Loading…
Loading…
51,751 results • Best match
Geo-Technical investigation, Design (only sub-structure i.e. foundation part) and Construction of RCC Elevated OHR (Intze type) of capacity 400 cum of staging ....at Zone-I in ward no. 04, Gobardanga Municipality under Proposed Water Supply Scheme.
Supply, delivery of PCC pole, M.S materials and Electrical accessories including stringing and Sagging of LTOH line to WBSEDCL for new service connection at Pump House-2 under Karuigachhi water supply scheme, under EMSD-III,PHE Dte, Nadia.
House Service Water Connection with saddle to 1458 Nos of Premises for Water Supply Scheme at Zone-II incl 4 Years Operation and Maintenance Works after 1st. Year comprehensive Operation and Maintenance under AMRUT 2.0 within Dainhat Municipality
Providing and installation of High lift and Low Lift pumping machineries and other electromechanical accessories for Augmentation work for Barjora water supply scheme (Left out mouzas of Barjora Block under BRGF Phase I)( Zone III) under BMD,PHED
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Purba Kanthalbari water supply scheme, TW no I and II of Zone-I under Northern Mechanical Division-II, PHE D
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Augmentation of Chakchaka Water Supply Scheme TW No.-I and II of Zone-II under NMD-II,PHE.Dte,,Apd.
Providing and installation of High lift and Low Lift pumping machineries and other electromechanical accessories for Augmentation work for Barjora water supply scheme (Left out mouzas of Barjora Block under BRGF Phase I)( Zone IB) under BMD, PHED
Operation and Maintenance of distribution system (Zone-I) pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all related structure i.e. OHR of Barasukjora Water Supply Scheme within (Binpur-II) Block within Jhargram Sub-Division under Jhargram Division,
Geo-Technical investigation, Design (only sub-structure i.e. foundation part) and Construction of RCC Elevated OHR (Intze type) of capacity 400 cum of staging ....at Zone-II in ward no. 02, Gobardanga Municipality under Proposed Water Supply Scheme.
Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for HOKADAHA PRATHAM KHANDA water supply scheme, TW no I and II under JJM under NMD-II, PHE Dte. APD.
Operation and Maintenance of distribution system (Zone-II) pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all related structure i.e. OHR of Barasukjora Water Supply Scheme within (Binpur-II) Block within Jhargram Sub-Division under Jhargram Division,
Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for AUGUMENTATION of BARA PHALIMARI water supply scheme, TW no III under Jal Jeevan Mission under NMD-II, PHE Dt
Emergency provision of AC photovoltaic solar submersible pump with 2400 watt peak capacity solar photovoltaic array on MS Structure to meet up water demand during summer season at Babnabera and Biharpur under Amlajora water supply scheme under RCFA
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Chhit Bara Laukuthi water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II, PHE Dte.APD
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Augumentation of Sitalkuchi Zone-III Water Supply Scheme TW No.- I II and III under NMD-II,PHE.Dte,APD.
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Augmentation of Baneswar Water Supply Scheme TW No.- III of zone-II and III under NMD-II,PHE.Dte,APD.
House Service Water Connection with saddle to 3600 Nos of Premises for Water Supply Scheme at Zone-I incl 4 Years Operation and Maintenance Works after 1st. Year comprehensive Operation and Maintenance under AMRUT 2.0 within Memari Municipality
Operation and Maintenance of distribution system (Zone-II) pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all related structure i.e. OHR of Barasukjora Water Supply Scheme within (Binpur-II) Block within Jhargram Sub-Division under Jhargram Division,
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Augmentation of Jiranpur Water Supply Scheme Zone - I (B) TW No.-I AND II under NMD-II,PHE.Dte,Apd.
Sl. No. 17..Construction of reinforced cement concrete boundary wall and extra length to achive node length in laying distribution system and providing concrete block in rising main at KARBALA TEA GARDEN Water Supply Scheme under Jalpaiguri Division
Repair and renovation works of R.C.C. Elevated Reservoir of Capacity 400 cum for Talsa and Adj Mouzas Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdicdiction of Habra Sub-Division under Barasat Divisio
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Dinhata (P) water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II, PHE Dte. APD
CONS. OF RESERVOIR (100M3), BOUNDARY WALL (80 m), PUMPHOUSE( 1.Nos) ,TUBEWELL (2 Nos.), RISING MAIN AND LAND DEVELOPMENT FOR TORSHA (Sawa Line, Chetri Line, Bancha Line,Gopal Line, Jiten Line)220 unit CHA SUNDARAI WATER SUPPLY SCHEME
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Bhangri Pratham Khanda water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II, PHE Dte.A
House service water Connection with saddle to 1224 no of Premises at different wards including Water Meter and restoration of damages of road/pavement etc. for Water Supply Scheme at Zone 1 under AMRUT 2.0 within Baduria Municipality.
