Loading…
Loading…
12,051 results • Best match
CMC of the existing STP, ETP, WTP and Water Supply System (including consumables, spares etc.) for Super Speciality Hospital (G plus 9) of Deben Mahata Govt. Medical College and Hospital at Hatuara, Purulia
Providing, Installation and Commissioning of Pre and Post Gaseous Chlorination Arrangement along with Other Allied Works at WTP Complex of Balia Surface Based Water Supply Scheme Block - Sagordghi under Berhampore Mechanical_Electrical Division PHE
Round the Clock Guarding Arrangements to protect the Govt. properties/ Materials etc. at WTP Site in Mouza- Khanamuri under Sub- Surface Based Piped Water Supply Scheme for Nayagram Block(Part) for 12 months.
Repairing of 280 KW soft Starter Panel by supplying of different spare parts including allied works at WTP of Nakashipara (Part-II ) SWB W/S project under EMSD-III, PHE dte.(SM/00874)
As per BOQ
AS PER BOQ
97117257-Installation of Solar Based Asenic Free Structure Near Amirul Mondal House, Sansad- XVI, Mouza Umapatipur under Chandipur GP
97118526- Installation of Solar Based Asenic Free Drinking Water Structure Near Hurannesa house, Sansad- XXII, Mouza Keotsha under Chandipur GP.
97116633-Installation of Solar Based Asenic Free Drinking Water Structure Near Samad Biswas House, Sansad- XV, Mouza Umapatipur under Chandipur GP
97112937- Installation of Solar Based Asenic Free Drinking Water Structure Near Mostafa Mollick House, Sansad-II,Mouza Chandipur under Chandipur GP
Construction of Solar Powered Standalone Community Water Purification Plant for uncovered habitations incl. 3month trial run and 5years OandM Block-Tehatta-I,Panchayet-Chanderghat,Village-Chakhanspukuria, Kamalpur,Kushita under Nadia Division(Sl-4)
Installation of Arsenic, Iron and Bacteria free community based Mini Sajaldhara (drinking water purification Plant) near H/o Sukharanjan Debnath, Sansad-VII Under-CMCB GP Under -15Th CFC(Tied) Fund 2024-25 (88992011)
Installation of Arsenic, Iron and Bacteria free community based Mini Sajaldhara (drinking water purification Plant) near H/o Shayamal Das, Sansad-X Under-CMCB GP Under -15Th CFC(Tied) Fund 2024-25 (88991329 )
Construction of 7 Nos. Solar Powered Standalone Community Water Purification Plant....3month trial run and 5years OandM,Block-Ranaghat-II,Panchayet-Bahirgachhi,Duttapulia,Debagram Vill.-Daluabari,Kalipur,Kusbaria,GopinagarBaghadanga underNAD-I(Sl-1)
Installation of Arsenic Iron and Bacteria free Community based drinking water purification Plant Sajal dhara Project at Paschim Putkhali Baidyapur II G.P . Under Ranaghat II Dev. Block of year 21 22 APP 47179252
Construction of 5 Nos.Solar Powered Standalone Community Water Purification Plant .... including 3month trial run and 5 years OandM, Block-Habra-II,Panchayet-Dighramalikberia,Village-Kadpur, Randhangachha, Solemanpur under Barasat Division,PHED(SL-6)
Construction of Solar Powered Standalone Community Water Purification Plant for uncovered habitations including 3month trial run,5years OandM Block-Tehatta-I,Panchayet-Shyamnagar, Village-Surupur,Syamnagar under Nadia Division, PHE Dte. (Sl-6)
Repairing Renovation of Solar Powered Standalone Community Water Purification Plant at Chapra, Tehatta-I, Tehatta-II, Kaliganj and Nakashipara Blocks within Nadia District under RWS Nadia Sub-Division of Nadia Division, PHE Dte.
