Loading…
Loading…
12,052 results • Best match
Operation maintenance of water treatment plant with guarding under Bagmundi W/S Scheme under Purulia Sadar Sub-Division, P.H.E Dte. For the period of 01.09.2026 to 31.08.2027
Operation maintenance of 4464 KLD capacity water treatment plant site of Panradda W/S Scheme under Purulia Division P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Purbasthali kamalnagar wtp work
Operation and Maintenance for Arsenic cum Iron Removal Plant of Seikhpara Area PWSS( Capacity 100 m3/hr), Brindabanpur PWSS( Capacity 70 m3/hr), Garibpur Zone-II PWSS( Capacity 39.13 m3/hr) ,Garibpur Zone-I (Capacity 120m3/hr) PWSS, Barabil-R
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I, II, III, IV and Arsenic Iron Removal Plant at Nasipur Piped Water Supply Scheme in the district of Malda Under
Sl 4 Supplying Fabrication Erection on suitable RCC foundation and Commissioning with 3 three months Trial Run of pressure type Iron removal plant with Blower cum Compressor room of internal size 3.6 M X 3.00 M and Platform ofDangarvita ws scheme
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and Arsenic cum Iron Removal Plant of Capacity 11.00 Mhr. of PIRPUR Water Supply Scheme of Ratua-II Dev. Block under Malda Division, PHE Dte. Malda.
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I, II and Arsenic Iron Removal Plant at Purba Saidpur Piped Water Supply Scheme in the district of Malda Under Mald
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I, II, III and Arsenic Iron Removal Plant at Deonapur Piped Water Supply Scheme in the district of Malda Under Mal
Supplying Fabrication Erection on suitable RCC foundation and Commissioning with 3 months Trial Run of pressure type Iron Removal Plant with Blower cum Compressor Room of internal size 3600 mm 3000 mm with Platform of size 9000 mm 4500 mm
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I, II and Arsenic Iron Removal Plant at Nabinagar Piped Water Supply Scheme in the district of Malda Under Malda Me
Operation and Maintenance for Arsenic cum Iron Removal Plant of Ghorapakhiagangin Zone-I PWSS( Capacity 93.23 m3/hr), Mahadebnagar ZONE-I PWSS (Capacity 123 m3/hr), Birendanagar Zone-II (Capacity 15 m3/hr), Birendanagar Zone-I (Capacity 16 m3/hr)
Operation and Maintenance of distribution system and rising main pipe line CI / DI / UPVC/HDPE and Operation and Maintenance of Iron Removal Plant of Pressure Type IEP Capacity-80.00 cub.m/Hr and allied works of Bishnupur Zone-I and Bishnupur
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant for Tarapur Capacity 63 m3 Hr Pressure Type Kalaighata Capacity 31 m3 Hr Pressure Type and Gayeshpur Zone II Capacity 16 m3 Pressure Type WS Scheme under NAD I PHE Dte
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I, II and Arsenic Iron Removal Plant at Sadipur Piped Water Supply Scheme in the district of Malda Under Malda Mech
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I, II and Arsenic Iron Removal Plant at Sabdalpur Piped Water Supply Scheme in the district of Malda Under Malda Me
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Boalia (Capacity-123 m3/Hr., Gravity Type) Nabla (Capacity-30 m3/Hr., Pressure Type ) W/S Scheme under Nadia Arsenic Division - I P.H.E. Dte. for a period of 1(One) Year
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and Arsenic cum Iron Removal Plant of Capacity 99.00 Mhr. of SAMBALPUR Water Supply Scheme of Ratua-II Dev. Block under Malda Division, PHE Dte. Mald
Annual Operation Maintenance and Emergent repair of pipe line of distribution system Rising main and Arsenic cum Iron Removal Plant of Capacity 51.00 Mhr. of SULTANPUR Water Supply Scheme of Ratua-II Dev. Block under Malda Division, PHE Dte. Malda.
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I, II, III and Arsenic Iron Removal Plant at Uttar Jadupur Piped Water Supply Scheme in the district of Malda Unde
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant and Day to day Operation, Maintenance and Emergent repair at Nagharia Water Supply Scheme in English Bazar Block under Malda Arsenic Area W/S Division, PHE Dte. (for One Year)
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I, II and Arsenic Iron Removal Plant at Gayeshbari Piped Water Supply Scheme in the district of Malda Under Malda M
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Dhantala (Capacity-125 m3/Hr., Gravity Type ) Sabdalpur (Capacity-79 m3/Hr., Pressure Type) W/S Scheme under Nadia Arsenic Division - I P.H.E. Dte. for a period of 1(One) Year.
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and Arsenic cum Iron Removal Plant of Capacity 12.00 Mhr. of MAHESHPUR Water Supply Scheme of Ratua-I Dev. Block under Malda Division, PHE Dte. Malda
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and Arsenic cum Iron Removal Plant of Capacity 45.00 Mhr. of PAHARPUR Water Supply Scheme of Ratua-II Dev. Block under Malda Division, PHE Dte. Malda
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-XI and Arsenic Iron Removal Plant at UTTAR CHANDIPUR (ZONE-I) Piped Water Supply Scheme in the district of Malda Und
Annual Operation and Maintenance of 4 Nos Arsenic cum Iron Removal Plant of different capacity located in different block (Simla Durgapur, Taranipur Z-II, Bajitpur Zone-I and Bithari Z-I) under Basirhat Sub-Division of Barasat Division, P.H.E. Dte
Operation and Maintenance for Arsenic cum Iron Removal Plant of KASIADANGA ZONE-I ( Capacity 143 m3/hr), ZONE-II ( Capacity 114m3/hr), Mithipur PWSS( Capacity 40 m3/hr) Sekendra PWSS( Capacity 50 m3/hr) Aurangabad PWSS( Capacity 120 m3/hr) PWSS
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 54 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Bareya Zone-I to accommodate FHTC within Tehatta-II block under Tehatta Sub-division under Nadia Division, P.H.E.
