Loading…
Loading…
2,748 results • Best match
Work No-62 Ward No-09 Construction work of RCC drain from Pakka Pond to FCI godown in Ramganj Pakka Pond.
Providing and fixing High Bay LED Lights inside Godown No 4 along with other allied works at CW Greater Noida UP
REPAIR REPLACEMENT OF TRUSS PURLIN, ROOF SHEETING, POLYCARBONATE SHEET, VALLEY GUTTER ETC OF WAREHOUSE SHEDS IN NEW AREA INSIDE COD UNDER AGE BR I OF GE I KANPUR
REPAIR REPLACEMENT OF TRUSS PURLIN, ROOF SHEETING, POLYCARBONATE SHEET, VALLEY GUTTER ETC OF WAREHOUSE SHEDS IN NEW AREA INSIDE COD UNDER AGE BR I OF GE I KANPUR
Custom Bid for Services - HANDLING AT RWC YAMUNA BRDIGE AGRA APPOINTMENT OF SERVICE PROVIDER FOR HANDLING RAIL ROAD BORNE CARGO AT RAIL SIDE WAREHOUSE COMPLEX YAMUNA BRIDGE AGRA
As per BOQ
4- Construction work of RCC drain from Tirahe to Cold Storage on Old Somna Road under Municipal Council Khair.
All terms and conditions mentioned in tender docs. PROVIDING AND DISPLAYING ZERO KA DUM PROMOTIONAL CREATIVE SHOWROOM, GODOWN AND DELIVERY VEHICLES AT JHANSI LPG BOTTLING PLANT.
Unbranded 1200 X 900 (Length x Breadth) in mm Dunnage Pallets Made, Unbranded 1200 X 900 (Length x Breadth) in mm Dunnage Pallets Made From Recycled Plastic Wastes For Warehousing Applications
Unbranded 1200 X 900 (Length x Breadth) in mm Dunnage Pallets Made From Recycled Plastic Wastes For Warehousing Applications Brand: NA (Detailed Description/Specification as per Product # 1 of GeM Con
Unbranded 1200 X 900 (Length x Breadth) in mm Dunnage Pallets Made From Recycled Plastic Wastes For Warehousing Applications Brand: NA (Detailed Description/Specification as per Product # 1 of GeM Con
Construction of Grain Godown Family Welfare Centre and Primary School including E and M at GC CRPF Trishundi Amethi UP Subwork/Packages: Main work
HIRING OF SERVICES FOR TRANSPORTATION OF MATERIAL BY TRUCK/TRAILER FROM GAIL GAS WAREHOUSE, ANYWHERE TO ANYWHERE BASIS FOR A PERIOD OF THREE YEARS ON RATE CONTRACT (RC) BASIS
M/O Green Belt (C/O R.C.C. Boundary Wall and Brick Boundary Wall in front of B-68 to B-79 and infront of warehouse in sector-67), Noida
Construction of drain and road construction work through CC tiles from Salim warehouse to Sunil house in lane no. 02, phase-02, ward 40, Mohalla Choudhary Bhim Singh Nagar
Construction of Passenger Terminal Building Warehouse cargo admin building and external development and allied services on EPC Mode (Design and Build Basis) at ICP Sunauli on Indo Nepal Border
Lohamandi Zone, Ward No. 37 Work regarding drain repair and construction of a CC road in Sector-4, from Pandit Ji house (near the warehouse) to Javed Bhai house.
Lohamandi Zone, Ward No. 37 Work regarding drain repair and construction of a CC road in Sector-4, from Pandit Ji house (near the warehouse) to Javed Bhai house.
Construction work of CC road and drain from Balbinder house via Sunaina house up to Pradeep Gupta godown in Ward No. 03.
Const of CC Interlocking and Drain on both side in Nagar Panchayat Jawan at Ward No 06 Bagalo Wali Gali To Godown
Zone-1 Chhatta Ward No. 78 Motiganj Repair work of CC floor and drain including interlocking in Jeera Wala Godown, Boss Darwaza.
