Loading…
Loading…
4,440 results • Best match
1 KVA UPS
300 kVA UPS
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2026/B/7150716 Dated : 26-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7035559 Dated : 30-12-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 87792 Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Bid Details EMD Detail Required No ePBG Detail Required No
Procurement and supply, installation, commissioning and AT of 408V VRLA Battery
Urgent supply and delivery of 12 V, 65 AH VRLA SMF Battries of 40 kVA UPS and 12V,18AH VRLA SMF Batteries for 4 nos of lifts including buy back of existing same related battery at Onda SSH, Bankura
Supply and Installation of 12V 26AH SMF Battery at Network
exide 12 v 65 ah smf battery with buy back
12V-7.2AH SMF BATTERY UNDER BUY BACK OF DEFECTIVE BATTERY
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online Ups-IS:9000 (Q3) ()
Online Ups Modular Type (Q3)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online Ups Modular Type (Q3)
Online Ups-IS:9000 (Q3) ()
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS (Version 2.0) (Q2)
Online UPS Rack Mountable Type
online ups with installation (Q3)
Online Ups-IS:9000 (Q3)
Online Ups-IS:9000 (Q3)