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-XIV,XV and Arsenic Iron Removal Plant at Uttar Chandipur(Zone-IV B) Piped Water Supply Scheme in the district of Ma
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 30 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Karimpur Jalangi Zone-VI (Part-B) to accommodate FHTC under Tehatta Sub-division under Nadia Division, P.H.E. Dte.
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Tarapur (Capacity-63 m3/Hr., Pressure Type ) Paschim Noapara (Capacity-78 m3/Hr., Gravity Type) WS Scheme under Nadia Arsenic Division - I P.H.E. Dte. for a period of 1(One) Year
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Kalaighata (Capacity-31 m3/Hr., Pressure Type ) Birnagar (Capacity-62m3/Hr., Combined Type ) W/S Scheme under Nadia Arsenic Division - I P.H.E. Dte. for a period of 1(One) Year
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 42 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Bareya Zone-II to accommodate FHTC within Tehatta-II block under Tehatta Sub-division under Nadia Division, P.H.E.
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Dubli Zone-I (Capacity-105 m3/Hr., Pressure Type ) Dubli Zone-II(Capacity-73 m3/Hr., Pressure Type ) W/S Scheme under NAD-I P.H.E. Dte. for a period of 1year
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I, II and Arsenic Iron Removal Plant at Masimpur Piped Water Supply Scheme in the district of Malda Under Malda Mec
Construction of Arsenic and Iron Removal plant with DWS under CPP. (Activity Code no- 116692497) at Janaseba Upper Primary School Mouza- Maslandapur (Ct), J.L.no. 169, Dag no-1195, Sansad no.-XI in Maslandapur-I GP under Habra-I Panchayat Samity,
Sinking of 128x80mm Deep Tube well by Odex-115 method and SITC of iron removal plant with all allied works for alternative source of water at Guest House of North Bengal Development Department, Himachal Bihar, Matigara in the district of Darjeeling.
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I , II , III and Arsenic Iron Removal Plant at Alipur Piped Water Supply Scheme in the district of Malda Under Malda
Repairing and Rehauling of Filter Media of Arsenic and Iron Removal Plant (Pressure Type) (Capacity 21 cum /Hr) including priming painting and ancillary works of MAHABBATPUR W/S scheme at Manikchak Block under Malda Arsenic Area W/S Division PHE Dte.
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant and Day to day Operation, Maintenance and Emergent repair at Laxmighat Water Supply Scheme in English Bazar Block under Malda Arsenic Area W/S Division, PHE Dte. (for One Year)
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant of capacity 21.0 Cum/Hr at Mahabbatpur W/S Scheme under Malda Arsenic Area W/S Division, P.H.E. Dte. (Period From 01/04/2024 to 31/12/2024)275 Days
Repairing and Rehauling of Filter Media of Arsenic and Iron Removal Plant (Pressure Type)(Capacity 2cum/Hr) including priming painting and ancillary works of TALIMNAGAR W/S scheme at Manikchak Block under Malda Arsenic Area W/S Division PHE Dte.
Operation Maintenance of Arsenic cum Iron Removal Plant at Auldanga Zone-I (Capacity 147.88 cum/hour) Ichhlampur Zone-II (Capacity 66.75 cum/hour) OHR site at Bongaon Block under North 24 Pgs. Water Supply Division-I, PHE Dte. for 365 days.
Operation Maintenance of Arsenic Cum Iron Removal Plant at Paschim Panchberia Zone-I (110.50 cum/hr) Paschim Panchberia Zone-II (59.875 cum/hr) OHR site at Bongaon Block under North 24 Pgs. Water Supply Division-I, PHE Dte. for 365 days.
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Nrisingapur (Capacity-216m3/Hr., Gravity Type Goalpur Zone II (Capacity-11 m3/Hr., Pressure Type ) W/S Scheme under Nadia Arsenic Division - I P.H.E.Dte. for a period of 1One year
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant and Day to day Operation, Maintenance and Emergent repair at Laxmighat Water Supply Scheme in English Bazar Block under Malda Arsenic Area W/S Division, PHE Dte. (For One Year)
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant and Day to day Operation, Maintenance and Emergent repair at Nagharia Water Supply Scheme in English Bazar Block under Malda Arsenic Area W/S Division, PHE Dte. (For One year)
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and Arsenic cum Iron Removal Plant of Capacity 99.00 M3 hr. of SAMBALPUR Water Supply Scheme of Ratua-II Dev. Block under Malda Division, PHE Dte.
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and Arsenic cum Iron Removal Plant of Capacity 45.00 M hr. of PAHARPUR Water Supply Scheme of Ratua-II Dev. Block under Malda Division, PHE Dte.