Loading…
Loading…
46,578 results • Best match
INSTALLATION OF SUBMERSIBLE PUMP AND PIPE LINE WATER NEAR BATTALA
Installation of Submersible at Sabanpur Colony PS with pipe line
Installation Of Water Tank With Pipe Line At Kalapathar Village
Supply, Installation and Testing of compressed air Pipe line system
New water pipeline connection from pump room to 100 bedded covid Hospital at Haldia under Haldia Construction Sub-Division No-I, PWD in the District of Purba Medinipur during the year 2025-2026.
Supply and laying of different size of cable in place of damage cable at 400 Audutorium including Straight throught joint during water pipeline work by Civil department in the campus of NBMCH (Electrical work)
Exention of Drinking Water Pipeline including Sinking of defunct tubewellWith Submirshible PUMP AND NEW PLUMBING LINE WITH OVERHEAD WATER TANK AT KALIPADA SMRITI SIKHHA MOHIBOTIPARA SISHU ALOY, CENTRE NO 264, Kadambagachi GP,Code No59686623
Exention of Drinking Water Pipeline including Sinking of defunct tubewellWith Submirshible PUMP AND NEW PLUMBING LINE WITH OVERHEAD WATER TANK AT MOYNAGODI GHOSH PARA SISHU ALOY , CENTRE NO 205 , PASCHIM KHILKAPUR GP ,Code No59687828
REPAIR / MAINTENANCE OF PUMPS, WATER SUPPLY INSTALLATION, FILTRATION PLANT AND OTHER CONNECTED WORKS AND REPAIR / MAINTENANCE OF DIFFERENT TYPE OF WATER PIPELINE,VALVES AND ALLIED WORKS AT AF STN SALUA UNDER GE (AF) KALAIKUNDA
S. S. corrugated flexible hose pipe one side male and another side female connector size 25 mm. Length 1000 mm.., AISI:304 LE63140 (Material used in LHB coaches for pump and water pipeline connection.
Laying of pipe linefrom Kaltola to Naba Pramanik at Garh Dakshin under Kamalpur GP. under 15 th CFCG
Repairing and Maintenance of water supply rising main pipeline of different dia 800mm 700 mm 600mm 500mm 400mm, 450mm, 300mm from A Dihika Pumping Station to KSTP B Chitra More to Bortoria C Tunnel Gate More to Hirapur OHR D Triveni more to Ismile
Construction of Pump house (2nd TW site), Boundary wall (2nd site and OHR Site) and Gap filling of pipeline with DI/UPVC pipe, providing balance FHTC and rising main for (Zone-I and II) 2nd TW Site at Bandapani TG PWSS under Alipurduar Division, PHE
Additional work of laying 300 mm Dia rising main and other pipeline through 600 mm Dia MS pipe by trenchless technique under railway /NH/SH//IOCL for the OCP base PWSS of Kajora Ghanshyampur OCP of OCP Kajora PWSS under RCFA Division-I PHE Dte
Tubewell with solar pump and tank and pipe line
Tubewell with solar pump and tank and pipe line
LAYING OF PIPE OF DRINKING WATER FROM H/O RIJU AT NORTH BAZAR HARI
Extention of pipe line for drinking water purpose at Issabpur Cluster shallow taid
Laying water supply Pipe Line at Old Calcutta road in ward no.- 10
Laying Water Supply Pipe Line at Barrackpore Nagar Colony in Ward No. 15
Laying Water Supply Pipe Line at Ghosh para Road in Ward no. 24
EXTENSION OF PIPE LINE AT JAGANNATHPUR SAFIKUL PARA AAP NO 67699378 2023-24
Making Interconnection and Bypass arrangemet of Rising Main and Distribution Pipeline For Newly Constructed OHR at Barabazar OHR Site of Aug. Barabazar W/S Scheme of Purulia Sadar Sub-Division under Purulia Division, PHE Dte.