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Paschim Satali water supply scheme, TW no I, II and III under Jal Jeevan Mission under NMD-II, PHE Dte.APD
Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for BALLALGURI water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II, PHE Dte. Alipurduar.
Geo-Technical investigation, Design (only sub-structure i.e. foundation part)and Construction of RCC Elevated OHR (Intze type) of capacity 950 cum of staging ...at Zone-VI in ward no. 10, Chakdaha Municipality under Proposed Water Supply Scheme.
Additional repairing and maintenance work of RCC Elevated reservoir, Boundary Wall and other allied works at Mangalpur of 25000 gallon capacity under Augmentation of RCFA Part-II (Zone-3) Water Supply Scheme under RCFA Division-I PHE Dte.
Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for Rejuvenation of MALSAGAON water supply scheme, TW no I AND II under JJM under NMD-II, PHE Dte. APD.
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Asakbari Pratham Khanda water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II, PHE Dte
Supply delivery and carrying of chlorine gas of 900 Kg each capacity Toner with testing of Toner for Central Sector Part_I_II and Beldanga_Mahyampur Surface Water Based Water Supply Scheme under MEDB PHE Dte in the district of Murshidabad
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Jayanti Area TG II water supply scheme, TW no I and II of under Northern Mechanical Division-II, PHE Dte.AP
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Augmentation of Konachatra Water Supply Scheme TW No.-I and II of Zone-I under NMD-II,PHE.Dte,Apd.
Pipe line crossing by adopting trench less technology (e.g. Jack Pushing Method etc) in between new Bus Stand to Valuka Re Habilated Village on NH 60 under Kendra Khottamdihi Water Supply Scheme under RCFA Division-I PHE Dte.
SINKING OF 250 X 150 mm dia. X 150 Mtr. DEPTH RIG BORED TUBE WELL, BOUNDARY WALL and CONSTRUCTION OF SWITCH ROOM FOR REJUVENATION OF ROHINI WATER SUPPLY SCHEME WITH IN SANKRAIL BLOCK UNDER JHARGRAM DIVISION, P.H.E. DTE.
Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for Rejuvenation of MAIDAM water supply scheme, TW no I AND II under JJM under NMD-II, PHE Dte. APD.
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Bajejama Chilakhana Pratham khanda Water Supply Scheme TW No.- I and II under Jal Jeevan Mission NMD-II,PHE.Dte
Supply and installation of unbalanced type line voltage corrector device Pump House -I with supply and fixing of pressure gauge and repairing of illumination arrangementat Pump House -I and II of Champapukur water supply scheme under Eastern Mechanic
Supply, delivery and installation of 20 KVA servo motor operated copper wound line voltage corrector at Pump House I and II of Rampur water supply scheme under Eastern Mechanical Sub Division-I, PHE Dte. Dist- 24 Pgs(N)
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Nakarjan and its adjoining mouzas water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II
Additional works for Aligning and laying connecting main pipe of river bed tube wells, construction of manifold and other allied works at Amkula and Damalia under Amritnagar Zone-II Water Supply Scheme under RCFA Division-I PHE Dte.
Augmentation of ground water based Begunberia Water Supply Scheme by providing LDS and FHTC work and Construction of R.C.C. OHR of capacity 600 cum and staging height 20.00 mtr. within Sutahata Dev. Block of Tamluk Division, PHE Dte.
Supply and Delivery of DI Specials and different dia CI DF Sluice Valves etc. for Maintenance of Nayagram Part Sub Surface based Pipe Water Supply Scheme including interconnection at Sitalpura OHR site within Nayagram Block under Gopiballavpur Sub
Supply, delivery and installation of submersible pump moter set including other allied works at P H No. I, II, III _ IV of Chunchura water supply scheme under Eastern Mechanical Sub Division-I, PHE Dte. Dist- 24 Pgs(N)
Lowering of additional column pipes at Six (06) nos Water Supply Scheme namely Malancha (Zone-II), Chaital, Kanaikathi Kathaberia (Zone-I and II), Chaimalpur and Champapukuriya including other allied works a under Eastern Mechanical Sub Division-I, P
Replacement including extension of pipe line with FHTC to different habitations of Kurumgram village including 200 mm PVC Tube Well and restoration of roads at Kurumgram Water Supply Scheme under Nalhati Sub-Division within Birbhum Division, PHE Dte
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Lankapara in Relation With Chaa Sundori Water Supply Scheme TWNo- I,II,III,IV under NMD-II,PHE.Dte,APD.
Construction of Boundary wall allied works at 2nd Tube well site cum Head Work Site for Proposed Pipe Water Supply Scheme of Bandarbani and its Adjoining Mouzas PWSS , BlockBinpur-I, District Jhargram TYPE - B Total length 50 mtr
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Aug. of Ghokshadanga Water Supply Scheme Zone-II of TW No.- I and II under NMD-II,PHE.Dte,Alipurduar.