Loading…
Loading…
6,197 results • Best match
ELNOVA 1 KVA Online UPS Without Battery
Online UPS (>10 KVA) With Battery (Q2)
vertiv 3 KVA Online UPS Without Battery
Online UPS (>10 KVA) With Battery (Q2)
NUMAX 7.5 KVA Online UPS Without Battery
Online UPS (Version 2.0) (Q2) ( PAC Only )
Online UPS 20 KVA for Critical Infrastructures
BPE 10 KVA Online UPS Without Battery
Online UPS 20 KVA for Critical Infrastructures
Online UPS 5 KVA for Critical Infrastructures
Uniline 5 KVA Online UPS without Battery
2.0 KVA ONLINE UPS with inbuilt batteries
Luminous online UPS 2KVA/800VAh/15Min backup
NUMERIC 3 KVA Online UPS Without Battery
PROSTARM 7.5 KVA Online UPS Without Battery
Online UPS 5 KVA for Critical Infrastructures
Online UPS 10 KVA for Critical Infrastructures
NUMERIC 3 KVA Online UPS Without Battery
ELNOVA 1 KVA Online UPS Without Battery
Online UPS 5 KVA for Critical Infrastructures
Online UPS (>10 KVA) With Battery (Q2)
Online UPS (>10 KVA) Without Battery (Q2)
NUMAX 7.5 KVA Online UPS Without Battery
NUMAX 7.5 KVA Online UPS Without Battery
PROSTARM 3 KVA Online UPS Without Battery
BPE 5 KVA Online UPS Without Battery
BPE 2 KVA Online UPS Without Battery
NUMERIC 3 KVA Online UPS Without Battery
microtek 3 KVA Online UPS Without Battery
NUMERIC 3 KVA Online UPS Without Battery
Uniline 10 KVA Online UPS Without Battery
Online UPS 5 KVA for Critical Infrastructures
Online UPS 20 KVA for Critical Infrastructures
BPE 2 KVA Online UPS Without Battery
BPE 5 KVA Online UPS Without Battery
BPE 2 KVA Online UPS Without Battery
Lead Acid Battery-IS 16046 (Q3), Emery Cloth (Q3), Gum (Paper Adhesives, Liquid Gum And Office Paste Type)-IS 2257 (Q4), 15W-40 Diesel Engine Oil (Q3), Gypsum Building Plaster - Excluding Premixed-IS:2547 (Q3), Shovel Belcha - as per IS 274 part 1, part 2 and part 3 (Q3), M-Seal- IS 9197 (Q3), Iron Wire/Mild Steel Wire-IS 280 (Q3), General Purpose Grease as per IS:507 (Q3), Cotton Waste
Online UPS (V2) (Q2), All in One PC (V2) (Q2) (3 (3 ))
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/7035061 Dated : 23-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Bid Details EMD Detail Required No ePBG Detail Required No