Installation of Standalone Community Water Purification Plant with Solar Panel Fitted Pump Set Iron and Arsenic Removal in Drinking water at Bagula Madhyapara within Bagula 2 GP under Hanskhali Development Block Head BADP
Installation of Arsenic Iron and Bacteria free Community based drinking water purification Plant Sajal dhara Project at Belgharia Madhya, Baidyapur II G.P Under Ranaghat II Dev Block of year 21 22 APP 47167836
Construction and Operation and Maintenance of Solar Powered Standalone Community Water Purification Plant at RWS Nadia Sub-Division Office Campus within Nadia District under RWS Nadia Sub-Division of Nadia Division, PHE Dte.
Installation of Standalone Community Water Purification Plant with Solar Panel Fitted Pump Set Iron Bacteria Arsenic Removal in Drinking water at Dakshinpara Hat Prangan Dakshinpara within Dakshinpara 1 G.P. under Hanskhali Panchayet Samity
Construction of Community based Purified drinking water Unit with distribution system for beneficiari at Takurirdanga_Community Drinking Water Purification Plant with Spot Source for removal of Arsenic, Iron, Bacteria etc. present in ground water.
Installation of the Sajal Dhara project at jaynagar Provatnagar sansad (Installation of Drinking water purification plant operated by solar energy with required infrastructure facilities under Dakshinpara II GP with in Hanskhali Development Block,
SAJAL DHARA AT DEBIPUR TALTALA PARA SANSAD-XII(56702666)(AAP-04/22-23) Installation of drinking water purification plant operated with solar power construction for Arsenic affected habitation at different pin pointed sites
Construction of Solar Powered Standalone Community Water Purification Plant for uncovered habitations at Block-Rajarhat, Panchayet-Rajarhat Bishnupur I, Jyangra Hatiara II, Village- Kalaberia, Ghuni, under Barasat Arsenic Division , PHE Dte. (SL-06)
Construction of 01 Number Community Based Water Purification Plant for Removal of Arsenic and Iron in drinking water at Deganga Kishan Mandi for establishment of honey hub Deganga under District North 24 Parganas
Construction of Community Drinking water purification plant with spot source for removal of Iron, Bacteria etc present in water at Chelod Shivmandir, sansad no. iii, under Tirat Gram Panchayat from 14th FC Basic
Construction of Solar Powered Standalone Community Water Purification Plant for uncovered habitations at Block-Rajarhat, Panchayet-Jyangra Hatiara II, Rajarhat Bishnupur I, Village- Ghuni, Kalaberia under Barasat Arsenic Division , PHE Dte. (SL-05)
Construction of Arsenic and Iron Removal plant with DWS under CPP. (AAP no-1/Tide/22-23) at Mouza-Sadpur, J.L.no. 159, Dag no-1453, Khatian no-437, Sansad no.-XIV in Maslandapur-I GP under Habra-I Panchayat Samity,North 24 Parganas.
Construction of Arsenic and Iron Removal plant with DWS under CPP. (AAP no-4/Tide/22-23) at Mouza-Krishnanagar, J.L.no. 145, Dag no-341, Khatian no-415, Sansad no.-IX in Bergoom-II GP under Habra-I Panchayat Samity,North 24 Parganas.
Supplying Fabrication Erection on suitable RCC foundation and Commissioning with 3 months Trial Run of pressure type Iron Removal Plant with Blower cum Compressor Room of internal size 3600 MM AND 3000 MM with Platform of size 9000 mm and 4500 MM
Annual Operation Maintenance of Arsenic cum Iron Removal Plant of SAMBALPUR Water Supply Scheme of Capacity 99.00 Mhr. at Ratua-II Dev. Block under Malda Division, PHE Dte. Malda. In the District of Malda. (Period from 01/11/2021 to 31/10/2022).
Renovation of 2 (two) nos. Iron removal Plant near tank No. 1 and 2 and supplying Fabrication, Erection on suitable R.C.C. Foundation of 01 (one) no. I.E.P. near tank No. 3 at Sagar Mela ground in connection with Ganga Sagar Mela 2020.
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and Arsenic cum Iron Removal Plant of Capacity 39.00 Mhr. of BAKHRA Water Supply Scheme of Ratua-I Dev. Block under Malda Division, PHE Dte. Malda. I
Operation Maintenance of Arsenic cum Iron Removal Plant of SULTANPUR Water Supply Scheme of Capacity 51.00 M3 hr. at Ratua-II Dev. Block under Malda Division, PHE Dte. Malda. In the District of Malda. (Period From 01/11/2023 to 31/03/2024).
