Loading…
Loading…
58 results • Latest
Repair and renovation of CCC building and other allied civil works at Basirhat CCC under Basirhat Division in 24 Pgs(N) Region, WBSEDCL
Construction of Boundary wall and other allied civil works at Larica 33/11 kV substation under Barasat Division in 24 Pgs(N) Region, WBSEDCL
Construction of parking area of Habra Division Administrative Building under Habra Division, 24Pgs(N), WBSEDCL
Laying of 33KV 3CX400SQMM XLPE cable for proposed 33KV UG line from Nilganj 132KV Substation to KMDA KV substation-Part-II 4.011 km under Barrackpore Division, WBSEDCL.
Laying of new 11KV UG line of RL-0.220KM for effecting new bulk connection AVENTAS under Barrackpore Division, WBSEDCL
Augmentation of existing 3CX185sqmm XLPE UG cables by 3CX300sqmm XLPE UG Cables i r o Madhyamgram Sodepur New Barrackpore 11KV feeders under Sajirhat Substation under Barrackpore Division
Tender for laying of 11KV UG cable (by using XLPE 3C x 300sqmm) i.r.o. 11KV Sadhanpur and Talsa feeder emanating from Jeerat 33/11KV Sub-station under Barasat Division.
Laying of 500Mtr 300sqmm XLPE cable is considered through Micro tunneling (260m) with 160mm dia PE-80 PN 6 HDPE Pipe at location Halisahar Choumatha more for new 11 KV feeder from Halisahar 33/11KV substation under Naihati Division
Renovation including Electrical and Civil work of Chord Road 33/11 KV SubStation under Naihati(D) Division (Details of the work attached with NIT)
Re-routing of 33 KV line by laying of 3C XPLE 400 sq mm by Micro tunneling work of 415 Mtr with laying of HDPE pipe (200sq mm PE-100, PE10) for Railway crossing at Kanchrapara Kalyani Rail crossing and Road crossing near SNR Carnival under Naihati Di