Loading…
Loading…
51,738 results • Best match
Supply, Delivery, construction, commissioning and completion of all Civil works including all allied, related and enabling works for Augmentation of Benda Piped Water Supply Scheme, Block- Bishnupur, Dist- Bankura under JJM under Bankura Division.
Construction of Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of UTTAR DURGAPUR MOUZA Piped Water Supply Scheme of JOYNAGAR-I Block
Construction of 500 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Chlorine Room along with Laying of Distribution System..for Augmentation of TAJPUR FATEPUR MOUZA Piped Water Supply Scheme of JOYNAGAR-I Block
Providing Functional House Hold Tap Connection Under Jal Swapna Programme for Kalikamora Zone II Piped Water Supply Scheme at Kushmundi Block in the District of Dakshin Dinajpur under Balurghat Division P.H.Engineering Dte. (Phase - II)
Construction of Boundary Wall, Pump house cum Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for MAHISHMARI MOUZA Piped Water Supply Scheme of JAYNAGAR-I Block
Construction of balance portion of boundary wall including land development at 1st Tube well site of SHURA Zone-I Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 55 Mtr.)
Supply and delivery of different dia. CIDF sluice valve for Augmentation of Dignagar, Galsi, Barabelun and Kotachandipur Piped Water Supply Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, P.H.E. Dte. _2ND CALL
Augmentation of AIRP capacity (30cum/hr) in connection with augmentation of Ground Water Based Piped Water Supply Scheme for Nabla, under Jal Jeevan Mission at Santipur Block, under Nadia Arsenic Division -I, PHE Dte.
Operation, and Guarding of Intermediate Boosting pumping station(IBS) and sub-station equipments at Upargora under Chhatna, Saltora Block Sub-Surface Water Based Piped Water Supply Scheme BRGF Phase I Block Saltora, Dist Bankura.
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Balgona Piped Water Supply Scheme at Balgona village (Balgona (P), Patna habs), Bhatar Block under Burdwan Division, PHE Dte.
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Ground Water Based Piped Water Supply Scheme for BARA BHAGIA and ADJOINING MOUJAS, Block - Potashpur I, District - Purba Medinipur under JJM Prog
Construction of Pump House (without Toilet) at 2nd Tubewell Site (5.40mx3.60m) in connection with Augmentation of Karandighi Zone-I Piped Water Supply Scheme under Raiganj Division, PHE Dte. in the district of Uttar Dinajpur.
Operation, and guarding of gaseous Chlorination system at OHR site Zone-L of Dhankura Block -Ranibandh under Khatra-Hirbandh-Ranibandh Block Surface Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte.
Operation and maintenance of distribution system including rising main and FHTC for Kashinagar Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (for 366 days)
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Ground Water Based Piped Water Supply Scheme for DEPAL and ADJOINING MOUJAS, Block Ramnagar II, District - Purba Medinipur under JJM Program un
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Ground Water Based Piped Water Supply Scheme for AGAR and ADJOINING MOUJAS PWSS, Block Shahid Matangini, District - Purba Medinipur under JJM Pr
Operation and maintenance of distribution system including rising main and FHTC for Dakshin Roypur Piped Water Supply Scheme of Pathar Pratima Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (for 365 days)
Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 2 of Augmentation of Nagartala Zone-I and II Piped water supply scheme under SMD, PHE Dte. Block Canning-II
Operation, and Guarding of pumping machineries and other accessories at CWR site of Somsar and adj. mouzas Ground Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte. Block- Indus Dist- Bankura
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Ground Water Based Piped Water Supply Scheme for PURBA RADHAPUR and ADJOINING MOUJAS, Block Bhagawanpur I, District Purba Medinipur under JJM Pro
Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Ground Water Based Piped Water Supply Scheme For Nakubar under Amta-II Block under Howrah Division, PHE Dte. (PART-D)
Retrofitting work for providing Functional Household Tap Connection FHTC from existing distributin system of Gobindapur piped water supply scheme under Jagatballavpur Block under Howrah Sadar Sub-Division of Howrah Division, PHE Dte. Part-J
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Rejuvenation of Ground Water Based Piped Water Supply Scheme for Narayanbar Part to Accommodate FHTC under Jal Sapno Mission under Sabang Block
Retrofitting work for providing Functional Household Tap Connection FHTC from existing distributin system of Gobindapur piped water supply scheme under Jagatballavpur Block under Howrah Sadar Sub-Division of Howrah Division, PHE Dte. Part-A
Annual Operation Maintenance and Emergent repair of pipe line of distribution system Rising main of JIBJALSAR Piped Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the District of Malda.
