Loading…
Loading…
1,94,792 results • Best match
Construction of Pelpa pipe line drain (through RCC Pipeline) from KM 0.200 to km 1.419
DEPOSIT-Mananthavady Municipality-pipe line extension and providing water connection to chooriyattil colony-Pipeline Work
AMRUT 2.0 - Pipe line extension and Providing house hold connections in Chengannur Municipality.-Pipeline Work
AMRUT 2 0 Pipe line extension works at various places of Mudavanmugal ward Pipeline Work
DEPOSIT WORK Pipe Line Extension at Thrissur Corparation Sampoorna Kudivella Padhathy DIVISION 30 Pipeline Work
Construction of Pipeline and appurtenant works for Chhoti Ramari Pipe line extension Water Supply Scheme
DEPOSIT WORK Pipe Line Extension at Thrissur Corparation Sampoorna Kudivella Padhathy DIVISION 29 Pipeline Work
Deposit RWSS to Chengamand pipe line extension Mallisseriparambu road ward 5 Chengamand Panchayath Pipeline work
Deposit-District Panchayath-Laying75mm PVC Pipe line at various places in Aryad Panchath Pipeline Work
DEPOSIT WSS TO NEDUMBASSERY Pipe line extension in Ward 8 Cheriyavapalassery Kaithakkad area Pipeline Work
Deposit Work -Mylapra Grama Panchayath 2021-22- Pipe line Extension in Kottamala Bhagom-Pipeline Work
MLA-SDF-POOTRIKKA PANCHAYATH -2023 - 2022-23 PIPE LINE EXTENSION FOR KAKKATUPARA COLONY-Pipeline Work
LAC-ADS- Kottarakkara LAC-Pipe line extensions and allied works in Kottarakkara LAC-Pipeline Work
SHIFTING OF PIPELINE 315MM DIA HDPE PIPE LINE AT RAJEEV GRUHAKALPA IN 16TH DIVISION, JAGANNADHAPURAM.
REPAIR / MAINT OF WATER SUPPLY DISTRIBUTION PIPE LINE, RISING MAIN, CONTROL VALVES, CLEANING OF UNDER GROUND SUMP AND OTHER MISC WORKS OF WATER SUPPLY IN TECH AREA AT AF STN HALWARA
Fabrication and erection of MS structural Bridge used to cross 600 mm dia Rising main pipe line at Ochiven Pally under Panagarh Industrial Park W/s Scheme under DWSD, PHE Dte
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Baratilaboni Loagan WS scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From12 Months
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC with all related structure of Gopiballavpur WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
REPAIR / MAINT OF WATER SUPPLY DISTRIBUTION PIPE LINE, RISING MAIN, CONTROL VALVES, CLEANING OF UNDER GROUND SUMP AND OTHER MISC WORKS OF WATER SUPPLY IN DOMESTIC AREA AT AF STN HALWARA
Annual maintenance of pipe line (distribution and rising main) S.V OR SSP etc and operation of sluice valve related to the daily supply of water to the consumers of Prantik Township.
D/P/C RCC ESR of 20.00 lakh lit. capacity S.no.27, Behind K J Mehata school chavan mala and rising main pipe line in p.no.20 Nashik Road Division.(Retender)
Repair/Maint of water supply distribution pipe line rising main control valves cleaning of under ground sump and other misc works of water supply in tech area at AF station Halwara
Estimate for Operation AND Maintenance of distribution system and Rising Main pipe line including operation And maintenance of pumping machineries for Kendugari Sonarimara water supply scheme under Kendugari Gram Panchayat p1
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC with all relatedc structure of Kultikri WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC with all related structure of Tamajuri WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC with all related structure of Odalchua WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Augmentation of Rising main pipe line at DOIRAPARA, NEHARU PARK MORE, BALI GHAT, INDIRA COLONY, GUTGUT PARA, BHUTABURI under Asansol Municipal Corporation to improve the quality and quantum of drinking water.
