Loading…
Loading…
5,100 results • Best match
LG 1 And Half Ton Inverter Split AC, V-Guard Stabilizer 4 KVA, Compressor Wall Mount, Copper Pipe For AC, Installation And Fixation Of Split AC,Stabilizer Wiring And Man Power Charges Etc
Customized AMC/CMC for Pre-owned Products - Non Comprehensive Biennial Maintenance Contract for breakdown and preventive maintenance of battery chargers and inverters in BOP areas of NNTPS; Dubas Engineering Pvt Ltd; Annual Maintenance Contract (AMC)..
Purchase of Batteries for CIVIL Dept.
Maintenance of 360V UPS batteries 220V and 24V DC batteries in Unit IV and V 220 V DC batteries in Indoor Switchyard II and 48V DC CC batteries in Indoor Switchyard II for the period from the date of commencement of work upto 31 03 2022
Online UPS Online UPS ( 5 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 3.0 KVA 3.0 KVA Technology IGBT-PWM without inbuilt isolation transformer MOSFET-PWM with inbuilt isolation transformer, IGBT-PWM with inbuilt isolation transformer, IGBT-PWM without inbuilt isolation transformer Input Power single phase 160V - 260V sinewave, 50Hz single phase 160V - 260V sinewave, 50Hz Output power Single phase 230V +/-1% sinewave 50 Hz Single phase 230V +/-1% sinewave 50 Hz Backup time (Minutes) 30 30 Minimum VAH (VAH) 3024 3000, 3024 Warranty for UPS (Years) 2 2, 3 Movable trolly for Batteries Without trollery but with rack Without trollery but with rack Warranty for battery 2 2 Degree of Protection IP21 IP21, IP20 Cabling 5 meters for input and out put Without With, Without 1/4 Paralleling kit for synchronising Without With, Without Installation and Commissioning Yes - CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.2 - Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I, II&III) - FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 - Voltage Regulation from no load to full load (%) /= 3% - 20% Overload limit for minimum 10 minutes Yes - Overall Efficiency (%) >/=90% - Total Harmonic Distortion(THD) (%) Maximum 3% - 50% Overload limit for minimum 1 minutes Yes - PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes - Protection of Over voltage, Short Circuit & over load at UPS output terminal Yes - METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage, Output AC Volt age, Current, Frequency, Battery Voltage and Current Yes - Indicators for mains presence, Battery charging and discharging, Output Over Load, Low Battery Voltage Yes - REPORTS AND CERTIFICATION Damp Heat : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007) Yes - 2/4 Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes - Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes - Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes - Type Test Certificate No. ETDC(MH)/TR/T&M/138 3 - Type Test Certificate date 07-02-2006 - Name of Lab ETDC MUHALI - Address of Lab B-108 PH-8 MUHALI - As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Yes - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Ramesan Karalanchalil 600009, HQ Dakshin Bharat Area Island Grounds Chennai 5 15
TENDER FOR ATTENDING THE FAULTS IN SPLIT, WINDOW, INVERTER AC UNITS IN NAGERCOIL BA FOR TWO YEARS
Supply and Installation of 12 Volt / 150 AH Tall Tubular Battery for 3KVA Inverter in Principal room
Design, Supply, Erection, Installation and commissioning of INVERTER BASED MIG MAG SYNERGIC PULSE WELDING PLANT 400 AMP.
E D Brand Inverter Type wall mount 1.5 ton Split Air Conditioner with 5 star rating-2018
E D Brand Inverter Type wall mount 1.5 ton Split Air Conditioner with 5 star rating - 2018
INVERTER BASED MIG MAG SYNERGIC PULSE WELDING PLANT, 400 AMPS , AIR COOLED TORCH AS PER SPECIFICATION ATTACHED.
