Loading…
Loading…
13,971 results • Best match
1 no.T/w,PM- 20 BHP, Const.of PC, Rising main- 100mtr. BW- 40 mtr.
Shamlo Kalan Installation of Shallow Tubewell Laying of Rising Main Pump Chamber Boundary Wall
Construction of Pump Chamber , Boundary Wall, Rising Main and all other works contingent thereto.
1 No. TW, Construction of PC and BW, Rising Main 40 Mtr. 150mm dia.
Estimate for Updating, Repair of Existing Structures, Construction of Sump Well and Rising Main.
1 No. TW (280 Mtr.), Rising Main- 40 Mtr., Const. of PC and BW
1 No. TW, Construction of Pump Chamber and Boundary wall, Rising Main- 20 Mtr.
Drilling of 1No. tubewell (250m Depth), Pumping Machinery, Rising Main 150mm DI Pipe- 40m
Laying of water supply pipeline prov FHTC in village Dhand District Fatehabad and all other works contingent thereto
MANDKOL-Estimate for improvement of water supply scheme by laying of distribution pipeline with installation of 1 no. additional t/well and provide FHTC in village Mandkol ,block Prithla(District Palwal) under JJM
MANDKOL-Estimate for improvement of water supply scheme by laying of distribution pipeline with installation of 1 no. additional t/well and provide FHTC in village Mandkol ,block Prithla(District Palwal) under JJM
KHAJURKA - Estimate for improvement of water supply scheme by laying of distribution pipeline with installation of 1 no. additional t/well and provide FHTC in village KHAJURKA ,block Prithla(District Palwal) under JJM
Panhera Kalan - Providing Functional Household Taps Connections (FHTC) and laying of distribution pipeline in Village Panchayat Panhera Kalan, Block-Ballabgarh, Tehsil- Ballabgarh District Faridabad. Under JJMLaying of 100mm i/d DI water supply
KHAJURKA - Estimate for improvement of water supply scheme by laying of distribution pipeline with installation of 1 no. additional t/well and provide FHTC in village KHAJURKA ,block Prithla(District Palwal) under JJM
Connecting of 9 No. New Tubewell drilled at various villages to distribution pipeline at village Hassanpur, Khori Khurd, Bharangpur, Nainangla, Nizampur, Rathiwas, Chilawli, Bhango, Dingerheri Bpl Colony and all other works contingent thereto.
DHANI GANSORA ( BIWAN) - Rough Cost Estimate For Providing Water Facility to The 75 nos Households of Dhani Gansora Village Biwan Block FP Jhirka Dist. Nuh by laying of distribution pipeline and proving FHTCs
Laying RCC NP2 pipe line to fill up Pundrak Tirth, Pundri with Fresh water from Pundri Minor at RD. 48500 and Construction of Pump House at Pundrak Tirth for Disposal of polluted water from pond.
Custom Bid for Services - Hiring of Semi Skilled Technical Man Power for Round the Clock Monitoring in SV Locations of PJPL and DPPL Gas Pipelines for Emergency Handling Safety and Security of the Installation and Other Operational Requirements Group.. Similar Category Manpower Outsourcing Services - Minimum wage Manpower Outsourcing Services - Minimum wage
Manduri Estimate for laying of pipeline and providing of FHTC in village Manduri Falling under IBS Mandkola, Block Hathin Distt. Palwal Installation of 1 No. tubewell and all other works contingent thereto
Gohana Town Rough Cost estimate for laying of balance internal disty Pipeline 100mm and 150mm DI pipeline in Gohana Town Construction of Boundary wall at Boosting Station in Gohana Distt. Sonipat
Laying additional HDPE pipeline for filing Dhani Bisna Wali pond extension from already Laid HDPE pipeline of Lalera pond Nayan including digging new pond Dhani Bisna Wali (Under Atal Bhujal Yojana)
Kanuka - Detailed estimate for providing and installation 01 no tubewell and connecting pipeline against failed tubewell. Laying, jointing, commissioning 100mm id DI pipeline from tubewell to existing distribution in village Kanuka.
Providing and laying of water supply pipeline and sewerage pipeline from Shiv Mandir to SPR and UGT for drinking water in Village Ghasola, ward 15 div 1B under MCG.(Re-Call)
Repair of Inlet channel, 1 No. S S Tank, 2 No. S S Well, Pump Chamber, HLT, 2 Nos. CWT, 2 no. F. beds S.V. houdies B Wall, Const. of RCC Clear water tank, , pump chamber, b.wall, laying of pipe Rising main line FHTC, supplying and erection etc.
Laying of DI pressurized pipeline for connecting ponds in village Madola to Mahendergarh Disty at PH MD 1 including constructing a pump house, sump well, installation of pumping machinery, other allied works, and running and maintenance for a period
Laying of DI pressurized pipeline for connecting ponds in village Duloth to Mahendergarh Disty at PH MD5 including constructing a pump house, sump well, installation of pumping machinery, other allied works, and running and maintenance for a period o
Laying of DI pressurized pipeline for connecting ponds in village Nimbi to Mahendergarh Disty at PH MD3 including constructing a pump house, sump well, installation of pumping machinery, other allied works, and running and maintenance for a period of
Ludas dnit for replacement of AC PVC pipe line Laying of 150 MM DI pipeline from B Stn Chandan Nagar to Gagandeep Colony Laying of 150 MM DI pipeline from B Stn Chandan Nagar
Construction of 1 No. RCC Filter Bed, 2 No. RCC High Level Tank, Head Works Pipe Line, Construction of Boosting Station, i.e. 1 No. Clear Water Tank, Pump Chamber, RCC Suction Well, Boundary Wall, Headworks Pipeline, Distribution Pipe Line, FHT Conne
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap conn.
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 2 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap conn.
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 2 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 2 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 2 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap conn
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec