Loading…
Loading…
535 results • Best match
Potable water purification system Potable Water Purification System ( 8 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values EQUIPMENT TYPE & FEATURES Type Electrically Operated Reverse ... based water purifier Electrically ... based water purifier Ultraviolet ... of RO system Conforming ...
Potable water purification system Potable Water Purification System ( 3 ) Technical Specifications Specification Specification Name Values Allowed Values EQUIPMENT TYPE & FEATURES Type Electrically Operated Reverse Osmosis based water purifier ... based water purifier Ultraviolet ... of RO system Conforming ...
Water/Tea Jug 8 litre, Double Door Frost Free Refridgerator, Water Cooler
zero b Reverse Osmosis based Water Treatment System above 50 LPH, zero b Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above 50 LPH and upto100 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction of Self ... Contained Water Cooler "
zero b Reverse Osmosis based Water Treatment System above 50 LPH, zero b Reverse Osmosis based Water Treatment System above 50 LPH Capacity Above 50 LPH and upto100 LPH Storage Tank (Inclusive in the scope of Supply) Yes As per "Construction of Self ... Contained Water Cooler "
Portable Water Purifiers or Filters (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6974055 Dated : 07-12-2025 Bid Document 1/7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 50000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Construction of office Building for RBI at Naya Raipur (C.G.) Phase-II. SH:- Providing internal EI and light fixtures, facade lighting, security equipments, CCTV, irrigation system, STP, cabling, water cooler, solar photovoltaic power system, signage, laser based smoke detector system and comprehensive annual maintenance including GFRC cladding, and horticulture operation etc
Construction of office Building for RBI at Naya Raipur (C.G.) Phase-II. SH:- Providing internal EI and light fixeres, facade lighting, security equipments, CCTV, irrigation system, STP, cabling, water cooler, solar photovoltaic power system, signage, laser based smoke detector system and comprehensive annual maintenance including GFRC cladding, and horiculture operation etc.
As per SOW
Patient Bed (Fowler and Semi Fowler), Almirah Steel-IS:3312, Potable water purification system with inbuilt water cooler.
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6985981 Dated : 16-12-2025 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Bid Number : GEM/2026/B/7071849 Dated : 05-01-2026 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Bid Number : GEM/2026/B/7073672 Dated : 05-01-2026 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Operation and Maintenance of Civil, Electrical and Horticulture Works, MEP Equipment such as DG Sets, ROs and Water Coolers, Transformer, HT, LT Panels, Water Pumps, etc.
Providing Electrification Work To L.E.D. Bollard , R.O. Water Purifier & Alkaline Water Ionizer at Construction of Rajbhawan , Chief Minister House , Minister Bungalow & Senior Officer Residence , Sector 18 Nava Raipur , C.G
Facility Management Services - LumpSum Based - AMC for Repair & maintenance of Air Conditioners, Water Purifiers and Purifier cum Coolers of Non-ITC building at IVC, VVC & NSN of SECL HQ Bilaspur; O&M of Electrical Work; Consumables to be provided by..
Average Turn Over of Last 3 Years 150 Lakh (s) Experience with Gov. Required 3 Year (s) Potable Water Purification System ( 25000 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values ... operated water purifier Gravity ... operated water purifier Ultraviolet ... of RO system Conforming ...
