Loading…
Loading…
51,670 results • Best match
Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system of kanpur Rejuvenation piped water supply scheme under Amta-I Block under Howrah Division, PHE Dte
Laying of Rising Main including Specials and Valves for Deotala Piped Water Supply Scheme at Deotala Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Construction of 600 Cum. capacity R.C.C OHR (based on Departmental Design and. Drawing) with 20 mtr. staging height ..for Duttababur Abad piped water supply scheme of Canning - I Block
Supply delivery of Chlorine machine set at Malda Store for Khowaspur and other piped water supply scheme in the district of Uttar Dinajpur under Malda Mechanical Division, PHE. Dte.
Withdrawing Reinstalling of sluice valve of different dia. of Ranghat Piped Water Supply Scheme at Chanchal-II Dev. Block, under Malda Division, P.H.E. Dte. in the District of Malda.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Gangaram Tea Garden Piped water supply scheme under Phansidewa block Siliguri Sub Division, PHE Dte.
Trial Run of Uttar Harischandrapur Zone-II Piped Water Supply Scheme at Harischandrapur - I Block under Malda Division, PHE Dte. in the District of Malda. For 3 (Three) Month.
Construction approach with paver block inside the premises and land development at H/W site for Augmentation of Oodlabari(Zone-I) piped Water Supply Scheme under Jalpaiguri Division, P.H.E.Dte.
Repairing of M.S. ladder for OHR Site of Badmuluk Kismat Piped Water Supply Scheme within Balurghat Block, in the District of Dakshin Dinajpur, under Balurghat Division, P.H. Engineering Dte.
Special repairing work of distribution system, sluice valve of MOUGRAM ZONE-I Piped water Supply Scheme under Ketugram-II Block, under Katwa Sub-Division within Burdwan Division PHE Dte
Construction and installation of MANIFOLD and allied works at OHR site under Digri Piped Water Supply Scheme in Krishnagar-I Block under Nadia Arsenic Civil Division-II,P.H.E Dte.
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ISUFABAD Piped Water Supply Scheme at Burdwan - I Block under Burdwan Division, PHE Dte.
Supply and fitting fixing of scheme information board for depicting the electromechanical assets for different piped water supply scheme under Kharagpur-I Block under Midnapore Mechanical Division PHE Dte.
Rectification of repair of existing FHTC connection for GUN SANKRUL Piped Water Supply Scheme at Old Malda Dev. Block in the District of Malda under Malda Division, PHE Dte.
Operation and maintenance of Low Lift and High Lift Pumping Machinery including Sub -Station ,Chlorination system and lighting arrangement at Runakura Ghat under Chotkara Kanskuli Piped Water Supply Scheme.
Augmentation of SAKTIGARH Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC ............. internal pathway at different TW site under BARDHAMAN-II Block, District- Purba-Bardhaman.
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Krishnabati Piped Water Supply Scheme at Bahara ................. Mangalkot Block under Burdwan Division, PHE Dte.
Laying of Parallel/ Dedicated Pipeline for better Functionality at ALINAGAR Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Supply, delivery, construction, commissioning and completion of all civil works including all allied, related and enabling works for Kaktia piped water supply scheme, Block Patrasayer, Dist Bankura under JJM.
Rejuvenation of Ground water based piped water supply scheme for Kapasda Part to Accommodate FHTC under JJM under Sabang Block in Paschim Medinipur Districct under Medinipur Division PHE Dte.
Construction of 300 Cum. capacity R.C.C OHR (based on Departmental Design and Drawing) with 20 mtr. staging height ..for augmentation of Luxbagan piped water supply scheme of Gosaba Block
Providing FHTC by retrofitting of parent scheme of Daultapur Piped Water Supply Scheme under Banshihari and Harirampur Block in the District of Dakshin Dinajpur under Balurghat Division, PHE Dte.
Construction of switch rooms and Rising main at different TW site for RASULPUR Piped Water Supply Scheme under Memari - I Block, District- Purba-Bardhaman under Burdwan Division, PHE. Dte.
Construction and installation of MANIFOLD and allied works at OHR site under Barnia Piped Water Supply Scheme in Tehatta-II Block under Nadia Arsenic Civil Division-II,P.H.E Dte.
