Pipe line Extension/ Replacement 1.000 km, Repairing work of Pump house, OHT, Boundry wall. Functional House Tap Connections (FHTC) works and other appurtenant works required with all materials, labour etc complete in Kharka village w/s
Construction of works like Pump House, R.C.C. O.H.T., Rising Main, Distribution System, Staff Quarter etc. complete in all respect including commissioning, testing, trial run, defect liability and handing over completed.
pipeline FHTC and other work
Civil Works as Pump House RCC OHT Rising Main Distribution System Staff Quarter Ground Water Recharge and other Related Works
Construction of OHT, Rising Main, Pipeline, Tubewell, Pumphouse, Staff Quarter House Connection SCADA and other releated work etc. complete
Construction of OHT Pipeline Rising Main Pumphouse Tubewell SCADA House Connection Staff Quarter Boundary Wall and other releated works etc. complete
Construction of O.H.T. P.H. S.Q. T.W. Boundary wall etc. and Supply laying and jointing distribution system and Rising main.
Construction of OHT Pipeline Rising Main House Connection Tubewell Pumphouse Staff Quarter Boundary Wall and other releated works etc.
Construction, Designing, Testing and commissioning of 01 no. Tubewell, 01 no. R.C.C. OHT 400KL/16m Staging, 01 no. Pump House, Rising main, Distribution system, Boundary wall with Gate, house Connection and Appurte
ASPERNIT
Construction of OHT Tubewell Pumphouse Rising Main Distribution System House Connection Boundary Wall and other related works
Construction of 250KL/ 18 m staging Over Head tank under Birohi Village Water Supply Scheme1
MAINTENANCE WORK IN Brahmanipur Rural water Supply Works
Survey Soil investigation Design Supply of all materials labour TandP etc required for construction erection completion testing and commissioning of water supply works such as Intake well BPT WTP RCC OHT ZPS CWR cum Pumping Station Rising
Banke Bihari Water Supply Scheme
Supply, Laying and Jointing of Pipe with specials, Rising main, Construction of Tubewell, Lowering of Pumping Plant, Construction of RCC OHT, Pump House, Staff Quarter, Boundary Wall, Making FHTC etc. complete in SINGHPUR G.P. WS Scheme
Supply, Laying and Jointing of Pipe with specials, Rising main, Construction of Tubewell, Lowering of Pumping Plant, Construction of RCC OHT, Pump House, Staff Quarter, Boundary Wall, Making FHTC etc. complete in BELWA G.P. WS Scheme
Pipe line Extension/ Replacement 0.400 km, Repairing work of Pump house, Staff Quarter, OHT,Boundery wall. Functional House Tap Connections works and other appurtenant works required with all materials, labour etc complete in Sulakhana village w/s
Pipe line Extension Replacement of 63 mm Dia Pipes-0.500 km Repairing work of Pump house OHT. Construction of Boundry wall Functional House Tap Connections (FHTC) works (344) and other appurtenant works in Vardh village w.s. Scheme
Pipe line Extension/ 1.520 km, Repairing work of Pump house, Staff Quarter, OHT, Boundery wall. Functional House Tap Connections (FHTC) works and other appurtenant works required with all materials, labour etc complete in Padri village w/s
Construction of 03 Nos Rebore works of Tubewells of size 300x300 mm dia by RC Rig Machine and other appurtenant works complete in Indirapuram Awasiya Yojna Water Supply Scheme Distt Ghaziabad under deposit programme
Laying and Jointing of Distribution system House connection for retrofitting including rebore of tubewell all required works at site as per instruction of Beerapur water supply scheme Block Shivgarh District Pratapgarh under JJM Programme
Remaining Work Of Distribution system in Sonbhadra NPP Reorganization water supply scheme under State Sector DMF Programme mainly testing commissioning gap closing and leakage rectification of laid water lines DI Pipe in Sonbhadra NPP
MAINTENANCE WORK IN VILL- RAIPUR AGOOPUR GOPALPUR WATER SUPPLY SCHEMES
Custom Bid for Services - Integration of 24 Nos ABT Meters and AGC Signals into the existing ABT Monitoring System Similar Category Domain Name System (DNS) System Integration Service to Implement IoT Sensor- Based Measurement and Monitoring of Rural Water Supply...
