISI Mark, Battery Lead Acid 12V 70 AH Maintenance Free ISI Mark, Battery Lead Acid 12V 140 AH Maintenance Free ISI Mark, Battery 12V 200AH, Nickle ... 4AH, Lead Acid Battery 12V ...
Air Conditioner Air Conditioner ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC highwallsplitac Technology of AC Non- Inverter (Fixed Speed) Inverter ... Non- Inverter (Fixed ...
PROMPT UPS 3.5-4.0, 220 TO 250 AH BATTERY, UPS Battery Rack, ELECTRIC MATERIAL WITH FITTING AND TESTING, UPS INSTALLATION TESTING COMMISSIONING GUARANTEE, Office Chair BOQ Title BOQ BID
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - INS Deepak; INDIVIDUAL REPAIR CASE IRC FOR REPAIR SERVICEABILITY CHECKS OF 40 KVA UPS ONBOARD INS DEEPAK; Service Provider
Supplying, installation and commissionin [Supplying, installation and commissioning of 2 Ton inverter(4 Way) 5 Star Cassette AC, Suitable for Rated Cooling Capacity 6.5 KW, with the function of Cooling only, Inverter ( Variable speed) Type, Ceiling Type Unit Mounting Arrangement, with 100% copper coil, Eco friendly Refrigerant. BEE star rating : 5, Indian Seasonal Energy Efficiency Ratio of 5.0 or above with all accessories including pipe , mounting arrangement etc. as per standard specification available in market. As per Scope of Supply attached. Make: LG/Voltas/Panasonic/Hitachi/Samsung/Daikin/Godrej/Carrier/Mitsubishi/Lloyd only]
Supplying, installation and commissionin [Supplying, installation and commissioning of 2 Ton inverter(4 Way) 5 Star Cassette AC, Suitable for Rated Cooling Capacity 6.5 KW, with the function of Cooling only, Inverter ( Variable speed) Type, Ceiling Type Unit Mounting Arrangement, with 100% copper coil, Eco friendly Refrigerant. BEE star rating : 5, Indian Seasonal Energy Efficiency Ratio of 5.0 or above with all accessories including pipe , mounting arrangement etc. as per standard specification available in market. As per Scope of Supply attached. Make: LG/Voltas/Panasonic/Hitachi/Samsung/Daikin/Godrej/Carrier/Mitsubishi/Lloyd only]
Supply of battery operated inline ultrasonic water meters to be installed on tanker filling points at various wards location.
SOLAR POWER 2KV, SOLAR PANNEL, SOLAR PANNEL1, BATTERY, INVERTER, TRANSPORT
FRIDGE DUBLE DORE, INVERTER, WTHT BMI MACHINE, POWER CABLE, TRANSPORT
FIRE EXTINGUISHER, INVERTER SYSTEM COMPLETE INSTALLATION BOQ Title BOQ BID
Online UPS (>10 KVA) Without Battery (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6993245 Dated : 24-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Rate contract for the work of SITC of 150 Nos 1.5 TR Inverter type Split AC units ISEER rating 3.5 to 3.99 for various sites under BSNL, Electrical Circle, Mumbai. (Phase III) .PART A Supply Portion, PART B Installation, Testing and Commissioning
Entry and Mid Level Desktop Computer (Q2), Online UPS (V2) (Q2), Layer 2 Access Switch (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2), computer kiosk (Q3), Cat 6 Cable for Indoor Use (Q2)
Custom Bid for Services - SUPPLY, INSTALLATION AND FIXING OF 40 KVA ONLINE UPS WITH 42 AH BATTARY Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Ground Mounted Solar Power Plant Service
All in One PC (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2), Multifunction Printer (Print, Scan, Copy) (Q2), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
Emergency lighting and accessories (Portable Emergency Lighting System Tower type with Battery Bank) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6949698 Dated : 01-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Type Air Conditioner, Outdoor stand, Copper Pipes, Electrical Cable, PVC Hard Drain Pipe with support
Complete work of weekly maintenance of Main Plant Battery Banks (UPS Battery Banks and 24V DC Battery Banks) at 1X660 MW, U6, MHAGENCO, Deep Nagar, Bhusawal, Dist - Jalgaon, Maharashtra-425307 - Reg
Tablet Computers (Q2), Headset (V2) (Q2), Interactive Panels with CPU (Q2), Online UPS (V2) (Q2), PA Speaker (Q2), Microphone (Q2), Layer 2 Access Switch (V2) (Q2), Audio Digital Signal Processor (Q3), library management software (Q2)
Notesheet(Azurelaid) as per IS: 1848, Roller Ball Pen, Ball Point Pen, Gum (Paper Adhesives, Liquid Gum And Office Paste Type)-IS 2257, electrical box extension, Lead Acid Battery-IS 16046, Electrical Plugs-IS 1293, PVC Copper cable Single and multi core Circular Sheathed Cord with flexible Conductor as per IS:694, PVC Copper Cable, Single Core, Unsheathed cables with Flexible conductor as per IS:694
Online UPS (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6495391 Dated : 31-07-2025 Bid Document 1/11 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 92400 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 43 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ED(C&MM) A-0 ETM Section, C&MMM Group, NUCLEAR POWER CORPORATION OF INDIA LIMITED, Nabhikiya Urja Bhavan, Central Avenue Road Anushaktinagar, Mumbai 400094 (Executive Director, Cmm) Splitting 2/11
SOLAR PANNEL, BATTARY TUBLER, SOLAR INVERTER, SOLAR PANNEL STRUCTURE, COPPER CABLE
Fabrication, assembly, testing and supply of 1.3kVA High Frequency Inverter (Q3)
Supply, Installation & Commissioning of Inverter Based 110/230V DC SMAW Machine.