Sinking of horizontal river bed tube well Construction of Clear Water Reservoir, Pump House, Boundary Wall with ancillary works, Laying Rising Main, Distribution pipeline , Construction and commissioning of FHTC for Handulia Piped Water Supply Scheme
Laying Distribution System (Part-D) allied with Providing Functional Household Tap Connection (FHTC) at Distribution Pipeline (Part-D) and rising main at Thakurganj and Adjoining Mouzas Water Supply Scheme within Phansidewa block under SSD, PHED
Construction of 550 cu.m. capacity R.C.C. Elevated Reservoir, 20 mtrs. Staging height at the head works site, laying Rising Main, laying distribution pipeline with Functional household tap connection .....boundary wall for BAIRATISAL PWSS (Zone-II)
Conversion of WTA from Existing RCC Pipe Line to UPVC Pipe Line at Dhakchhara DTW (HG-39) Mouza-Dhakchhara, JL No-82 Plot No-430 and432, Block-Balagarh in the District of Hooghly under Balagarh (A-I) Sub-Division of Chinsurah (A-I) Division
Renovation of WTA from existing RCC pipe line to UPVC pipe line at Roypur DTW (HG-44) ,J.L..No- 12 ,plot no.-54 of Chinsurah Magra Dev. Block under Cinsurah (A-I) Sub-Division of Chinsurah (A-I) Division, Dist. -Hooghly under Core Sector Programme
Repairing of Rising main pipe line and allied works along the Rising main pipe line at western side of Beldanga C.R.G.S School , Diamond Nursing home, Beside Beldanga Rural Hospital and Panchraha More connection with FHTC work in the village Madd
Diversion of rising main of Majiara W/S Scheme due to expansion of ECL Begunia Colliery under RCFA Division-I PHE Dte.
Laying of Rising Main and other allied works from Panshuili H/W Site to Natundanga OHR under RCFA Division-I PHE Dte.
Laying of Rising Main including Jack Pushing and construction of Pipe Carring bridge With Pipe supporting Structure under Taherpur and Khano PWSS.
Operation and maintenance of different dia rising main, collecting lines and allied works under Jamgram Panuria ws scheme. w.e.f 01.11.2022 to 31.10.2023
Annual operation and maintenance of different dia Rising Main collecting main of Extn. Jamgram Panuria (Kharabar) ws scheme. w.e.f 01.11.2022 to 31.10.2023
Balance work for Laying DI Rising Main Work for Radhanagar Water Supply Scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Additional work for laying Rising Main of Augmentation of Jamuria Rural (Zone-I and Zone-II) under RCFA Division-I PHE Dte.
Emergency repairing work of 700 mm dia rising main near Neamatpur due to damaged by HPCL under RCFA Division-I PHE Dte.
Reapiring and bursting of Itapara rising main and interconnection work to Itapara OHR and allied work under RCFA Division-I PHE Dte.
Balance work for rising main , MS Manifold and allied work at Bamunara OHR of Bamunara PWSS under RCFA Division-I PHE Dte.
Additional work for old and existing rising main interconnection with distribution system at Ethora OHR site under RCFA Division-I PHE Dte.
Emergency repairing work of 450 mm dia rising main at Suryanagar under ASTA W/S scheme under RCFA Division-I PHE Dte.
Annual Operation and Maintenance of DI/CI/UPVC/HDPE Rising main network from Nachan/Bansia H/W Site to HETADOBA OHR
Instalation of Water Supply pipe line for Drinking Water Purpose from submercible near Kali Mandir at Amrataria
Extension of pipe line at Mantageria Battaki , Mouza-Mantageria, J.l. no- 351, Pl No-115
Extension of Pipe Line from Kumar Para Bus Stand towards F P School San II
CONSTRUCTION OF SOLAR SUBMERSIBLE WITH PIPE LINE AT TUBGRAM SAMSAN SANSAD SIX , Activity ID-112058584
Special Reparing of UPVC pipe line Damage existing AV pipe line by BPCL at Bidyasagarpolly and Reparing Rising main DI (K9) pipe line and Construction of stand posts and pipe line inter connection at Salboni mouza
Installation of submersible pump with soak pit pipe line at Kadamdiha .
Sinking of submersible with pipe line near HO Bibhas Bera and Laying of pipe line near Pramanik para at Jayramchak
1)WATER PIPE LINE FROM NANTU BANKURA HOUSE TO KHOKAN BANKURA VIA TAPAN GHORAI HOUSE AT GODAIVERI 2) CONSTRUCTION OF SASHAN CHULLI AT GODAIVERI 3)CONSTRUCTION OF CC ROAD AT GODAIVERI PRY. SCHOOL 4) WATER PIPE LINE FROM NIMAI MANDAL SUBMERSIBLE P