Loading…
Loading…
10,704 results • Best match
Annual Parallel Rate Contract for Work to P/L/J/ Testing and Commissioning of DI and HDPE Pipe Line including defect liability period of one year at various water supply schemes in urban/rural area in the Jurisdiction of Division Hindaun City
Maintenance of distribution transfer mains rising mains pipe line, valve operation for water distribution in Jaisinghpura Khor, Eidgah, Vanvihar Delhi bypass under City Sub Division-VII North, Jaipur
Providing laying jointing testing and commissioning of various sizes Distribution Pipe Line in village village Chechat GP Chechat Block Khairabad Distt. Kota
Parallel Rate Contract of Providing, Laying, jointing, testing and Commissioning of Internal distribution network and providing Functional Household Tap water connection from already laid/ New distribution pipe line to property line, including all ma
Provding Laying AND Jointing of UPVC pipe line Near SP 235 236 industrial area Growth centre II Aburoad
Provision for 100mm DI K-7 pipe line Ranjeet Nagar to M.E.S. IB UWSS Bharatpur
Providing, laying and jointing of rising main pipeline for Commissioning of Tube Well at Village Jadan, Block-Marwar Junction
CONSTRUCTION OF RCC OPEN WELL PIPE LINE PUMP MACHINERY AT JJY SONIYANA BLOCK RAILMAGRA DISTRICT RAJSAMAND UNDER MNP BUDGET HEAD WITH ONE YEAR DEFECT LIABILITY PERIOD
Work of providing drinking water supply from clear water rising main of Hindoli Nainwa Water supply project to Bundi Medical College upto inlet point of medical college premises at Talabgaon. District Bundi.
Restoration and Renewal of Roads of Pawan puri ( S- 2C), Rising main Loha mandi ( P-1) and Macheda Hanuman mandir ( S-1 D) Road cut By PHED in Zone 6 JDA Jaipur
Execution Testing Commissioning of Transmission Main, Rising Main, ESR, CDS , VDS under JJM For 365 Villages of Bundi Distt. Fed From WTP Kapren Under Nonera water Supply Project Kota -Bundi PACKAGE 4
Annual Parallel Rate Contract for Work to P/L/J/T and Commissioning of DI and HDPE Pipe Line including defect liability period of one year at various water supply schemes in urban/rural area in the Jurisdiction of Project Div. Karauli HQ Todabhim
as per BoQ
Work of repairing of leakage for various size of pipe line at RWSS Nimeda, Ladana and Lasadiya under juridiction of Sub Dn. Phagi
(83) Work of Providing, Laying, Jointing and Commissioning of Rising Main Pipe Line from RWR to Existing System under UWSS Sojat City of Sub. Dn. Sojat City
Annual Rate Contract for Work to Providing, Laying, Jointing, Testing and Commissioning of DI and HDPE Pipe Line including defect liability period of one year at various WSS in urban and rural area in the Jurisdiction of Div Sawai Madhopur
pipeline bichai karya rajpura
PIPELINE WORK RATE CONTRACT
PIPELINE CONSTRUCTION WORK BHABHANA
SINGLE PHASE TUBEWELL WITH ELE CONNECTION OR PIPE LINE GRAM JHALARA DHANI RAJPOOTO KI GP DAYAL KI NANGAL
Construction and Commissioning of 200 mm diameter Tubewell with pipe line at RWSS Dera P.S. Reni (SPR Basis)
ANNUAL RATE CONTRACT FOR REMOVAL OF LEAKGES PIPE LINE JEN SECTION BAGRA DISTRICT SUB DN JALORE DIVISION JALORE
PIPE LINE LAKHONI MEGHWALO KI DHANI NALKUP TO TIKU RAM MEGHWAL KI DHANI TAK GP NIMBALKOT PS ADEL
Construction of Diggi /SSF /CWR /Pipe Line etc. for Chak 7 JWM Haji Noor Mohamad Ki Dhani, Bharewala
PROVIDING LAYING JOINTING AND TESTING OF HDPE PIPE LINE UNDER SUB DN SAYLA DIVISION JALORE (ANNUAL RATE CONTRACT)
PIPE LINE WORK FROM WATER WORKS WELL TO BAVJI OF DHUNI, SURAT SINGH JI KA KHEDA UMMEDPURA SAHADA
CONSTRUCTION AND COMM. OF TW OPEN WELL PIPE LINE AND OTHER WORK AT RWSS BHANDAREJ UNDER DIVISION DAUSA
On Annual Rate Contract of Removal of Leakages in various size of pipe line under Sub division Tehandesar
Repair maintenance and operation of motor pumps tubewells and pipe line at pump houses Govindsar Beethnok Diyatra Mithdiya
Shifting of water supply pipe line for Dhamana to Kamalpura fall under construction of Sub District Hospital, Sanchore.
ANNUAL RATE CONTRACT FOR REMOVING OF LEAKAGE/CHOKING IN DIFFERENCE SIZE OF PIPE LINE UNDER SUB DN NAWALGARH
Providing, L and J of HDPE pipe line in Nehra Vas Scheme With One Year Defect Liability Period
PIPE LINE SARVJNIK TANKA KHEMA RAM UMARAM KI DHANI TO SARVJNIK TANKA JASNATH MANDIR TAK GRAM PANCHAYAT ANKHIYA
Gande pani ki nikasi hetu bhumigat pipe line karya Alwar Bahrod sadak se Sodawas gaon ki or Sodawas
Interconnection work in existing Pipe line main pump house to main bazar at Bajju under sub dn. Bajju
Rate Contract for Replacement Of Old Polluted, Damaged And Worn-Out Pipe Line Under Sub Dn. I Bikaner
On ARC Maintance of Pump House, Tube well, Pipe line and Sluice valve under City Sub Division Sujangarh
MAINTENANCE OF PIPE LINE AND LEAKAGE REPARING AT VARIOUS RWSS SCHEME UNDER JEN SECTION MADHORJAPURA SUB DN. CHAKSU
PAYEJL HETU PIPE LINE WORK MAAJISA MANDIR KE JALHOJ SE MEGHWAL KE MOHALE ME BANE HALHOJ KO JODNA
Work for Distribution pipe line Ward No 16 and other area under JEn section City, Sub Division Suratgarh.
NIT 96/22-23 - REPLACMENT OF OLD DEFECTIVE AND POLUTED PIPE LINE AT RWSS PAOTA, PRAGPURA AND RAJNOTA
Annual Rate Contract for Periodic maintenance of pipe line and pump set for RWSS Barjangsar under division Sardarshahar
Replacement / Extension of pipe line in JEN, Kabeer Nagar under CSD Kabeer Nagar under city dn I Jodhpur
99.0 PLJ of pipe line, const of civil works etc at Ward No 40-43 under UWSS Balotra
On Annual Rate Contract of Removal of Leakages in various size of pipe line under Sub Division Bidasar
Annual rate contract for removing of leakage/choking in difference size of pipe line under sub dn surajgarh
Providing, Laying, Jointing and Commissioning of HDPE Pipe Line at UWSS Padampur under 15th Financial commission Phase-I
ANNUAL RATE CONTRACT FOR REMOVING OF LEAKAGE/CHOKING IN DIFFERENCE SIZE OF PIPE LINE UNDER SUB DN CHIRAWA
Replacement of Polluted Pipe Line at UWSS Gangapur City under City Sub Division Gangapur City District Gangapur City