HOUSE CONNECTIONS Works 1362 Nos. IN NEW EXISTING WATER SUPPLY LINES with all materials Labour t p etc
MAINTENANCE WORK IN Tirkhi Trilokpur Rural Water Supply Works
Renovation of Water supply scheme priority-1 for Cis-Varuna Area, Varanasi and appurtenant works of Varanasi city including all necessary works required for commissioning the system including one year defect liability period.
Pipe line Extension/Replacement 1.5 km, Repairing work of Pump house, Staff Quarter, OHT Boundary wall. Functional House Tap Connections (FHTC) works and other appurtenant works required with all materials, labour etc complete in Anda village w/s
Pipeline Extension 63mm Dia. and Functional House Tap Connections FHTC Works 1689 Nos. In New Existing WS Lines OHT repairing painting and other mentioned work in tender with all materials labour etc. Complete in PAKARI BUZURG PARASUPUR M
Supply of all materials, labour for Construction of OHT, PH, SQ, BW, Distribution System, RM, TW with SCADA automation as per specifications in tender document complete in all respect Malihabad NP Reorganization water supply scheme
Supply of all materials, labour for Construction of OHT, PH, SQ, BW, Distribution System, RM, TW with SCADA automation as per specifications in tender document complete in all respect Banthara NP Reorganization water supply scheme
Remaining Work Of Distribution system Zone 5A in Mirzapur NPP Reorganization water supply scheme Phase II under AMRUT mainly testing commissioning gap closing and leakage rectification of laid water lines by Ms GDCL New Delhi
Supply of all materials, labour for Construction of OHT, PH, SQ, BW, Distribution System, RM, TW with SCADA automation as per specifications in tender document complete in all respect Sandila NPP Reorganization water supply scheme
Construction of R.C.C. O.H.T.- 250 KL/16 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 - 16180 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of R.C.C. O.H.T.- 175 KL/16 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -12012 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of R.C.C. O.H.T.- 75 KL/12 M and 75 KL/18M, T.W.-2 Nos., P.H.-2 Nos., S.Q., B.W. S.L.T.C. of R.M.-70 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 - 7121 mtr. including supply of all materials, labour, T and P etc. complete u
Construction of R.C.C. O.H.T.- 100 KL/14 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-35 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 - 11696 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of R.C.C. O.H.T.- 100 KL/14 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -8331 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of works like Pump House, R.C.C. O.H.T., Rising Main, Distribution System, Staff Quarter etc. complete in all respect including commissioning, testing, trial run, defect liability and handing over completed.
Construction of R.C.C. O.H.T.- 150 KL/14 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-35 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -11465 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of R.C.C. O.H.T.- 200 KL/18 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -20575 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of R.C.C. O.H.T.- 150 KL/18M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-35 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 - 12187 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of R.C.C. O.H.T.- 100 KL/14 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 - 5501 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of R.C.C. O.H.T.-175 KL/16 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 - 8191 mtr. including supply of all materials, labour, T and P etc. complete under JJM
CONSTRUCTION OF OHT, PUMP HOUSE, SQ, DIST SYSYTEM, RISING MAIN Etc.
Construction of R.C.C. O.H.T.-125 KL/12 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -8037 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of R.C.C. O.H.T.-100 KL/12 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -7310 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Survey Soil investigation Design Supply of all material labour T P required for completion Testing Commisioning of Water Suplly such RCC OHT CWR Rising Main Distribution System Pump house Boundary Wall etc
Construction of R.C.C. O.H.T.- 175 KL/16 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -14704 mtr. including supply of all materials, labour, T and P etc. complete under JJM