Loading…
Loading…
2,835 results • Best match
UPS Battery, UPS, Power Card, DVD Writter, Keyboard Mouse Comb
SUPPLY BATTERY BOX FOR LHB NON-AC COACHES (120 AH VRLA BATTERIES) TO DRG.NO.CC91205, ALT-a.
Online Ups Modular Type (Q3) (3 (3 ))
Online Ups Modular Type (Q3) (3 (3 ))
NUMERIC 3 KVA Online UPS Without Battery
microtek 2 KVA Online UPS Without Battery
microtek 5 KVA Online UPS Without Battery
Uniline 6 KVA Online UPS Without Battery
Online Ups Modular Type (Q3) (3 (3 ))
Eaton 3 KVA Online UPS Without Battery
Online UPS 5 KVA for Critical Infrastructures
Online UPS 10 KVA for Critical Infrastructures
KEPTRON ONLINE UPS 2KVA 60 MTS BACKUP
PROSTARM 3 KVA Online UPS Without Battery
Online UPS 5 KVA for Critical Infrastructures
Online UPS 5 KVA for Critical Infrastructures
Online UPS 5 KVA for Critical Infrastructures
NUMERIC 3 KVA Online UPS Without Battery
PROSTARM 6 KVA Online UPS Without Battery
Uniline 3 KVA Online UPS Without Battery
Uniline 3 KVA Online UPS Without Battery
ELNOVA 10 KVA Online UPS Without Battery
BPE 5 KVA Online UPS Without Battery
BPE 5 KVA Online UPS Without Battery
Online UPS 5 KVA for Critical Infrastructures
Lead Acid Storage Batteries For Motor Vehicles with Light Weight and High Cranking Performance (V2) Conforming to IS 14257 (Q3), Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3), Stationary Lead Acid Batteries (with Tubular Positive Plates) in Monobloc Container (V2) Conforming To IS 13369 (Q3) ( ( 3 3 ))
LEAD ACID BATTERY 8V 500 AH TO SPEC.NO.DEL/SPN/193 [REV-03],JULY 98.EMD PART NO.10631528. Accepted Make: celtek
12 VOLT LEAD ACID BATTERY AS PER GEM PRODUCT ID-5116877-16603723317 OR MODEL NK-12-9 MAKE KOMATSOO OR SIMILAR
18AH 12 volt Lead acid battery, warrenty:1 year, No. of cell per battery: 06 cells for 12V battery. Make: AMARON
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6480673 Dated : 22-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6603892 Dated : 23-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting