Loading…
Loading…
11 live3 closing this weekmost from PWD
11 results • Latest
FOR UPGRADATION OF BRIDGE FROM SINGLE LANE TO TWO LANE SILKYARA BANGAWN CHAPDA SAROT MOTAR ROAD AT KM 65 CHAINAGE 64.650 IN CHINYALISAUR BLOCK UTTARKASHI DISTRICT UNDER STATE SECTOR BRIDGE (AS PER RFQ AND TOR)
FOR UPGRADATION OF BRIDGE FROM SINGLE LANE TO TWO LANE SILKYARA BANGAWN CHAPDA SAROT MOTAR ROAD AT KM 47 CHAINAGE 46.750 IN CHINYALISAUR BLOCK UTTARKASHI DISTRICT UNDER STATE SECTOR BRIDGE (AS PER RFQ AND TOR)
FOR UPGRADATION OF BRIDGE FROM SINGLE LANE TO TWO LANE SILKYARA BANGAWN CHAPDA SAROT MOTAR ROAD AT KM 65 CHAINAGE 64.100 IN CHINYALISAUR BLOCK UTTARKASHI DISTRICT UNDER STATE SECTOR BRIDGE (AS PER RFQ AND TOR)
UPGRADATION OF BRIDGE FROM SINGLE LANE TO TWO LANE SILKYARA BANGAWN CHAPDA SAROT MOTAR ROAD AT KM 67 CHAINAGE 66.600 IN CHINYALISAUR BLOCKUTTARKASHI DISTRICT UNDER STATE SECTOR BRIDGE (AS PER RFQ AND TOR)
UPGRADATION OF BRIDGE FROM SINGLE LANE TO TWO LANE SILKYARA BANGAWN CHAPDA SAROT MOTAR ROAD AT KM 76 CHAINAGE 75.400 IN CHINYALISAUR BLOCK UTTARKASHI DISTRICT UNDER STATE SECTOR BRIDGE (AS PER RFQ AND TOR)
Upgradation work of 15 meter RCC Bridge for one lane to two lane at Km 26 of Badethi-Banchaura-Badrigaad state highway (SH-16) under State sector (ADB funded) at Chinyalisaur, District Uttarkashi.(Phase-I) (As per RFQ and TOR)
Consultancy Service for Upgradation work of single lane class B loading bridge to double lane class A loading Bridge at km 9 (Ch 8.025 km) ,10 (ch 9.975 km) and 13 (CH 12.775) of Uttarkashi-Ghansali Tilwara State Highway (SH-15)at Bhatwari Uttarkashi
Protection work in Harshil -Mukhwa Motor Road of Gangotri Constituency in District Uttarkashi block Bhatwari Under SDMF
Protective works under SDMF 2025-26 to prevent land subsidence beneath the houses in Basrali Takhala settlement located along the route from Rajgarhi Sarnaul Motor Road via Lasari Takhala in Naugaon Development Block Yamunotri Assembly Constituency U
Strengthening and Improvement of remaing part of Jatta Paletha Khansi Motor road under state sector in block Naugaon, Purola Assembly constituency in distric Uttarkashi.(Chainage 3.00 to 8.00 Km total 5.00 Km)
Under One Time Maintenance, The Work of Improvement of Motor Road Lakhamandal to Bhankoli Transferred From P.M.G.S.Y. in Block Naugaon of Uttarkashi District