Construction of OHR (200 Cum), Laying of Distribution System, Providing Functional Household Tap Connection etc. of Ground Water based Augmentation Piped Water Supply Scheme for the KAMAKHYAPUR, Block-Gosaba
Rejuvenation of Ground water based piped water supply scheme for Sartla Part to Accommodate FHTC under JJM under Sabang Block in Paschim Medinipur Districct under Medinipur Division PHE Dte.
Laying of Rising main with necessary interconnection with T.W., OHR and Distribution System and Protection Work Including Approach Road at Head Work site for GOURIBATI Piped Water Supply Scheme
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gopikantapur Piped Water Supply Scheme at Kubajpur ..................... Jamalpur Block under Burdwan Division, PHE Dte.
Construction of pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for NARAYANPUR Piped Water Supply Scheme to accommodate FHTC in Bhangar-I Block.
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kashipur Piped Water Supply Scheme at Sripur .............. Bhatar Block under Burdwan Division, PHE Dte.
Construction of 500 Cum. capacity R.C.C OHR (based on Departmental Design and Drawing) with 20 mtr. staging height ...for Augmentation of Bijoynagar piped water supply scheme of Gosaba Block
Laying of Distribution of UPVC Pipeline of ALAL ZONE-II Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal.
Augmentation of Edrakpur Adjoining Mouzas Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Nowda Block of Murshidabad District under Murshidabad Division, PHE.Dte..
Renovation of 2nd Pump House along with Land Development work for Khadinan piped water supply scheme of Bagnan-I Block under Uluberia Sub-Division under Howrah Division PHE Dte
Providing, installation of pumping machineries with other electro-mechanical accessories for at Phulberia piped water supply scheme (OHR Site) under Bankura Mechanical Division, PHE Dte. Block Sarenga, Dist Bankura.
Repairing and Renovation of existing OHR, Blower room and allied works at HW site campus of Balurghat District Hospital Piped Water Supply Scheme, in the District of Dakshin Dinajpur.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Trihana Tea Garden Piped water supply scheme under Naxalbari block Siliguri Sub Division, PHE Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Hansqua Tea Garden Piped water supply scheme under Phansidewa block Siliguri Sub Division, PHE Dte.
Operation Maintenance of Purba Gazipur, Sankardari Piped Water Supply Scheme of Shyampur-I Block under Uluberia Sub division of Howrah Division, PHE Dte.Dte (Period for O M- 365 days).
Operation Maintenance of Katagachi Deora Piped Water Supply Scheme of Shyampur-II Block under Uluberia Sub division of Howrah Division, PHE Dte. Dte (Period for O M- 365 days).
Supply, delivery, construction, commissioning and completion of all civil works including all allied, related and enabling works for Baragaria piped water supply scheme, Block Kotulpur, Dist Bankura under JJM
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SONARUDRA Piped Water Supply Scheme at Purbasthali-I Block under Burdwan Division_ PHE Dte.
Laying of additional Distribution Pipe Line for providing balance FHTC of Kalikamora Piped Water Supply Scheme Kushmandi Block in the District of Dakshin Dinajpur under Balurghat Division, PHE Dte.
Interconnection for 2nd TW and 1st Tube well (HW site) at Bangalpur Piped Water Supply scheme in Bagnan-I Block in Uluberia Sub-Division, under Howrah Division, P.H.E. Dte
Providing Functional House Hold Connection (FHTC) for the purpose of Maslandpur Piped Water Supply Scheme of Raiganj Block in the District of Uttar Dinajpur under Raiganj Division, P.H.E. Dte.
Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system of kanpur Rejuvenation piped water supply scheme under Amta-I Block under Howrah Division, PHE Dte.
Rejuvenation of Ground water based piped water supply scheme for Narayanbar Part to Accommodate FHTC under JJM under Sabang Block in Paschim Medinipur Districct under Medinipur Division PHE Dte.
Construction of 300 cum capacity OHR (20 mtr. Staging Height) including design drawing of Pile Foundation .. for PADMAPUKURIA Piped Water Supply Scheme to accommodate FHTC in BHANGAR-I Block
Laying of Rising Main including Specials and Valves for MAHESHPUR Piped Water Supply Scheme at Englishbazar Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Installation of IEP (35 Cum/Hr), and allied works at Alipur Piped Water Supply Scheme of Balurghat Block under Balurghat Division, PHE Dte. in the District of Dakshin Dinajpur.