Loading…
Loading…
9 live8 closing this weekmost from Municipal Corporation and Chandigarh Administration
9 results • Best match
Replacement of old or Damaged 4inch id water supply pipe line near H No 801 Ramdarbar alongwith making scour arrangement at Indl Area Ph II Chd under the jurisdiction of SDE MCPH Sub Divn. 10 Chd Ch To Revenue Head
Replacement of blocked sewer line by way of proving and fixing of 10 inch i/d SW pipe line, Construction of manholes and other allied works near Kheda Temple, Hallomajra, Chd under the jurisdiction of SDE MCPH Sub Divn. No. 12, Chandigarh
Providing and laying of DI WS pipe line from booster to three story houses lane H No 3001 to 3016 Sec 31D Chd to overcome low water pressure problem and other allied works at Sec 31 Chd Capital Head Augmentation of WS in city Chd
P/L of 700mm (28inch) i/d, 600mm (24inch) i/d 450mm (18inch) i/d RCC NP-2 pipe line for smooth functioning of SWD system at various Location in S/41 (AandB), Chandigarh (Repair/Restoration of Road Cut made by MCPH Sub Div No. 13 Chandigarh.
10 inch HDPE addl pipe line on existing RCC pillars in Sukhna choe at Kishangarh in order to cater the overflow of sewer in choe due to blockage of sewer line along with const of machine hole incl other allied works under the SDE MCPH S/Div No.20 Chd
Providing and laying of 4 inch id and 6 inch id DI Water Supply pipe line near Slaughter House and from Plot No 136 140/1 to Plot No 136140/99 to overcome the low pressure problem in distribution pocket of Ind Area Ph I Chd Ch. To Capital Head
RESTORATION OF ROAD CUT RELATED TO ROAD CUT PERMISSION FOR PROVIDING AND LAYING NEW 250MM AND 300MM RCC NP3 SEWER PIPELINE FOR CONNECTION OF NEWLY CONSTRUCTED BRO HAD BUILDING TO MUNICIPAL LINE AT VILLAGE BEHLANA, CHANDIGARH
Special Repair which includes Providing and Laying of 6inch i/d, 8inch i/d PVC Pipeline and construction of Road Gullies and Manholes to dispose of Rain Water and Sewer in existing Manholes with all other related items in Govt. Model High School, Hal
RESTORATION OF ROAD CUT PROVIDING AND LAYING OF 12 INCH I/D AND 18 INCH I/D RCC NP-2, STORM WATER DRAIN PIPELINE ON BOTH SIDE OF THE ROAD FROM HALLOMAJRA LIGHT POINT TO RAIPUR KHURD LIGGHT POINT INCLUDING CONSTRUCTION OF MANHOLE, ROAD GULLIES