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC with all related structure of Pitanow WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Estimate for Operation And Maintenance of distribution system and Rising Main pipe line including operation And maintenance of pumping machineries for Kendugari Sonarimara water supply scheme under Kendugari Gram Panchayat p2
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure ofBhera WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Construction of OHT 260 KL Capacity 20M Staging Rising main, Pump house, Connecting main, Distribution pipe line works and other appurtenant works of Prempur Loshgyani Water Supply Scheme of Block Haldwani.
REPAIR / MAINT OF WATER SUPPLY DISTRIBUTION PIPE LINE, RISING MAIN, CONTROL VALVES, CLEANING OF UNDER GROUND SUMP AND OTHER MISC WORKS OF WATER SUPPLY IN TECH AREA AT AF STN HALWARA
REPAIR MAINT OF WATER SUPPLY DISTRIBUTION PIPE LINE RISING MAIN CONTROL VALVE CLEANING OF O/H TANKS AND OTHER MISC WORKS OF WATER SUPPLY IN DOMESTIC AREA AT AF STATION HALWARA
REPAIR / MAINT OF WATER SUPPLY DISTRIBUTION PIPE LINE, RISING MAIN, CONTROL VALVES, CLEANING OF UNDER GROUND SUMP AND OTHER MISC WORKS OF WATER SUPPLY IN DOMESTIC AREA AT AF STN HALWARA
Estimate for Operation And Maintenance of distribution system and Rising Main pipe line including operation And maintenance of pumping machineries for Kendugari Pitanau water supply scheme under Kendugari Gram Panchayat P1
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC with all relatedc structure of Gidhni WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure ofKuldiha WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Laying Rising Main, providing FHTC, Repairing existing Pipe line, Restoration of FHTC at 4th TW site and Gap filing in distribution system at Kaijali Busty PWSS under Alipurduar Division, PHE Dte.
Construction, Testing and Commissioning of Haripur Tularam Water Supply Scheme with Rising main, Distribution Main and Distribution Pipe Line, 150 KL Capacity OHT and FHTC etc. at Haldwani Block District Nainital
Supply, Installation construction of OHT, Rising main, Pump house , Boundary wall, Recharge Pit, Distribution System, DI pipe line with for Om City Vidhya Vihar Water Supply Scheme under State Sector Programme
Estimate for Operation And Maintenance of distribution system and Rising Main pipe line including operation And maintenance of pumping machineries for Kendugari Pitanau water supply scheme under Kendugari Gram Panchayat P2
REPAIR / MAINT OF WATER SUPPLY DISTRIBUTION PIPE LINE, RISING MAIN, CONTROL VALVES, CLEANING OF UNDER GROUND SUMP AND OTHER MISC WORKS OF WATER SUPPLY IN DOMESTIC AREA AT AF STN HALWARA
Construction, Testing and Commissioning of Kishanpur Raikwal-Gangapur Water Supply Scheme with Rising main, Distribution Main and Distribution Pipe Line, FHTC, Miscellaneous and Other works etc. at Haldwani Block District Nainital
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC with all related structure of Belaberia WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
MALIKPUR- Const. of Independent Water Works, providing functional household tap connections and laying of pipeline under the Jal Jeevan Mission Programme
Laying of pipeline at marutham nagar, GG avenue and thaneer panthal street in ward no 37 of west zone, Coimbatore Corporation.
Sinking of 150mm dia Production Well with internal electrifications and commissioning including laying of pipeline near Dist. Jail Campus in Jagatsinghpur.
Bir Sunarwala Estimate for providing functional household tap connection and laying of pipeline under Jal Jeevan Mission, Tehsil and Distt. Jhajjar
Laying of pipeline and water connection from Domohani Gourangdi main road to Domohani Madrasa Institution under RCFA Division-I PHE Dte.
Laying of pipeline from Sarlakani Chowk to Bagriapada Railway crossing for Water Supply to City Station Railway under WATCO Section, Bareipali