Loading…
Loading…
12,052 results • Best match
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Bhayna Zone- II (Capacity-19 m3/Hr., Pressure Type Ramnagar (Capacity-71m3/Hr., Pressure Type W/S Scheme under Nadia Arsenic Division I P.H.E. Dte.
Complete overhauling, cleaning and replacement of Filter media of Community Water Purification Plant (CWPP) situated at different locations of Kaliachak-III Block under Malda Division, PHE Dte.
Installation of Solar Powered Standalone Community Water Purification Plant (CWPP) for Schools at different places of Gazole Dev. Block under Malda Division, PHE Dte. (Quantity 7 Nos.)
Complete overhauling, cleaning and replacement of Filter media of Community Water Purification Plant (CWPP) situated at different locations of Kaliachak-I Block under Malda Division, PHE Dte.
Complete overhauling, cleaning and replacement of Filter media of Community Water Purification Plant (CWPP) situated at different locations of Kaliachak-II Block under Malda Division, PHE Dte.
Construction of Solar Powered Standalone Community Water Purification Plant for uncovered habitations at Block-Haroa, Panchayet- Salipur, Village- Chauhata, under Barasat Arsenic Division , PHE Dte. (SL-02)
Installation of Solar Powered Standalone Community Water Purification Plant (CWPP) for AWCs at different places of Gazole Dev. Block under Malda Division, PHE Dte. (Quantity 14 Nos.)
Installation of Dual Solar Pump and Water Purification Plant at Choturagachh at Mouza Bhagalpur Khas JL No 17 at Sonapur GP under Chopra Block Activity Code 70954961
Supply, delivery,installation of 9 (nine) nos. Standalone Community Water Purification Plant in Bongaon Block(4 nos.) and Bagdah Block (5 nos.) under North 24 Parganas District .
Installation, Commissioning and Maintenance of dual use of Solar Pump cum Water Purification Plant at Bhagon Hatkhola Dag No 388 Kh 78 Bhandar GP at Kaliyaganj PS
Installation of Solar Powered Standalone Community Water Purification Plant (CWPP) for AWCs at different places of Bamongola Dev. Block under Malda Division, PHE Dte. (Quantity 14 Nos.)
MAINTAINANCE OF WATER TREATMENT PLANTS IN VARIOUS SANSADS UNDER CHHAIGHARI GP . AAP Sl NO 64 2023 24 Activity ID 67239513 under Chhaighari GP. Block Berhampore Dist Murshidabad. Fund 15th. CFC
Supply Install.Commi. of Desalination Plant (using Reverse Osmosis Technology) of diff. capacity ........ . and allied works at Shridharkati Water Supply Scheme under Hasnabad Sub-Division,PHE Dte.P.S.-Hingalganj
Supply Install.Commi. of Desalination Plant (using Reverse Osmosis Technology) of diff. capacity ........ . and allied works at Shridharkati Water Supply Scheme under Hasnabad Sub-Division,PHE Dte.P.S.-Hingalganj
Supply and delivery coagulant and repairing of illumination arrangement and allied works at WTP of Jangipur surface Water based water supply scheme under MEDB PHE Dte in Murshidabad
CMC of the existing STP/ETP, WTP and Water Supply System (including consumables, spares etc.) for Malda Medical College and Hospital in the district of Malda (2nd Call)
Supply and actuator operated Sluice valve ,Gate and other necessary allied work at WTP and Intake of Surface based PWSS for Panagarh Industrial Park under DWSD,PHE Dte
Laying of DI pipe for clear water rising main from CWR at WTP to four OHR of the proposed water supply scheme within KRISHNANAGAR Municipality under AMRUT PROJECT
NON COMPREHENSIVE ANNUAL MAINTENANCE AND OPERATION CONTRACT OF ELECTRICAL, FIREFIGHTING and FIRE ALARM SYSTEM, BMS, STP, WTP AND SOLAR SYSTEM FOR SCIENCE RESEARCH PARK, RAJARHAT of IIT KHARAGPUR.
Supplying and laying of clear water rising main 700 mm dia (M.S) from Trikon park at Chakdah Bongaon Road to WTP.....under AMRUT 2.0 Programme within Bongaon Municipality.
Repairing, rewinding of defective pump motor set and providing external illumination near Lagoon at WTP under SWB WS Scheme, Southern Sector, Chakdaha, Dist. Nadia, under E.M.D., P.H.E. Dte.
Additional work related to rejuvenation of sludge removal system and other allied electro-mechanical works at WTP of Balupur W/S Scheme under Malda Mechanical Division, PHE Dte.
Laying of 150 mm Dia PVC pipe (Supplying, Fitting and Fixing ) From Angadpur WTP side to Ghospara, beside DCL Plant within Ward No 37 and 38 under DMC
Operation andMaintenance of 11KV substation andother electrical mechanical accessories at WTP surface Water based water supply scheme for Arsenic affected Areas of Raghunathganj-I Block of Murshidabad District
Supply Delivery and installation of Exhaust Fan, Bearing, withdrawing of sludge and other allied works at Chakdah WTP in the district of Nadia, Under EMSD-II PHE Dte.
Construction of raised platform along with R.O. Plant room at the roof (6th floor) of Green Building at Medical College and Hospital, Kolkata
STRENGTHENING OF Y JUNCTION BY M.S JACKETTING OF 1500MM DIA AND 1600MM DIA S.S GRID ADJACENT TO CLEAR WATER PUMPING STATION OF 25 MGD WTP OF GRWW.
