Loading…
Loading…
2,132 live1,261 closing this weekmost from Rural Development and Panchayat Raj Department and Directorate of Local Bodies UP
2,132 results • Best match
PROVIDING THE WATER SUPPLY PIPE LINE FOR TNUHDB APARTMENT FROM ERASAKKANAYAKKANUR ROAD BRIDGE TO KARICHIPATTY GROUND LEVEL SUMP AT ALAGAPURI PANCHAYAT CHINNAMANUR UNION VILLAGE PANCHAYAT GENERAL FUND 2026-2027
REPAIRS/ REPLACEMENT OF OLD VINTAGE GI/CI/DI PIPE LINE OF WATER SUPPLY DISTRIBUTION NETWORK OF VARIOUS SIZES AND CONNECTED ITEMS SECT I UNDER THE AOR OF GE DEOLALI
Supplying erecting testing & Commissioning of Submersible Motar Pump at Venkataswamy Layout 10Th Cross near, Thomas Layout and Providing pipe line at Vinayaka layout in Doddanamgamangala Konappan agrahara TMC Limit
SICT of 04 Nos 150 Ltr Capacity Water cooler 2 KVA Steplizer Construction of Water Coolar Cage Pipe Line Connection and Cabling work at N MY Agra Grain Mandi
Others ME1202 CWSS to Sabarimala and DEPOSIT ME 1202 CWSS to Sabarimala Pampa Extension of pipe line from Helipad to Police Barrack at Nilackal Base Camp General Civil Work
State Plan-2026 -2027 UWSS to Mannarkkad Municipality and adjoining panchayath -Pipe Line Extension -from 1st Mile to Hill view Nagar In Mannarkkad Municipality Reach-1- General Civil Work
Providing & fixing for new borewell 1.5 HP submersible motor pump, control panel board and pipe line work at 33/11 Kv S/s Birkoni under (O&M) Dn. Mahasamund.
Replacement of fire hydrant pipeline in compound area at SEBI Bhavan II, Mumbai
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affected Saguna, Boaliaand adjoining mouzas at Santipur Block for the period of 361Days under NADIPHED
Dismantling, Fabrication and erection of Structurals, Pipelines and valves in pulper building, Main building in DIP at Pulp Mill Mechanical in TNPL Unit I
Electrification work in connection with MMR-IGP: Coach watering pipelines (in make shift arrangement) and other allied facilities at Devlali, Nashik, Kherwadi, Kasbesukene, Odha.
A R M O LWSS Shimla Town from River Giri SH Restoration of leakage of Raw water stage of Twin Rising Main of 300 mm dia D I pipe and MSERW pipe alongwith C I fittings by cutting welding jointing near Raw water Comman header Sump well old
Annual Rate Contract for Laying of 3LPE Steel Pipeline in Segment-3 - Gurugram and Rewari
Annual Rate Contract for Laying of 3LPE Steel Pipeline in Segment-4 - Karnal and Kaithal
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and IEP of Jot Gopal Piped Water Supply Scheme at Englishbazar Block under Malda Division, PHE Dte. in the District of Malda. (Period from 01/10/2026
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and IEP of Mahammadpur Piped Water Supply Scheme at Old Malda Block under Malda Division, PHE Dte. in the District of Malda. (Period from 01/10/2026
Laying of Rising main in between Tube Well -2 (at OHR site) and Distribution Line and FHTC AND PIPE LINE AT JENARAR PARA under BHATAR Z-I PWSS in BHATAR Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. (SM/08033)
R/R damages to GWSS Bargal for C/O RCC intake and providing, laying and jointing of GI pipeline to village Badu in Badu Phase and providing, laying and jointing of distribution pipeline from storage tank Bargal to vill Chodli in Bargoh Phase)
Vellore DistrictProviding New Borewell with 2HP Motor and Specials with Extension pipe line at Puliyamarathur kollaimedu in Peenjamandai PanchayatSFC (DP) 2026-27Anaicut Block Package No 02
Relocation of existing MB Pipeline alignment with new pipeline including valves due to construction of 100mts Green Field Radial Road from ORR interchange at Raviryal to RRR at Amangal
Nagar Panchayat Kheshtrantargat Mo Sadarganj Pashchimi Shilpkar Basti isthit Pump No-04 ka Rebore Pipe Line Vistar Pump House and Opretor Room ka Nirman Sluice Valve and any Vividh Karya.
PROV AND INSTALLING 1 NO DEEP BOREWELL PF CI FITTING NEW PUMPING MACHINARY PROV FIXING LAYING JOINTING GI PIPE LINE IN VILLAGE HARA BLOCK DHAR KALAN DISTT PATHANKOT UNDER DMF
TTPS MechII AHP Replacement of wornout BAH ash slurry pipe line supports handrails and painting from UnitI II III BAH outlet slurry trenches to stage I II Ash slurry sump
MOH. DUMDUMA WARD NO. 10 ME RIYAZ AHAMAD KE MAKAN SE ASHOK PAL KE MAKAN TAK VAYA PRAMOD VISHWAKARMA KE MAKAN TAK PAYJAL PIPE LINE VISTAR AVAM TAT SAMBANDHI KARYA
Laying of 110 mm HDPE Pipe line Near aakib Jabbar House to Dr Javed House and Shadan House to Main Road At Mohalla-Tarai ,Ward no-11 Length 232 Mt
Rate contract of providing lying jointing and testing HDPE/DI pipe line including defect liability period of one year at Division Bayana and Weir in Urban/Rural area District Bharatpur.
Repair of Pump Chamber Providing fixing Jointing Testing New Pipe Line 90mm od 6 kg cm2 and other work in Water supply Scheme Saila Khurd Block Garhshankar under 15th FC
Supply & Application of Epoxy painting in Mill Outer Body and Miscellaneous items (Pipe line and interconnection joints, support structure, ladders, railing, etc.) Of U#2 of 2X500 MW, ABVTPS, Marwa.
O and M Water Supply Schemes Annual Maintenance of distribution system in RWSS to Nedumpuram and Peringara Grama Panchayaths For the year 2026 27 Pipe Line Work General Civil Work
Dismantling, Fabrication and Erection of corroded structurals, equipments and Repairing of overhead pipe line in Clo2 plant, VAM plant and other areas at Pulp Mill Mechanical in TNPL Unit-1
ward no. 2 E ward Ghodage mala antrgat harshvardhan ghodake te anand vasagade ghar bhoiraj colony mahalaxumi nagar swaymbhu bekars te manish park yethe pinyche panychi pipe line takane babat
Replacing of damaged pipeline of permanent shelter at Harminder Bay, Little Andaman
ward no 7 mo wali nagar me naveen pipeline yistar ka karya
laying underground pipeline for Watercourse of outlet RD 43270/R Samrala Disty
NAGAR PANCHAYAT DAURALA KAI WARD NO 06, 12 MAI PIPELINE SAMBANDHIT KARYA.
Providing New Pipeline from Thangaraj House to Dhanapal House in Kottapalayam Panchayat.
Providing New Pipeline from Ramesh House to Hospital Road in Kottapalayam Panchayat.
Providing New Pipeline from Sellaiya House to Palani House in Kottapalayam Panchayat.
Providing New Borewell, Pumpset and Pipeline Arrangement at Sakkinaickenpatty H/o Periyakottai
Extension of khorsam saraswati pipeline at Madhupavdi checkdam. (Ta-siddhpur, Dist-patan)
PROVIDING NEW BORE WELL AND PIPELINE ARRANGEMENTS AT NAAGARVAAZHAI IN G.KALLUPATTI PANCHAYAT
Extension of Pipeline near OHT Tank at Perumparai H/O Poondurai Semur
Pipeline work in Ward No. 03, Maulviganj of Nagar Panchayat Sarai Akil.
Laying of Fuel Pipeline I.R.O Reconstruction of N1-N3 Jetty at Visakhapatnam
LAYING UNDERGROUND PIPELINE AT OUTLET RD 14500-L-R OF HARIHAR DISTY
modification of inlet and outlet pipeline and online test kit lcm 20
Providing Pump and Pipeline for EE(Store) office at Area store Jagdalpur
Work on drinking water arrangements and pipeline extension at the Chhath Ghat of Tulsiya Talab Ward No 08
OandMDistsystemand Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSSfor arsenic affected Tarapur, Paschim Noapara, Radhakantapur, ParniamatpurKalaighata adjoining mouzas at RanaghatI Block for the period of 361 Days underNADI