Loading…
Loading…
13,971 results • Best match
Const. of 3 No. RCC Filter Bed 1 No. RCC CWT Repair of structures at WW laying of pipe line at WW and distribution system with FHTC Prov. and Fixing Pumping Machinery Electrical Panel Board FHTC and all other works contingent there to
Repair of 2 Nos. S/S tank, Repair of filter Bed, Repair and Raising of Boundary wall, Construction of Sluice Valve Houdies, Repair and new construction of inlet Channel, Constcructoin of RCC Clear water tank, Laying of pipe line in remaining balance
Baholi Assan Kalan Rair Kalan Bal Jattan and Sithana Rough cost estimate for providng and installing 2 No Tubewells at village Baholi Bal Jattan and laying of pipe line at village Baholi Assan Kalan Rair Kalan Bal Jattan and Sithana in Dis
Dhakla - Estimate for strengthening of Distribution DI pipeline i.e. 100mm id at village Dhakla Tehsil and Distt. Jhajjar, constitiency Badli Block Salhawas, laying of 100mm id DI pipeline distribution system village Dhakla.
Improvement to Water Supply Arrangements including Replacement of Old Dilapidated Water Supply Pipelines, water Storage Tanks and Other Allied Works in Railway Colonies of Rajpura, Khanna and Doraha stations.
Replacement and Rotation of 400 NB MS ERW Ash slurry Disposal pipelines inside Raw water area, Ash Dyke and inside RGTPP Plant premises at AHP, RGTPP, HPGCL, Khedar, Hisar .
CA NO. GE(P)AF/GUR-68/2022-23 SPECIAL REPAIR TO WATER SUPPLY PIPELINES AND WIDENING OF ROAD AT AF STN PALAM UNDER GE (AF) GURGAON NO 1
Installation Of Pipeline 152700 R/ Fatehabad Distributors At Village Bhirdana, Block Fatehabad, District Fatehabad (Re -Tender)
Mangali Aklan, HisarI, Laying of PVC pipeline 6 Kg pressure from Jasma Colony to Drain (VANGY)
Laying of DI Rising Main Pipe 8000 Mtrs., Const. of 1 No. RCC HLT , Const. of 1 No. RCC Clear water tank, Head Works Pipeline, Const. of 1 No. RCC Sump Well, Const. of 1 No. Pump Chamber of
Laying of 100 mm id DI pipe line, construction of sluice valve haudi, providing GI lowering pipe, submersible cable, submersible motor in various colonies in Jagadhri Town complete in all respect and all other works contingent thereto.
Laying of balance distribution pipe line and replacement of existing AC damaged pipe line 100 mm 2850 Mtr.
Sahazadpur, Replacement of AC Pipe Line to D.I Pipe Line, Block Chhachhrauli, Constituency Yamuna Nagar, District Yamuna Nagar.
Hartan village, Replacement of existing A.C/P.V.C pipe line to D.I pipe line, Block Radaur District Yamuna Nagar.
providing and fixing of DI special for the connection for new laid pipe line to existing pipe line
CONNECTING PIPE LINE CONSTRUCTION OF PUMP CHAMBER DOZER PUMP CONSTRUCTION OF BOUNDARY WALL LAYING OF DISTRIBUTION PIPE LINE
Masana Ranghran village, Replacement of existing A.C pipe line to D.I pipe line, Block Radaur District Yamuna Nagar.
Laying of balance distribution pipe line, replacement of existing AC damaged pipe line and repair of existing Connections.
Nagal, Replacement of existing A.C pipe line to D.I pipe line, Block Radaur, Constituency Radaur, District Yamuna Nagar.
Sadhura, Replacement of existing A.C pipe line to D.I pipe line, Block Radaur, Constituency Radaur, District Yamuna Nagar.
Tigri village, Replacement of existing A.C/P.V.C pipe line to D.I pipe line, Block Jagadhri District Yamuna Nagar.
Gadholi, Replacement of existing PVC pipe line to D.I pipe line, Block Mustafabad, Constituency Sadhaura, District Yamuna Nagar.
Construction of One No. Panel Room, Making Connection with tubewell, laying of 100mm dia DI Water Supply pipeline at village Saharni and all other contingent thereto
Tharwa Majra Providing Functional Household Tap Connection under Jal Jeevan Mission. Laying of D.I Pipe line in balance streets and providing Functional Household Tap Connection in village Tharwa Majra and all other works contingent thereto
Construction of 4 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber,1 No. UGT, providing and fixing of Functional water
Const. 1 No. RCC S and S tank, 2 Nos. RCC F.Bed, 1 No. RCC CWT, 1 No. RCC Suction well for Clear Water and Raw Water, 1 No. PC, B.Wall, pumping machinery, Const. Road and path, laying of DI pipe line, DI Rising main, FHTC and Restoration of Water C
laying of D.I. pipe line of
LAYING OF D.I. PIPE LINE OF
LAYING OF D.I. PIPE LINE OF
LAYING OF D.I. PIPE LINE OF
Laying of Water supply pipe line
LAYING OF D.I. PIPE LINE OF
Laying of D.I. Pipe line of
Replacement of AC/ PVC pipe line
NP 3 (450MM DIA PIPE LINE)
Replacement of water supply pipe line
PROVIDING AND fIXING DI pipe line.
Laying of DI Pipe Line of
Laying of balance distribution pipe line
Laying of balance distribution pipe line .
Laying of balance distribution pipe line
LAYING OF D.I. PIPE LINE OF
RENOVATION,UPGRADATION AND DISTRIBUTION PIPE LINE
Replacement of AC/PVC pipe line
Connecting 6 id DI Pipe line
laying of balance distribution pipe line
LAYING/ REPLACEMENT OF DI PIPE LINE
Laying of balance distribution pipe line .
Distribution Pipe Line and FHT Connection
LAYING OF D.I. PIPE LINE OF