Loading…
Loading…
1,94,792 results • Best match
Mohalla Noor Mahel And Salabatkhel ward No 08 07 Ho Afroz mand khan to Jhanda Chauck, Israr and Ramavtar Laying of Pipe line releated work
Laying of Pipe line in Various localities of Old town and Merged villages in Siddipet Municipality under Balance amount of Kaleshwaram project funds & General funds.
Laying of Pipe line at Old Harijanawada (Providing House Service Connections Where Ever Distribution, Reservoir and Source IS Available Under SCSP Grant) in 9th ward.
Construction Cement Concrete Drain / Laying of Cement Concrete Road / Laying of Pipe line 41 in Miryalguda Municipality under 15th Finance Commission Grants /Municipal General funds
Construction of C/o Cisterns and Laying of Pipe Line at Bridge point Right Side Area in Medaram Jathara of SS Tadval (M) Bit -II
Construction Cement Concrete Drain / Laying of Cement Concrete Road / Laying of Pipe line 30 in Miryalguda Municipality under 15th Finance Commission Grants /Municipal General funds
Hiring of bore wells with 5 HP Motor and laying of pipe line and repairs of connceting wells at lakshmi puram scheme in Tiruvuru Nagarpanchayat
Laying of pipe line from D.No.19-17-1/5 to D.No.32-4-22/A at Muchimilli road in 21st ward (GF)- 2ND CALL
Drilling of Bore well and Installation of Pump Motor at Hottappanapalya Vinayakanaka badavene and Laying of Pipe Line at Indraprastha Layout in CMC Madanayakanahalli Limits
Laying of pipe line (damaged due to widening of PWD road from Lodhachua to Begunia) for PWS to BAGAL of LODHACHUA GP under RANPUR Block
Laying of pipe line/Improvement and extension of water supply W.No.2 Bagnoti Nalla Lower under WSS Chak Jaralan including testing and commissioning (Capex Budget)
Day to day diversion, shifting, laying of pipe line and other related work for dewatering of coal removal area at LKSM of Dipka Expansion Project.
Misc. shifting, laying of pipe line, suction and delivery assly fabrication of 2000 GPM as well as 1000 GPM pump at Outsourcing site, GRD Project.
LAYING OF PIPE LINE FROM ASIS MANNA HOUSE TO RABIN DINDA HOUSE AND SUNIL KAR HOUSE TO NARU GOPAL BERA HOUSE AT S M CHAK
SAGGA Laying of pipe line. Repair of various Pump chamber Boundary wall and Staff quarter in Amupur Nissing Town and all other works contingent thereto.
Laying of pipe line from Yerravaram sump at ward No. 20 to C.P. Peta Ramachandramma konda in Yelamanchili Municipality under State Development Fund 2018-19.
Hiring of Bore Wells with 5hp moter and Laying of pipe line and Construction of Connecting Wells at Lakshmi puram Schme in Tiruvuru Nagara panchyat
Laying of pipe line near Khanka Masjid in W.No. 16 in Old Ward No.16 in Bodhan Municipality under 14th FC Performance Grants 2016-17
Laying of Pipe Line from Satyapal House to Thirunagari Gopanna House in Budhawarpet at Ward No 10 in Nirmal Town Under LRS Funds 2017-18
Laying of Pipe Line from Moin House to Nerella Pramod House in Budhawarpet at Ward No 10 in Nirmal Town Under LRS Funds 2017-18
Laying of Pipe Line form Apsar Kirana Shop to Narmada House in Budhawarpet at Ward No 11 in Nirmal Town Under LRS Funds 2017-18
Laying of Pipe Line from Koppula Ravinder House to Valgote Hospital in Balajiwada at Ward No 21 in Nirmal Town Under LRS Funds 2017-18
Construction of C/o Cisterns and Laying of Pipe Line at Bridge point Right Side Area in Medaram Jathara of SS Tadvai (M) Bit-I
Laying of Pipe Line from the H/o-Suvash Das to H/o-Subal Haldar in ward no-13, under Gangarampur Municipality, Gangarampur Dakshin Dinajpur
Laying of Pipe Line from the Main Road(Cosmo Bazar) to H/o-Shyamal Sharma in ward no-13, under Gangarampur Municipality, Gangarampur Dakshin Dinajpur
Laying of Pipe Line from the to H/o-Ratan Das H/o-Bishnu Sanyashi in ward no-13, under Gangarampur Municipality, Gangarampur Dakshin Dinajpur
Road restoration at Telipara in Ukhra GP under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. against laying of pipe line
Laying of Pipe Line from the to H/o Samarita Sarkar to H/o Ashis Das in ward no 02,under Gangarampur Municipality,Gangarampur Dakshin
Laying of Pipe line form D.No. 16/520-6 to D.no. 16/517-2-2-1 at Rahamathiya Function Hall Back side in 26th division.