Construction of Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of MALLIKPUR (PART-III) MOUZA Piped Water Supply Scheme of BARUIPUR Block
Sinking of 02 (Two) nos. Rig bored 250mm x 150mm dia. and 360 mtr. deep Tubewell by Rotary method for CHAK PARANKATA KHALI Piped Water Supply Scheme to accommodate FHTC in MOGRAHAT-II Block
Construction of boundary wall at Pump House - 2 at Ground Water Based Piped Water Supply Scheme of Devis Abad W/S Scheme Block - Canning-I under Canning Sub-Division of Alipore Division, PHE Dte.
Operation and maintenance of distribution system including rising main and FHTC for Gobindarampur Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (for 366 days)
Operation and maintenance of distribution system including rising main and FHTC for Gangadharpur Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (for 366 days)
Operation and maintenance of distribution system including rising main and FHTC for Narayanpur Piped Water Supply Scheme under JJM of Namkhana Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (For 366 days)
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Ground Water Based Piped Water Supply Scheme for DEULI and ADJOINING MOUJAS, Block Ramnagar II, District - Purba Medinipur under JJM Program un
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for THE PROPOSED GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MANIKKUNDA TO ACCOMMODATE FHTC UNDER CHANDRAKONA - I BLOCK IN PASCHIM MIDNAPORE DIS
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Ground Water Based Piped Water Supply Scheme for PURBA NUKHA AND ITS ADJOINING MOUJAS, Block Tamluk, District - Purba Medinipur under JJM Prog
Annual Operation Maintenance Emergent repair of pipe line of distribution system Rising main of Nabagram Piped Water Supply Scheme at Chanchal I Dev. Block under Malda Division, PHE Dte. in the District of Malda.
Extension of Pipe line and Replacing of damaged A.C pipe line by different dia UPVC pipe for Dakshin Mahendrapur Piped Water Supply scheme in Harischandrapur I Block under Malda Division PHE. Dte. (Part-III)
Providing Functional House Hold Tap Connection by retrofitting of Zone-X of Gangarampur Eastern Sector under Sub-Surface Based Piped Water Supply Scheme at Gangarampur Block in the District of Dakshin Dinajpur (PHASE-I).
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Ground Water Based Piped Water Supply Scheme for DANGAR TULSI and ADJOINING MOUJAS, Block Potashpur I, District - Purba Medinipur under JJM Pro
Construction of Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of RAMNAGAR (PART-I) MOUZA Piped Water Supply Scheme of BARUIPUR Block
Jack pushing between Sanka Rukni Rly. Station in Adra-BJE Section for The surface based piped water supply scheme For the District Purulia (Northern Sector) under Raghunathpur Sub Division under Purulia Division, PHE Dte.
Operation, and guarding of gaseous Chlorination system at OHR site Zone-IIB of Hetiasole Block -Ranibandh under Khatra-Hirbandh-Ranibandh Block Surface Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte.
Supply, Delivery, construction, commissioning and completion of all Civil works including all allied, related and enabling works for Augmentation of Karisunda Piped Water Supply Scheme, Block - Indus, Dist- Bankura under JJM under Bankura Division.
Retrofitting work for providing Functional Household Tap Connection FHTC from existing distributin system of Gobindapur piped water supply scheme under Jagatballavpur Block under Howrah Sadar Sub-Division of Howrah Division, PHE Dte. Part-L
Construction of OHR (550 cum.), Laying of Distribution System, Providing FHTC etc. of Ground Water Based Augmentation Piped Water Supply Scheme for the Phul Malancha, Block Basanti under Canning Sub Division of Alipore Div.
Augmentation of Ramnachandpur Zone_I Piped water supply scheme to accommodate construction of service road , laying of design pipeline and providing FHTC (Functional Household Tap Connection) under Jal Jeevan Mission in Nawda Block of Murshidabad
Construction of 350 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Pump house cum Chlorine Room along with Laying of Distribution .. for Augmentation of BALBALIA MOUZA Piped Water Supply Scheme of BARUIPUR Block
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Ground Water Based Piped Water Supply Scheme for TAJPUR and ADJOINING MOUJAS, Block Egra II, District - Purba Medinipur under JJM Program under
Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distributin system of Gobindapur piped water supply scheme under Jagatballavpur Block under Howrah Sadar Sub-Division of Howrah Division, PHE Dte. Part-K
Day to Day Operation, efficient monitoring and Maintenance in all respect for Zone - XI and Zone XIV of Gangarampur Eastern Sector under Sub Surface Based Piped Water supply scheme under Balurghat Division, PHE Dte.
Construction of 200 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for HOGALKURIA Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block.