SET OF SURGE PROTECTION DEVICE FOR DELTA INVERTER IN SOLAR PLANT TO THE DETAILS AS PER ENCLOSURE
TTPS ES EM III Discharging and charging of 24V DC System Batteries 220V DC System Batteries UPS System batteries and 48V DC Carrier Communication System Batteries at Switch Yard II
Customized AMC/CMC for Pre-owned Products - NTPL BMC for 2X130KVA UPS system in Unit 1 2 outsourcing maintenance contract; VERTIV ENERGY PRIVATE LIMITED; Comprehensive Maintenance Contract (CMC); Quarterly; Yes
1.5 Ton 5 Star Pure Air inverter Split AC wiht 4 Way Swing (Copper, 6-in-1 Adjustable Mode, Anit dust
North Tvlr, South TVLR, East TVLR, Uthukottai and Periyapalayam Sub divisions in respect of Thiruvallur Division in respect of Kanchipuram Electricity Distribution Circle
Supply of Battery operated e-cart for Solid Waste Management Activities to the Village Panchayats of Kovilpatti, Kayathar and Pudur Panchayat Unions in Thoothukudi District (PACKAGE NO. 03)
Supply of Battery operated e-cart for Solid Waste Management Activities to the Village Panchayats of Thoothukudi , Ottapidaram and Vilathikulam Panchayat Unions in Thoothukudi District. (Package No. 01)
Construction of Battery Room in the first floor of Kodayar Power House I, to accommodate additional batteries and UPS battery with battery charger by M/s. BHEL Ltd., in view of the ongoing Renovation, Modernisation and uprating of the Kodayar Power
SUPPLY OF 15KVA ONLINE UPS AND 100AH BATTERIES (WITH BATTERIES RACK )
Line Interactive UPS with AVR (V2) (Q2), Online UPS (V2) (Q2)
Procurement of Digital Controlled IGBT Inverter Based GMAW Welding Machine (400 Amps) - BHEL/Trichy, BHEL/Ranipet, BHEL/Bhopal, BHEL/Varanasi, BHEL/Haridwar each 1 set
Battery 12V, 100AH Maint. Free sealed, SMS BATTERY MAINT. FREE/12V/28AH, SMF BATTERY 12V/42AH FOR APL3
Comprehensive Annual Maintenance Contract for maintenance of out of warranty Medha (M/s. Medha Servo Drives Pvt. Ltd.) make 25kVA inverters fitted in Roof Mounted AC coaches of Southern Railway for a period of three years
Custom Bid for Services - Biennial Maintenance Contract of 1123 Nos Non Inverter split AC units 266 Nos Inverter split AC units 9 Nos Cassette Acs in Township for the years 2025 to 2027 Similar Category Annual Maintenance service-AIR CONDITIONER
MOEI and fans including R/M of Substation, Dg sets ,Water supply pumpsets, AC unitsat Rajive gandi Ninaivagam Sriperumbudar Subwork/Packages: Providing of Batteries for the exisiting inverter and online ups cabin fans etc
MOEI and Fans i/c RMO of Street light, water supply pumps, AC Servicing etc. at Office Building Br. MSME DFO, Coimbatore for the Year 2024-25. SH : SITC of 6 KVA UPS at Office Building Br. MSME DFO, Coimbatore.
Annual Comprehensive Maintenance of conferencing units, VRF AC System, FAP, 10 KVA UPS installed at C-4-C C Wing Special Bureau, GPOA, Rajaji Bhawan, Besant Nagar, Chennai-600 090. SH :- Replacement of defective wall mounted fans and LED Fittings
Purchase 2 No of BATTERY OPERATED VEHICLE Sealed Lead Acid Battery and 1 No Supply and delivery of TATA ACE GOLD With Full body Vehicle in Kannivadi Town Panchayat
Construction of Battery Room in the first floor of Kodayar Power House I, to accommodate additional batteries and UPS battery with battery charger by M/s. BHEL Ltd., in view of the ongoing Renovation, Modernisation and uprating of the Kodayar PH-I
Supply and Installation of the FOX ESS 10 Kw on Grid Inverter is high efficiency three phase solar inverter designed for commercial and residential roof top solar systems in the maintenance of 120 flats of Block D in Sno.738-part etc at MKB Nagar
Providing 1 No Inverter 5 star rated 1.5 TR Split type AC Units at CGHS Dispenasry, Adyar, Chennai20
SITC of Solar MPPT Hybrid PCU/Inverter of 15 KVA/240V (3P- 3P) capacity installed Solar system (Q3) ()
Supply, installation, wiring, testing and commissioning of four sets of 1.5 Ton Inverter Type Split Air Conditioner Unit
COPPER CONDENSER COIL SUITABLE FOR DUAL INVERTER 1.5 TON GODREJ,LG,VOLTAS,BLUESTAR,PANASONIC ,WHIRLPOOL MAKE SPLIT AC .