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Ukilnara Zone I (Capacity-45 m3/Hr., Pressure Type ) Ukilnara Zone II (Capacity-16m3/Hr., Pressure Type) W/S Scheme under Nadia Arsenic Division I P.H.E.Dte. for a period of 1 year
Operation Maintenance of Arsenic cum Iron Removal Plant of PAHARPUR Water Supply Scheme of Capacity 45.00 M3/hr. at Ratua-II Dev. Block under Malda Division, PHE Dte. Malda. In the District of Malda. (Period From 11/10/2023 to 31/03/2024).
Operation Maintenance of Arsenic cum Iron Removal Plant of BAKHRA Water Supply Scheme of Capacity 39.00 M3/hr. at Ratua-I Dev. Block under Malda Division, PHE Dte. Malda. In the District of Malda. (Period From 11/10/2023 to 31/03/2024).
Operation Maintenance of Arsenic cum Iron Removal Plant of SAMBALPUR Water Supply Scheme of Capacity 99.00 M hr. at Ratua II Dev. Block under Malda Division, PHE Dte. Malda. In the District of Malda. (Period From 01/10/2024 to 30/09/2025).
Annual Operation Maintenance of Arsenic cum Iron Removal Plant of SAMBALPUR Water Supply Scheme of Capacity 99.00 Mhr. at Ratua II Dev. Block under Malda Division, PHE Dte. Malda. In the District of Malda. (Period from 01/11/2022 to 31/10/2023).
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Gobindapur Zone II (Capacity-121 m3/Hr., Gravity Type ) Gayespur Zone II Capacity-16 m3/Hr., Gravity TypeW/S Scheme under Nadia Arsenic Division I P.H.E.Dte. for a period 1 One year
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 30 m3/hr capacity for Augmentation of Ground Based Water Supply Scheme at Muktadaha Zone-II including 3 Months Trial Run 3 Years O and M to accommodate FHTC under Division,P.H.E. Dte
Supplying, fabrication, erection on subitable RCC foundation and commissioning with 3 months trial run of pressure type Iron Removal Plant with bower cum compressor room of internal size (3.6 M X 3.00 M) and platform of size (9.00 m X 4.50 m) for
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Bhayna Zone - II (Capacity-19 m3/Hr., Gravity Type ) Ramnagar(Capacity-71 m3/Hr., Pressure Type ) W/S Scheme under Nadia Arsenic Division - I P.H.E. Dte. for a period of 1 year
Annual Operation Maintenance of Arsenic cum Iron Removal Plant of SULTANPUR Water Supply Scheme of Capacity 51.00 M3hr. at Ratua II Dev. Block under Malda Division, PHE Dte. Malda. In the District of Malda. (Period from 01/11/2022 to 31/10/2023).
Annual Operation Maintenance of Arsenic cum Iron Removal Plant of SULTANPUR Water Supply Scheme of Capacity 51.00 Mhr. at Ratua-II Dev. Block under Malda Division, PHE Dte. Malda. In the District of Malda. (Period from 01/11/2021 to 31/10/2022).
Operation Maintenance of Arsenic cum Iron Removal Plant of SAMBALPUR Water Supply Scheme of Capacity 99.00 M3 hr. at Ratua-II Dev. Block under Malda Division, PHE Dte. Malda. In the District of Malda. (Period From 01/11/2023 to 31/03/2024).
Sl 3 Supplying Fabrication Erection on suitable RCC foundation and Commissioning with 3 three months Trial Run of pressure type Iron removal plant with Blower cum Compressor room of internal size 3.6 M X 3.00 M and Platform of Bairagi ws scheme
Annual O and M of Arsenic cum Iron Removal Plant for Nrisinghapur (Capacity-216 m3/Hr., Gravity Type ) Goalpur Zone-II (Capacity-11m3/Hr., Pressure Type ) W/S Scheme, Goalpur Zone-I (Capacity 15m3/hr Composite W/S Scheme under NAD-I PHED