Laying of Pipe line form D.No. 16/520-6 to D.no. 16/517-2-2-1 at Rahamathiya Function Hall Back side in 26th division.
General Funds 2023-24 Laying of Pipe Line, UGD Line and CC Road at Bandla Bazar in Div.no.13 Under AE-8 Section (4th Call).
General Funds 2023-24 Laying of Pipe Line, UGD Line and CC Road at Bandla Bazar in Div.no.13 Under AE-8 Section (Re-Call).
Laying of pipe line and erection of 20 HP & 10 HP mono block pump sets for new sump in SGS Arts College Hostel TTD Tirupati
Laying of Pipe line form D.No. 16/520-6 to D.no. 16/517-2-2-1 at Rahamathiya Function Hall Back side in 26th division.
SC/ST Sub Plan:- Drilling New Borewell and Laying of pipe line for Water Supply in S.T. Colony Kummari Kottal 29th ward of Badvel Municipality.
Providing and Laying of Pipe Line from Sawrappa House To Parshappa House and Ramesh House To Shiv House at ward No 20 in Raichur City.
Providing and Laying of 7.5 HP electrical Motors and laying of pipe line from Gontheru Drain to field Bodhi near S.Chikkla (V) of Palakollu (M)
Construction of Pump House & Laying of Pipe Line to lift water from Gandikota Foreshore area to Mangapatnam cheruvu near Mangapatnam (v) in Muddanur,YSR District.
Construction of Pump House & Laying of Pipe Line to lift water from Gandikota Foreshore area to Mangapatnam cheruvu near Mangapatnam (v) in Muddanur,YSR District.
DNIT for Providing Functional Household Tap Connection repair of structures and laying of pipe line of village Gorchi under Jal Jeevan Mission in village Gorchi
Water Supply to R and R Colony Garmunda and Solpali Patch-II of Additional Spillway Project, Hirakud. Laying of pipe line and providing service connections
FOR CONSTRUCTION OF SHED FOR CUTTING AND DISMANTILING OF TRANSFORMER AND LAYING OF PIPE LINE WITH OIL PUMP FOR PROPER OIL HANDLING IN WORKSHOP PILIBHIT.
MARAYOOR GP 2024-25 Marayur village watertank pipe laying and allied works pipe line maintenance in puthachi vayal ward(P No. 231/25)
KIIFB-KRFB - Utility shifting Kondotty - Edavannapara road due to KRFB road work Shifting of 700 mm CI gravity Main with 700 DI pipe Parathakkad to Irippanthodi- 800 m - first phase-Pipe line Work
Annual maintenance of 1000mm dia PSC, 800mm dia CI (pumping), 800mm dia PSC and 600mm dia gravity main (Raiwada pipe line) from Narava filtration plant to TSR for the year of 2019-2020
Annual maintenance of 1000mm dia PSC, 800mm dia CI (pumping), 800mm dia PSC and 600mm dia gravity main (Raiwada pipe line) from Narava filtration plant to TSR for the year of 2020-21.
Replacement of Damaged 600mm dia RCC Gravity main from OLD SS tank and interconnection to the New SS tank with MS (SAW) Pipe line under 14th FC Grant for the year 2015-16
Replacement of Damaged 600mm dia RCC Gravity main from OLD SS tank and interconnection to the New SS tank with MS (SAW) Pipe line under 14th FC Grant for the year 2015-16
Annual maintenance of 1000mm dia PSC, 800mm dia CI (Pumping), 800mm dia PSC and 600mm dia Gravity main (Raiwada Pipe line) from Narava Filtration plant to TSR for the year of 2021-22
Shifting of existing 500mm dia DI Gravity main pipe line from Simhachalam RTC complex opposite to Existing Valve Chamber at Kummari Dhibba for Simhachalam road widening in 98th ward of Zone-VIII, GVMC