Loading…
Loading…
2,841 results • Best match
microtek Inverter 2.5 KVA
Inverter Window Air Conditioner
Inverter, Stand, Wire, 3 pin switch, 3 pin socket
05 KVA Inverter Luminous, Inverter Battery 200 Ah Exide, ECG Paper Roll, MCB 100 Amp, Flex Board
Design, Manufacture, Testing, Supply and Delivery of 220V 600Ah VRLA DC Batteries
26 Ah 12 volt Solar SMF Batteries BIS marked Two years warranty Methods of connections between cells : Bolted, overall dimension of each battery ( Length X width X Height ) in MM: 160 X 130 X 170
Emergency lighting and accessories (Portable Emergency Lighting System Tower type with Battery Bank Bidder Turnover (Last 3 Years) 250 Lakh (s)
UPS 5 KVA, SMF Batteries 12 V and 42 Ah, External Isolation Transformer K13, Battery Monitoring System, Management Laptop, Copper Strip, Insulated single core copper wire, Insulated 3 Core copper wire, Supply Installation Testing and Commissioning of Earthing System for Isolation Transformer, CAMC 1st year, CAMC 2nd year, CAMC 3rd year, CAMC 4th year, CAMC 5th year
10 KVA Inverter with batteries (Q3), 15 KVA Inverter with batteries (Q3)
5.2 KVA inverter with 04 x 150 Ah & 12 volt batteries including inverter, battery stand and all mtrl
Tender for Supply Installation Testing and Commissioning of Batteries for Data Centre UPS System
12V 120 AH Sealed Maintenance Free Battery as per JIS8702C or IS certifications of SMF / VRLA Battery, with at least 2 years Warranty from date of supply. Make- Exide, Okaya, HBL, Amaron, Quanta, Su-
Inverter (V2) (Q2) (3 (3 ))
Inverter (V2) (Q2) (3 (3 ))
Inverter (V2) (Q2) (3 (3 ))
Hot & Cold Inverter Split AC
Inverter with sine wave output
Inverter with sine wave output
Inverter with sine wave output
Inverter (V2) (Q2) ( ( 3 3 ))
Inverter (V2) (Q2) (3 (3 ))
Inverter (V2) (Q2) ( ( 3 3 ))
REPAIR OF 20 KVA INVERTER
1KVA Inverter, Transparent Tape 2inch, Glue Stick, Drawing Sheet, Fevicol
Server (Q2), Lead Acid Battery-IS 16046 (Q3), Multifunction Machines MFM (Q2)
Electrical Services in Special Repair Upgradation of E.I in Newly Proposed Burn Unit in Rajindra Hospital at Patiala. Online UPS 40 KVA and 30KW
Online UPS 10 KVA for Critical Infrastructures Average Turn Over of Last 3 Years 50 Lakh (s) Experience with Gov. Required 3 Year (s)
Online UPS 5 KVA for Critical Infrastructures Average Turn Over of Last 3 Years 25 Lakh (s) Experience with Gov. Required 3 Year (s)
Online UPS 5 KVA for Critical Infrastructures Average Turn Over of Last 3 Years 6 Lakh (s) Experience with Gov. Required 10 Year (s)
Online UPS 10 KVA for Critical Infrastructures Average Turn Over of Last 3 Years 2 Lakh (s) Experience with Gov. Required 10 Year (s)
Maintenance Contract for POWERCON 12 KVA UPS (including all parts of UPS, including batteries) for a period of 3 years-1647