Stationary Lead Acid Batteries (with Tubular Positive Plates) in Monobloc Containers as per IS 13369 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6857609 Dated : 10-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
All in One PC (Q2), Computer Printers (Q2), Online UPS (V2) (Q2)
PURCHASE OF 6KVA/192 VDC DOUBLE CONVERSION ONLINE UPS WITH ISOLATION TRANSFORMER
Online UPS Online UPS ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 3.0 KVA 3.0kva Technology IGBT-PWM with inbuilt isolation transformer igbt-pwmwithinbuiltisol ationtransformer Input Power single phase 160V - 260V sinewave, 50Hz singlephase160v-260vs inewave50hz Output power Single phase 230V +/-1% sinewave 50 Hz Single phase 230V +/-1% sinewave 50 Hz, 3 Phase 400V +/-1% with alternative user setable setting of 380V +/-1% 50 Hz Backup time (Minutes) 60 60 Minimum VAH (VAH) 4800 Warranty for UPS (Years) 2 1, 2, 3, 4, 5 Movable trolly for Batteries Without trollery but with rack With, Without, Without trollery but with rack Warranty for battery 2 1, 2 Degree of Protection IP20 IP21, IP20 Cabling 5 meters for input and out put Without With, Without Paralleling kit for Without With, Without 1/4 synchronising Installation and Commissioning Yes - CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.2 - Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I, II&III) - FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 - Voltage Regulation from no load to full load (%) /= 3% - 20% Overload limit for minimum 10 minutes Yes - Overall Efficiency (%) >/=90% - Total Harmonic Distortion(THD) (%) Maximum 3% - 50% Overload limit for minimum 1 minutes Yes - PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes - Protection of Over voltage, Short Circuit & over load at UPS output terminal Yes - METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage, Output AC Volt age, Current, Frequency, Battery Voltage and Current Yes - Indicators for mains presence, Battery charging and discharging, Output Over Load, Low Battery Voltage Yes - REPORTS AND CERTIFICATION Damp Heat : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007) Yes - 2/4 Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes - Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes - Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes - Type Test Certificate No. T-57878/3 - Type Test Certificate date 11.4.2007 - Name of Lab ETDC - Address of Lab RING ROAD, PEENYA INDUSTRIAL AREA, BANGALORE-58 - As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Not applicable presently - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Arul Doss S S 612001, O/o SSPOs Kumbakonam Division Kumbakonam 1 15 EMD Required No ePBG Required No
Online UPS Online UPS ( 3 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 5.0 KVA 5.0kva Technology IGBT-PWM with inbuilt isolation transformer igbt-pwmwithinbuiltisol ationtransformer Input Power single phase 160V - 260V sinewave, 50Hz singlephase160v-260vs inewave50hz Output power Single phase 230V +/-1% sinewave 50 Hz Single phase 230V +/-1% sinewave 50 Hz, 3 Phase 400V +/-1% with alternative user setable setting of 380V +/-1% 50 Hz Backup time (Minutes) 60 60 Minimum VAH (VAH) 8000 Warranty for UPS (Years) 2 1, 2, 3, 4, 5 Movable trolly for Batteries Without trollery but with rack With, Without, Without trollery but with rack Warranty for battery 2 1, 2 Degree of Protection IP21 IP21, IP20 Cabling 5 meters for input and out put Without With, Without Paralleling kit for Without With, Without 1/4 synchronising Installation and Commissioning Yes - CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.2 - Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I, II&III) - FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 - Voltage Regulation from no load to full load (%) /= 3% - 20% Overload limit for minimum 10 minutes Yes - Overall Efficiency (%) >/=90% - Total Harmonic Distortion(THD) (%) Maximum 3% - 50% Overload limit for minimum 1 minutes Yes - PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes - Protection of Over voltage, Short Circuit & over load at UPS output terminal Yes - METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage, Output AC Volt age, Current, Frequency, Battery Voltage and Current Yes - Indicators for mains presence, Battery charging and discharging, Output Over Load, Low Battery Voltage Yes - REPORTS AND CERTIFICATION Damp Heat : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007) Yes - 2/4 Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes - Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes - Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes - Type Test Certificate No. 1110716052K - Type Test Certificate date 11 JULY2016 - Name of Lab QRO - Address of Lab C-33, LAWERENCE ROAD DELHI, 11OO35 - As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Yes - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Arul Doss S S 612001, O/o SSPOs Kumbakonam Division Kumbakonam 3 15 EMD Required No ePBG Required No