8. CONSTRUCTION OF 100 METRIC TON CAPACITY GODOWN WITH R.C.C SLAB TO BE CONSTRUCTED AT KISAN SEWA SEHKARI SAMITI LTD. SAMHO ETAWAH
CONSTRUCTION OF 5000 M.T. SUGAR GODOWN AND APPROACH ROAD IN CAMPUS OF THE KISAN SEHAKARI CHINNI MILLS LTD.- GAJRAULA (AMROHA) UTTAR PRADESH
Construction of 100 Metric Ton Capacity Godown with RCC Slab to be constructed at Sadhan Sahakari Samiti Ltd. Nooh Khas, Awagarh, Etah
LINE 21 WARD NO 14 MAKLING TIN SHED IN FRONT OF VEHICLE GODOWN OF NAGAR PANCHAYAT DADHIYAL FOOD STREET SITE ( SIX SHOPS)
E-tender under two-bid system for construction of godown under PEG Scheme-2008 for FCI Storage requirements at Kanshi Ram Nagar
CONSTRUCTION OF 100 METRIC TON CAPACITY GODOWN WITH R.C.C SLAB TO BE CONSTRUCTED AT PER DETAIL MENTIONED ABOVE CHUNGI DHANGOL S.S.S. Ltd
11. CONSTRUCTION OF 100 METRIC TON CAPACITY GODOWN WITH R.C.C SLAB TO BE CONSTRUCTED AT SADHAN SEHKARI SAMITI LTD. NYAMATPUR BAIHARI AURAIYYA
Construction of 100 Metric Ton Capacity Godown with RCC Slab to be constructed at Sadhan Sahakari Samiti Ltd., Bulaki Nagar, Aliganj, Etah
Maintenance and repairing of APF (12x68m), (12x60) and front C type shop and FCI Godown (12x48m) at N.M.Y. jais Mandi. Distt. Amethi
E-tender under two-bid system for construction of godown under PEG Scheme-2008 for FCI Storage requirements at Shravasti,Gilaula Tahsil
CONSTRUCTION OF NEW BOUNDRY WALL AND REPAIRING OF BOUNDRY WALL CONCERTINA COIL FENCING BOUNDRY WALL AND GATE FOR PAHADPUR GODOWN GOLA SAMITI
12. CONSTRUCTION OF 100 METRIC TON CAPACITY GODOWN WITH R.C.C SLAB TO BE CONSTRUCTED AT SADHAN SEHKARI SAMITI LTD. KHANPUR PHAPHOOND AURAIYYA
Ward No 15 Me Saleem Ke Godown Se Takiya Wale Shamshan Ghat Tak CC Road and RCC Nali Nirman Karya Length 240mtr
Roof repair work,wall plastering and painting and electrification work of the office of Excise Inspector Area-1 located at Excise Godown
Construction of 100 Metric Ton Capacity Godown with RCC Slab to be constructed at Sadhan Sahakari Samiti Ltd.,Gahetu, Nidhauli Kalan, Etah
Construction of an RCC drain in Ward No. 31 Mankamau extending from the transformer near the large canal to the gas godown.
Road upgradation works along with other essential civil works, raising of platform for godown 1 and electrical upgradation work at CW Chirgaon.
Poly-pallets for bag storage godowns (V2) Conforming to IS 13664 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
WARD NO. 10 MAIN QAMIL KE KHET SE PRASTAWIT BHARAT COLD STORAGE KI OR CC ROAD AND NALI NIRMNA KARYA
Heavy duty polly pallets 1200 mm and 1100 mm and 160 mm 6 ton capacity, Heavy duty storage system racks single tier 2475 mm and 1600 mm and 1000 mm, hand pallet truck 2500 kg, semi electric stacker lift height 3000 mm 1500 kg capacity, zinc chrome platform hand truck 350 kg capacity, mounting on fpo crate on louvre panel 350 mm and 210 mm and 200 mm
Road work
As per BOQ
Under District Lucknow, Construction of Interlocking road and drain from Abhay Singh house to Raj Kumar house near Indian Gas warehouse in Kanusi in Kesari Khera ward, Lot No 2
RCC construction work and screen mesh work for drainage of water from Mau Mandi Wali Gali Chakki to Petrol Old Seed Warehouse via Vedprakash Pratihar house in Nagar Panchayat Bilram
Ward No. 44, Mohalla Murli Nagar Construction of a CC road and drain from the old gate of Vibhav Glass Factory to the front of Jai Shiv Bharat Gas Warehouse.
Construction of interlocking paving and drains on the footpaths on both sides of the road, stretching from Taha Apartment to the scrap warehouse in the Barudkhana locality of Golaganj Ward
Under District Deoria, Construction work of road from Khand Bankata Budhi Marg Pitch Marg to Ahirauli Baghel South Patti Agricultural Warehouse (Hand in Hand Strip Pitch Road), Lot No 15
M/o Road (Renovation and Beautification of Footpath, Drain, Central verge and T-points etc. on DS Road from T-point of kailash Road to Central Warehouse Sector-68) Noida
Under District Ayodhya, Construction of Warehouse Tuck Road of Horizon Kaushal from the front of Medical College Gate No. 02 in Darshan Nagar Ward via Savitri house ,Lot No 3