Biennial contract for OandM of package AC in hospital and old adminbuilding, maintenance of window and split AC and water cooler ofdifferent building-NTPC Unchahar
Custom Bid for Services - 200153033 BMC for Windows Split AC, package AC, Water Coolers & Desert Coolers in NTPC- Sipat for Year 2026-28 Similar Category Operation and Maintenance Power House/Power Plant
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - 4, 1; 12; PACKAGE-3 : Water purifier and conditioning system maintenance involving basic servicing plus maintenance of filters and and membranePackage 3
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6705375 Dated : 19-09-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6529238 Dated : 04-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Comprehensive Annual Maintenance Contract of Split ACs Water Coolers of ACVS Department for the period of 2years in NMDC STEEL LIMITED; as per tender; as per tender
Foam Mattress, pillows- synthetic, Television TV, TABLE FAN WALL MOUNT FAN/CEILING MOUNT FAN - as per IS 555, hot or cold water dispenser, Plastic Moulded Chair-IS 13713, Restaurant Table Bidder Turnover (Last 3 Years) 4 Lakh (s)
Potable water purification system Potable Water Purification System ( 4 ) Technical Specifications Specification Specification Name Values Allowed Values EQUIPMENT TYPE & FEATURES Type Electrically Operated Reverse Osmosis based water purifier ... of RO system Conforming ...
As per BOQ
As per BOQ
Mini Water Pump Cooler, Grass set for Desert Cooler, Heat Tank Assembly water Dispenser, Gear Box washing Machine, Candle RO 100 LPH, Refrigerator gas filling, Gas Cane R22 1000 gn fo Split AC, Wiring of Splilt AC, Gas Cane R410, Capacitor for Desert Cooler, Display LED LLOYD Model 50US850C, Display LED Redmi Model RA5DCBF1901BXNXX01017
2200043016 CONVENTIONAL HEAVY DUTY WET GRINDER, 2200009674 ELECTRIC FOOD WARMER, 2200043015 ELECTRIC 4 COIL STOVE RANGE, 2200043017 FLOUR DOUGH KNEADER, 2200043018 SUPPLY INSTALLATION AND COMMISSIONING OF INDUSTRIAL DISHWASHER, 2200043019 ELECTRIC ... 2200001656 WATER DISPENSER FLOOR ...
HANDWASH STATION L MS FRAME CAPACITY 100LIT WATER TANK RECTANGULAR 1 BASIN SS OPERATION HAND FREE, DUSTBIN 120 LITER, SOLAR PUMP WITH CONTROLLER, 50LIT CAPACITY RO WITH WATER COOLER 60 80, GLUCOMITER, MANUAL SPECNOMANOMETER, INDUCTION, WINDOW CURTAINS, DOOR CURTAINS, SMALL DUSTBIN, BIG WALL CLOCK, WOODEN RACK 4.5X7 FEET
Motor kit for desert cooler, Water pump for desert cooler, Grass set for desert cooler, Heat tank assembly for water dispenser, Copper coil for water motor, Gear box for washing machine, Membrane for RO, Indoor motor for AC 2 ton, Gas cane R22 1000 gm for AC, Definite purpose contactor 1 pole for AC, Reciprocating Compressor for AC, Copper pipe for AC, Gas cane R410, Gas cane R32, Capacitor for desert cooler
Cotton roll 500 gram, Insuline Syringe 1ml, x ray film 8 X 10, Nasal cannula, Gauze Than, E T Tube 2.5-4, Vicryl size 1, 4, 3, High PMO Line, BP Blade Size 10, Catgut Size 1, PNS Needle 22no, Ethilon, B T Set, Office Table, Revolving chair, AC, ... Cooler, Water Dispenser , ...
Madular Wooden Wardrobe, Squadro 4 door wardrobe wooden, Wooden Wardrobe, Wooden Dressing table with Drawers, Wooden double bed without storage, Side table plywood, Sofa sets if2183 6 seater, Wallpaper, Modular Kichen (customiszed), Wooden Almirah, ... board, Water Cooler 150
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2), Household Refrigerating Appliances as per IS 17550 (Q2) MSE Exemption for Years Of Experience Yes | ... Drinking Water Coolers (V3) ...
Facility Management Service- Manpower based (Version 2) - Residential; O&M of Electrical Work; Highly-Skilled, Facility Management Service- Manpower based (Version 2) - Residential; O&M of Electrical Work; Skilled, Facility Management Service- ... - Water Cooler BlueStar; ...