Online UPS Online UPS ( 2 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 5.0 KVA 5.0kva Technology IGBT-PWM with inbuilt isolation transformer igbt-pwmwithinbuiltisol ationtransformer Input Power single phase 160V - 260V sinewave, 50Hz singlephase160v-260vs inewave50hz Output power Single phase 230V +/-1% sinewave 50 Hz Single phase 230V +/-1% sinewave 50 Hz, 3 Phase 400V +/-1% with alternative user setable setting of 380V +/-1% 50 Hz Backup time (Minutes) 30 30 Minimum VAH (VAH) 4992 Warranty for UPS (Years) 2 1, 2, 3, 4, 5 Movable trolly for Batteries Without trollery but with rack With, Without, Without trollery but with rack Warranty for battery 2 1, 2 Degree of Protection IP20 IP21, IP20 Cabling 5 meters for input and out put Without With, Without Paralleling kit for Without With, Without 1/4 synchronising Installation and Commissioning Yes - CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.2 - Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I, II&III) - FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 - Voltage Regulation from no load to full load (%) /= 3% - 20% Overload limit for minimum 10 minutes Yes - Overall Efficiency (%) >/=90% - Total Harmonic Distortion(THD) (%) Maximum 3% - 50% Overload limit for minimum 1 minutes Yes - PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes - Protection of Over voltage, Short Circuit & over load at UPS output terminal Yes - METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage, Output AC Volt age, Current, Frequency, Battery Voltage and Current Yes - Indicators for mains presence, Battery charging and discharging, Output Over Load, Low Battery Voltage Yes - REPORTS AND CERTIFICATION Damp Heat : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007) Yes - 2/4 Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes - Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes - Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes - Type Test Certificate No. QVC - Type Test Certificate date 16-01-2016 - Name of Lab NATIONAL TEST HOUSE - Address of Lab GHAZIABAD - As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Yes - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Arul Doss S S 612001, O/o SSPOs Kumbakonam Division Kumbakonam 2 15 EMD Required No ePBG Required No
Providing Comprehensive Maintenance of Fire detection Alarm system PA System Hydrant System Sprinkler System Fire Extinguisher System Emergency lighting system UPS System Signage System Closed Circuit Television System at 1848 KVP Cbe
Providing Comprehensive Maintenance of Fire detection Alarm system Public Address System Hydrant System Sprinkler System Fire Extinguisher System Emergency lighting system UPS System Signage System CCTV at 1848 MSB at Kavundampalayam Cbe
Supply of Battery operated e-cart for Solid Waste Management Activities to the Village Panchayats of Karungulam, Srivaikundam, Alwarthirunagari, Tiruchendur, Udangudi and SattankulamPanchayat Unions in Thoothukudi District (PACKAGE NO. 02)
Supply, Installation, Testing and Commissioning of 2TR & 3TR Inverter type Cassette ACs at the Reserve Bank Staff College, Chennai
Supply of TDK CXA-0370 PCU-P154E Inverter card for CCFL Lamps of 15 inch LCD of panel PC.
Supply of 1.5 Ton 5 Star Inverter Split Air Conditioner mentioned below for Library, Government College of Engineering, Tirunelveli
Additional Electrical Works i/c compound light and S/F of inverter at Type V Quarters,Ashok Nagar,Chennai
Custom Bid for Services - CC023322 Repair of DCUBridge Crane Travel and Bucket Motion Inverter at Ms Kone Crane Workshop
Supply, installation, wiring, testing and commissioning of 04 (Four) sets of 1.5 Ton Inverter type Split Air Conditioner Units