Loading…
Loading…
2,37,026 results • Best match
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes under Jal Jeevan Mission at Villages DHAMARRA Block BERASIA Distt BHOPAL based on Tubewells including installation of Elect
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages BABACHIYA Block Berasia Distt BHOPAL based on Tubewells including construction of 40 KL capacity sumpwell cum
Design, Construction and Retrofitting of Piped Water Supply Schemes under Jal Jeevan Mission at Villages - 1 AIRAN 2 BINA 3 FATA CHOTI 4 LILUMRAI BLOCK C.S.A. NAGAR, Distt. Alirajpur based on Tube wells
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes under Jal Jeevan Mission at Villages SONKATCH Block BERASIA Distt BHOPAL based on Tubewells including installation of Elect
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes under Jal Jeevan Mission at Villages SAPAUA Block BERASIA Distt BHOPAL based on Tubewells including installation of Electri
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes under Jal Jeevan Mission at Villages KHARKHEDI Block PHANDA Distt BHOPAL based on Tubewells including installation of Elect
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes under Jal Jeevan Mission at Villages BARKHEDA BONDER Block PHANDA Distt BHOPAL based on Tubewells including installation of
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes under Jal Jeevan Mission at Villages SHOBHAPUR JAHEJ Block PHANDA Distt BHOPAL based on Tubewells including installation of
Construction of Baneswarpur-I Rural Water Supply Scheme at Ruidas Para under Shyampur-I Panchayat Samiti under Shyampur-I Development Block under Incentive Grant
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI).....KURULIA (ZONE-I) water supply scheme
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI.....BONGAON S.D. HOSPITAL water supply scheme
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI.....CHHAYGHARIA (ZONE-II) water supply scheme
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI)...GHATPATILA (ZONE-I) water supply scheme
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI)......GADPUKURIA (ZONE-I) water supply scheme
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI.....KURULIA (ZONE-II) water supply scheme
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI)......GHATPATILA (ZONE-II) water supply scheme
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI).....SINDRANI (ZONE-II) water supply scheme
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI).....CHHAYGHARIA (ZONE-I) water supply scheme
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI).....CHHAYGHARIA (ZONE-III) water supply scheme
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI).....SINDRANI (ZONE-I) water supply scheme
38 Piped Water Supply Scheme At. Ambe Tarfe Taloje, Tal.Panvel Dist.Raigad (Jal Jeevan Mission)
Survey, Investigation, and Necessary Construction required for New PWSS schemes of Existing piped water supply schemes of Block HARDA Distt HARDA
RETROFITTING OF WATER SUPPLY SCHEME AT AT DURGEVADI Tal.HATKANANGALE Dist KOLHAPUR. ( JJM 2021-22)
Design, Construction and Retrofitting of Piped Water Supply Schemes under Jal Jeevan Mission at Village 1 Mankund 2 Borkhedapurviya 3 Tappasuklya Block Bagli Distt Dewas
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. DABGAON TA. MUL DIST. CHANDRAPUR
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. BORCHANDALI TA. MUL DIST. CHANDRAPUR
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. RAJOLI TA. MUL DIST. CHANDRAPUR
2ND CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. BEMBAL TA. MUL DIST. CHANDRAPUR
4th CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. BHADURNI TA. MUL DIST. CHANDRAPUR
3RD CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. YERGAON TA. MUL DIST. CHANDRAPUR
PIPELINE EXTENSION AND FUNCTIONAL HOUSE TAP CONNECTION(FHTC) WORKS AT KARHA,ALINAGAR AND SURHURPUR WATER SUPPLY SCHEME
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. FISKUTI TA. MUL DIST. CHANDRAPUR
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. JUNASURLA TA. MUL DIST. CHANDRAPUR
3RD CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. MAREGAON TA. MUL DIST. CHANDRAPUR
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. BORCHANDALI TA. MUL DIST. CHANDRAPUR
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. KELZAR TA. MUL DIST. CHANDRAPUR
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. HALDI TA. MUL DIST. CHANDRAPUR
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. CHANDAPUR TA. MUL DIST. CHANDRAPUR
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. TEKADI TA. MUL DIST. CHANDRAPUR
3rd CALL FOR BALANCE HOUSE TAP CONNECTION FOR WATER SUPPLY SCHEME AT. TOLEWAHI TA. MUL DIST. CHANDRAPUR
Operation and Maintenance of 1.10 MLD capacity Multi village Piped Water Supply Scheme for 8 Villages (40 Habitations) in Block Manawar of District Dhar comprising of Raw Water Clear Water Pumping Stations, Water Treatment Plant, Pumping Main, Cist
Construction of Piped Water Supply Stand Alone Water Supply Schemes with installation of 5000 or 2X5,000 liters Polyethylene Water Storage Tank at 5 meter high MS staging to provide drinking water through Functional Household Tap Connections in 13 N
Construction of Piped Water Supply Stand Alone Water Supply Schemes with installation of 5000 or 2X5,000 liters Polyethylene Water Storage Tank at 5 meter high MS staging to provide drinking water through Functional Household Tap Connections in 17 N
Construction of Piped Water Supply Stand Alone Water Supply Schemes with installation of 5000 or 2X5,000 liters Polyethylene Water Storage Tank at 5 meter high MS staging to provide drinking water through Functional Household Tap Connections in 14 N
Construction of Piped Water Supply Stand Alone Water Supply Schemes with installation of 5000 or 2X5,000 liters Polyethylene Water Storage Tank at 5 meter high MS staging to provide drinking water through Functional Household Tap Connections in 13 N
Construction of Piped Water Supply Stand Alone Water Supply Schemes with installation of 5000 or 2X5,000 liters Polyethylene Water Storage Tank at 5 meter high MS staging to provide drinking water through Functional Household Tap Connections in 14 N
Construction of Piped Water Supply Stand Alone Water Supply Schemes with installation of 5000 or 2X5,000 liters Polyethylene Water Storage Tank at 5 meter high MS staging to provide drinking water through Functional Household Tap Connections in 23 N
Construction of Piped Water Supply Stand Alone Water Supply Schemes with installation of 5000 or 2X5,000 liters Polyethylene Water Storage Tank at 5 meter high MS staging to provide drinking water through Functional Household Tap Connections in 12 N
Construction of Piped Water Supply Stand Alone Water Supply Schemes with installation of 5000 or 2X5,000 liters Polyethylene Water Storage Tank at 5 meter high MS staging to provide drinking water through Functional Household Tap Connections in 13 N
Construction of Piped Water Supply Stand Alone Water Supply Schemes with installation of 5000 litre or 2Nos. X 5,000 liters Polyethylene Water Storage Tank at 5 meter high MS staging with suitable clamping to provide drinking water through Functional