Operation, guarding, cleaning including daily periodic Maintenance etc of 1 MG UGR cum Clear Water Booster Pumping Station inside the campus of 104 MLD WTP at Bhatpara under Bhatpara Municipal Area
Operation and Maintenance of Iron Removal Plant ,Fault Detection and Repairing or replacing the damaged material of panel Board, Submersible Pump, existing chlorinator and other electrical and mechanical parts and Operation and guarding of all mac
Supply Installation Commissioning of Community Based Integrated Mini Arsenic and Iron Removal Plant AIRP with Solar Pump in different places Site Kalinagar Sadgop para at Mahisura of Nabadwip Block under MSDP for the year 2020-21
Operation and Maintenance of Arsenic cum Iron Removal Plant of Gobordanga Model ,Fault Detection and Repairing or replacing the damaged material of panel Board, Submersible Pump, existing chlorinator and other electrical and mechanical parts and Op
Renovation of Arsenic cum Iron Removal Plant at Bazitpur zone - I W/S Scheme including increasing the height of back wash water tank at Baduria Block under Basirhat Sub Division, PHE Dte. Capacity- 91.50 Cum/hr.
Operation and Maintenance of Arsenic cum Iron Removal Plant of Gobordanga Model ,Fault Detection and Repairing or replacing the damaged material of panel Board, Submersible Pump, existing chlorinator and other electrical and mechanical parts and Op
Design, Fabrication, Supplying, Erection, Installation Commissioning of Arsenic cum Iron Removal Plant Gobardanga Model Pressure Type with Trial run for a period of 3 (three) months after completion of the works and 60 (Sixty) months maintenance
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant for 5 No.s Schemes (Goknasree Gobindapur, Nalkora, Simla Durgapur, Rajapur and Sadiknagar Z-II ) under Basirhat Sub-Division of Barasat Division, P.H.E. Dte. Period 1 Year.
Augmentation of Gaukhana Piped water supply scheme to accommodate construction of OHR ,Arsenic cum Iron Removal Plant AIRP and service road , laying of design pipeline and providing FHTC Functional Household Tap Connection under Jal Jeevan Mis
Operation Maintenance for 3nos Arsenic cum Iron Removal Plant (Modified Sujapur Sadhipur Model) of Seikhpara Area (100 Cumhr.), Muradpur Jalangi Zone-I (54.00 Cumhr.) Brindabanpur (70.00 Cum/hr.) Water Supply Scheme of Islampur Sub-Division, un
Operation and Maintenance of Iron Removal Plant ,Fault Detection and Repairing or replacing the damaged material of panel Board, Submersible Pump, existing chlorinator and other electrical and mechanical parts and Operation and guarding of all mac
Operation and Maintenance of Arsenic cum Iron Removal Plant of Modified Sujapur sadipur Model for Kashipur Zone-I (AIRP Capacity-125.00 cub.m/Hr) ground Water supply Scheme under Berhampore Division-I, P.H.E Dte.(For Six Months)
Sinking of Tube Well and Construction of Arsenic and Iron removal plant at Kesabpur near Saifuddin House within Srinagar Matia GP under Basirhat-II Panchayat Samity for the Year 2025-2026 under 15th F.C Tied Fund.
Operation and Maintenance for Arsenic cum Iron Removal Plant of Bhandara PWSS( Capacity 110 m3/hr), Habaspur PWSS( Capacity 53 m3/hr),Kantanagar PWSS( Capacity 45 m3/hr) Under Murshidabad Division P.H.E. Dte.for 12(Twelve) Months.
Sinking of Tube Well and Construction of Arsenic and Iron removal plant at West Situlia near Najmul House within Champapukur GP under Basirhat-II Panchayat Samity for the Year 2025-2026 under 15th F.C Tied Fund.
Supplying and installation of Multi - Grade Filter, Iron Removal plant and cartridge filter alongwith supportive materials of 4000LPG capacity for treating board water of PWD campus at 3, Commissariat Road Hastings Kolkata-22 during 2023-24.
Supply Installation Commissioning of Community Based Integrated Mini Arsenic and Iron Removal Plant AIRP with Solar Pump in different places Site Kalinagar Kapaliparain in Mahisura GP of Nabadwip Block under MSDP for the year 2020-21
Renovation of Arsenic cum Iron Removal Plant at Bazitpur, zone - II W/S Scheme including increasing the height of back wash water tank at Baduria Block under Basirhat Sub Division, PHE Dte. Capacity- 90.00 Cum/hr.
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 83 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Betai Zone-II to accommodate FHTC under Tehatta Sub-division under Nadia Division, PHE.Dte
Operation and Maintenance of Arsenic cum Iron Removal Plant of Gobordanga Model ,Fault Detection and Repairing or replacing the damaged material of panel Board, Submersible Pump, existing chlorinator and other electrical and mechanical parts and Op
Operation and Maintenance of Arsenic cum Iron Removal Plant of Modified Sujapur Sadipur Model Gobardanga Model for Diar Shyampur Zone-I (AIRP Capacity-11.00 CuM/Hr), Dakshin Hanumantanagar (AIRP Capacity-110.81 CuM/Hr) and Sundarpur (AIRP
Renovation of Arsenic cum Iron Removal Plant at Bithari zone - I W/S Scheme including increasing the height of back wash water tank at Swarupnagar Block under Basirhat Sub Division, PHE Dte. Capacity- 153.00 Cum/hr.
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant of MAHESHPUR PWSS at Ratua-II under Malda Division, PHE Dte. Malda. In the District of Malda. (Period From 01/01/2024 to 31/12/2024).