Loading…
Loading…
1,94,810 results • Best match
TENDER FOR FIRE WATER PIPELINE FABRICATION AND ASSOCIATED WORKS FOR TK20 AND TK21 AT BPCL BHITONI DEPOT
Providing and Laying of Pit water pipeline from Bhatta Pump Jeenagora to Kamakhya Mandir under Lodna Area
Replacement of RO water pipeline nearby E123 and Sewage pipeline for AC Department to Health Centre Chamber in Housing Colony at TNPL Unit I
Providing Laying Jointing and testing, of 160 mm diameter HDPE water pipe line from Kotra Road to Govt. Quarter at Ward No. 28 Under Zone 06, Bhopal.
Work for Providing/laying/Jointing and commissioning of replacement of DI 600mm dia rising main pipe line at railway crossing at satipura Over bridge at Hanumangarh Jn. under sub dn. Hanumangarh town
Pipe line crossing by adopting trench less technology (i.e. Jack Pushing Method etc.) for the rising main of Housing Re-habilitation Project at BAPL Township, Adal in the District of Paschim Bardhaman.
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Bhangadali WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Balance work for distribution system and rising main pipe line (UPVC/HDPE) construction of different dia S/V chamber at Mankar Zone-II PWSS of Galsi-I Block under DWSD,PHE Dte
Laying and jointing of rising main and distribution pipe line system, at Village Bankheda Block Sehore Distt. Sehore including cost of all material and labour with 90 Days Trial Run Commissioning period.
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Chichira WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Balance work for distribution system and rising main pipe line (UPVC/HDPE) construction of different dia S/V chamber at Mankar Zone-I PWSS of Galsi-I Block under DWSD,PHE Dte
Construction, Testing and Commissioning of Kishanpur Podiyal Water Supply Scheme with Rising main, Distribution Main and Distribution Pipe Line, FHTC, Boundary Wall, Miscellaneous and Other works etc. at Haldwani Block District Nainital
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Lakat WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Banspahari WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Ragra WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Balibandh WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Aulia WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation and Maintenance of Rising Main (pipe line (HDPE PE-80) of Barasukjora Water Supply Scheme within (Binpur-II) Block within Jhargram Sub-Division under Jhargram Division, PHE Dte. for 12 Months.
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Kechanda WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Provision for Construction Of 200 mm dia Tubewell and P/L/J of HDPE/DI pipe line in Rising main with Defect Liability Period of One Year Under RWSS Antela Block Viratnagar
DG BHANDARA GADEGAON INDUSTRIAL AREA M and R to PWSS Bhandara Industrial Area Providing maintenance Services for raw water rising main and pure water distribution pipe line Network at Bhandara I A
Laying of rising main and Distribution pipe line of HDPE GI,,SV chambers, Standposts, Chlorination arrangement, with other ancillary works. For Retrofitting to piped water supply scheme to Bishuniapada under Balianta block
Shifting of clear water rising main pipe line under widening of East coast Railway line at 49A Railway Bridge near railway culvert, Dhenkanal under State Plan BASUDHA for the year 2023-24
Operation and Maintenance of Rising Main ( pipe line (HDPE, PE-80) of Barasukjora Water Supply Scheme within (Binpur-II) Block within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 months.
Mohalla Maswani me Novnirmit Nalkup se Mohalla Ramganj Pakka Talab me Chhaya Ice cream ke pas Main Line tak 200mm dia DI K-7 Rising Main Pipe Line avam inter connection karya.
REPAIR/MAINT OF WATER SUPPLY DISTRIBUTION PIPE LINE, RISING MAIN, CONTROL VALVES, CLEANING OF UNDER O/H TANK AND OTHER MISC WORKS OF WATER SUPPLY IN DOMESTIC AREA AT AF STN HALWARA
Improvement of water supply of Kharavelanagar with laying of 200mm dia D.I pipe line from 500mm dia rising main near Keshari hall square to Kharavelanagar UGR at Unit-IX (rdz) area, Bhubaneswar
Construction of Laying and jointing of different size of MSERW pipe line in Rising main Pump House and other appurtenant works as of BHOPALPANI WATER SUPPLY SCHEME of Block Raipur District Dehradun
Repair of Rising main water supply pipe line 500mm dia from WTP Sec 1 to Majri Sec 2 Panchkula. DI Pipe 500mm dia with CID Joint at site complete in all respect
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Sankrail WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of Tamajuri WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte.For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Jhitka WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Providing Laying and Fitting of GI pipe line Rising main and distribution from bore well construction of water collection tank and installation of 1 5 HP submersible pumpset at Tashak Gongyok Chemday
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Domsole WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Laying of 150 mm dia DI K9 Rising Main pipe line of Baharampur and its adjoining mouzas Water Supply Scheme within Bhagwanpur-II Block under Contai Sub-Division,PHE Dte .(2nd Call)
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Bahadurpur WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Pathardahara WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Banshia WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Annual Operation and maintenance of distribution and rising main pipe line including FHTC at Andharia, Baguli, Chinchurbil, Churulia, Rakhakura, Joynagar, Desher mohan, Madhabpur and Madhudanga Mouza under Churulia Water Supply Scheme under
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC with all relatedc structure F.H.T.C. of Loudaha WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Laying of different dia., CIDF, DI, UPVC, HDPE Pipeline, Trenchless Pipe laying by HDD Process, HDPE pipe line for left out household connection, Trial and run the entire PURBA KATHALBARI ZONE-4 PWSS Scheme with maintaining for 3 months after success
Laying of different dia., CIDF, DI, UPVC, HDPE Pipeline, Trenchless Pipe laying by HDD Process, HDPE pipe line for left out household connection,Trial and run the entire PURBA KATHALBARI ZONE-3 PWSS Scheme with maintaining for 3 months after successf
Construction Drilling Development of DC and DTH tube well with appurtenant works and Supply and Laying of HDPE water pipe line and SITC of 6 nos India Mark-II Hand Pump etc complete work
Providing , lowering and Jointng of various dia. Water Pipe line at prabhag no. 19 B in Tai chock ravindr nagar north -south , manten house to math house,diddi house to kaki house etc . location
1)Providing a Rising Main Pipeline At Gangadhari Tal - Nandgaon Dist - Nashik Part A and B 2)Providing a PVC Pipeline From GSR to Main Line At Gangadhari Tal - Nandgaon Dist - Nashik
Supplying Sinking of 125 mm 50 mm 270 m deep Tube Well along with Submarshible Pump with laying of Pipe line at Brajalalchak near Aditya Maity Shop
Ghirai Renovation of water supply scheme with Providing and laying of Pipe line with Providing F.H.T.C. Phase 2 Under Jal Jeevan mission in Village Ghirai Distt. Hisar
Repair / maintenance and re-routing of water pipe line, other connected works and cleaning of raw water tank, UG sump at various water supply installations under GE (Army) Suratgarh at Suratgarh Mil Stn
PROVN OF 250 X GEYSERS AND ADDN/ ALTN TO WATER PIPE LINE IN FSG BIRPUR, 10 X DESERT COOLERS 2 X DEEP FREEZER FOR MED REGT AT RATNUCHAK MIL STN UNDER GE KALUCHAK
Providing , Lowering and Laying Water Pipe Line at Pragab No.19 at Btuul Nagar,vyakatesh nagar,kamakshi nagar,usha nagar,aarti nagrar,aadam plot nkaa vasti ,bhim dayal nagar and Sourrinding area, Solapur.