Loading…
Loading…
112 results • Latest
Laying 11 KV 3Cx185 sqmm XLPE UG cable of RL 0 220 KM frm SIRAKOLE 33 11 KV substn up to the premises of Linc LTD Unit 2 at Usthi Road Sirakole wth othr allied worksfor givin power connectin at premises of Linc Limited Unit 2 of 700 KVA under Behala
Laying of HTUG line of RL 0.620KM including Micro tunneling 0.560 KM after tapping from existing 11 KV Fartabad feeder and Nabagram 11 KV feeder emanated from Garia 33KV Ss for 4 Sight Green Leaf Garia ccc under Garia Division WBSEDCL
Supply and delivery of LT Dist kiosk for 100KVA TRNF.(SMC)Preferably SINTEX/RAYCHEM/TYCO
Through repair maintenance of CRB with fixing of chequered tiles, inside and outside painting and installation of 1HP submersible pump including new sanitary fittings and creation of Security room at Renia 33 by 11 KV Sub Stn. under Garia Div.
Supply and delivery of piercing connector ABC 50-70 SQMM as per NIT
Drawl 33kv HTUG line by laying 300 meter 3Cx400 sqmm cable from Genexx Valley 33 11 KV S Stn to Merlin Acropolis Retail P LT(prop 33kv blk cons) and erect of 33KV CT VCB with making CT VCB found and cbl trnch and other allid works under Behala Diviso
Supply and delivery of LT Dist Box 3PH Con WH ST STRAP and BUCKLE,Preferably INDO / MACEDON / RMW.
Extension of new 11KV Subhasnagar feeder from Southwind SubStation with 11KV 3C 300sqmm XLPE Cable of RL 0.350KM including Micro tunneling 0.330 KM to effect the connection under procedure B iro Royal Vistas at Missionpally under Sonarpur CCC
Supply and Delivery of different Local Materials mentioned in NIT under Kakdwip Division, WBSEDCL.
Supply and Delivery of Local Matrials 1. LT distribution KIOSK for 25KVA TRNF. 2. LT distribution KIOSK for 100KVA TRNF. 3. LT distribution KIOSK for 63KVA TRNF.