Loading…
Loading…
46,569 results • Best match
CONVERSION OF WATER TRANSMISSION ARRANGEMENTS FROM EXISTING RCC PIPE LINE TO PVC PIPE LINE AT RADHABALLAVPUR DTW (HG-140) UNDER CHINSURA (A-I) DIVISION, DIST. -HOOGHLY.
Laying of 200 mm. dia D.I. Pipes for Extension of Rising Main at Pipe Road to Port Blair Line in Ward No. 21.
Construction of Tank and Pipe line near Ananda Mahata house at Dumuria plot-214
laying of damaged pipe line at box culvert additional laying of pipeline at Guabari ws scheme at Phansidewa Block under Siliguri SubDivision PHE Dte
Reconnection at BeledangaUttarpara, ChandkuriHarinadi Sahebdanga laying of pipeline and rising main at BeledangaUttarparaChandkuri, Harinadi, Sahebdanga under Harinadi GP supply of Sluice Valve with construction of chamber at HW site etc.
Installation of submersible pump with pipe line near Pindrui Desh mandir JL110
Repairing and maintenance work of the total pipe line (raising main and delivery pipe line) of different places under Suri municipality.
Construction of Plant cum Manifold Room and Bridges for LMO MGPS Pipe Line connection for set up Medical Gas Pipe Line
Repair, Op. and Mntc. of distribution system, rising main, pipeline, valves, valves chambers, stand posts, repairing of FHTC and providing new FHTC for Kanaikati Kathalberi Z-II w/s scheme, Hingalganj, under Hasnabad Sub-Divn. P.H.E. Dte. for 1
Repair, Op. and Mntc. of distribution system, rising main, pipeline, valves, valves chambers, stand posts, repairing of FHTC and providing new FHTC for Kanaikati Kathalberi Z-I w/s scheme, Hingalganj, under Hasnabad Sub-Divn. P.H.E. Dte. for 1
Installation Pipe Line from Narayan Chowdhury house to Gurupada Das and Uma Das house via Gopal Ghorai at Bhagwankhali-II
Construction of boundary wall, approach road, pump hopuse, land development, road restoration, additional laying of pipeline, rising main and protection work of pipeline for CHAK NURSIKDER PWSS to accommodate FHTC in Bishnupur-I Block under S24Pgns
Drinking water pipeline at Krishnabati pipeline
Laying of Pipe line with tank at Barharasankar Pry. School
Laying of Pipe Line Koloni Para and Pan Para.at Panchkhuri
Laying of Pipe line in different wards under Madhyamgram Municipalityl.
SUPPLYING AND LAYING OF PIPE LINE AT CHHATAPATHAR SOLAR PUMP
Annual operation and maintenance of different dia Rising Main/ collecting main of Churulia Ws Scheme. (w.e.f. 01.11.2022 to 31.10.2023)
Rising Main for Augmentation of Itapara Piped Water Supply Scheme at Baraboni Block Under RCFA - Div - I PHE Dte.
Rising Main for Augmentation of Jamgram Piped Water Supply Scheme at Baraboni Block Under RCFA - Div - I PHE Dte.
Flow control of rising main and different dia distribution system by regulating apparatus under RCFA Division-I PHE Dte.
Rising main and other allied works Augmentation of Shankarpur Water Supply Scheme under Contai Sub-Division of Tamluk Division
Flow control of rising main and different dia distribution system by regulating apparatus under RCFA Division-I PHE Dte.
Repairing and renovation of existing rising main under Jamgram-Panuria water supply scheme under RCFA Division-I PHE Dte.
Water pipeline repairing at Water pipeline repairing at Leninagrh SSK. Sansad no-XXI
8 nos. Stand Alone Water Supply System comprising of Pump House and Distribution Pipeline with Community Tank and provision of FHTC for SILDA GP ( CHAINBERA ZONE-III JOYPUR PWSS) under Binpur-II Block under Jhargram Division, PHE dte.
Supplying and Laying of distribution pipeline with different diameter D.I(K-7) Pipes,HDPE Pipes and M.S. Pipes including all D.I. and HDPE Specials,Valves, Valve chambers...of Zone III within Gobardanga Municipality, District N24 Prg ununder AMRUT2.0
Standalone W/S System comprising of Installation of IEP, Pump House and Distribution Pipeline with Community Tank and provision of FHTC for drought like situation prone areas at different location under location Id Binpur-II_3_1 under Jhargram Div
Additional work of Supplying, Laying and aligning of HDPE Distribution Pipeline and Allied works Including Functional House Hold Tap Connection (FHTC) and Re Connection at Baruipara, canel par under command area of Kanksa Zone ii B under Augmentation
Additional work of supplying ,laying and aligning of HDPE Distribution pipeline allied works including functional household tap connection (FHTC) at Pathanpara command area of Kanksa Zone (II-B) Piped W/S scheme under RCFA Division-I PHE Dte.
Standalone W/S System comprising of Installation of IEP, Pump House and Distribution Pipeline with Community Tank and provision of FHTC for drought like situation prone areas at different location under location Id Binpur-I_3_1 under Jhargram Div.
Constr. of l00 cu.m. capacity RCC Elevated Reseervoir, laying rising main, laying distribution pipeline with FHTC,2 nos. PH..........for Rangali PWSS block Kharibari under Siliguri W/S Division, PHE Dte.
LAYING OF PIPELINE AT WARD NO 13
Laying of Pipeline at Chitrapathar Sabar Para
Laying of Pipeline from Pramada Samanta house
Construction Piller DI Pipe Line PASCHIM KHAIRBARI PWSS
PIPE LINE CONNECTION AND MAINTANANCE AT SANSAD 9
Installation of submersible tank and pipe line etc
INSTALLATION OF SUBMERSIBLE PUMP SET WITH PIPE LINE
PIPE LINE CONNECTION AND MAINTANANCE AT SANSAD 1
EXTENTION OF PIPE LINE AT BISHNUPUR DANGA PARA
Installation of Pipe Line Purbapara Baladghata at Baladghata
Extension of Pipe line at Goswami para (Uttarbar)
Solar Pump and Pipe line at Majh Para
Installation Submerssible and Pipe Line at Paschim Para
Extension of Pipe Line Work at Jamboni Mouza.
INSTALLATION OF PIPE LINE AT SUSNIBARI ID 89755415
INSTALLATION OF SUBMERSIBLE WITH PIPE LINE AT BARADIHA
Sinking of submersible with pipe line at Douni
Const of Pipe line near Kali Mandir IX