Loading…
Loading…
40 results • Latest
KYOCERa OEM Toner Cartridge Manufactured by Kyocera Document Solutions India Private Limited
KYOCERa Electrophotography/Xerography (Laser/LED) Monochrome (Black) A3, Legal and A4 size Multifunction Machine Printer
Industrial composite color 3D Printer (Q2)
Water Quality Meters/Analyzers (Q3)
hp Electrophotography/Xerography (Laser/LED) Monochrome (Black) A4 and Legal Size Multifunction Printer (MFP)
acer High End Desktop Computer with Warranty 3 Year
INP Entry Level Desktop Computer with Warranty 5 Year
Geographic Information System (GIS) Software (V3) (Q2)
Reconstruction of RCC Bridge of 5 Span of 8 Mtr each on Ajnala Chogawan Road to Poonga Road at RD 6000 (Under PMGSY-III, Batch-I) Year 2024-25, Distt. Amritsar. Package No. PB01164A
Const. of 30.0 M Bridge (2-Span 15.0 M EACH) Over Sakki Drain at RD. 0.540 on Link Road T05 Ajnala-FGC Road to Focal Point Chamiari via Ibrahimpura Harrar Kalan (Amritsar) Block Ajnala Distt Amritsar Package No. PB01163A
Const. of Bridge 3 Span 8.0 M each over Hudiara Nallah at RD. 103800 on Link Road Asr-Ranian Road to Jhanjoti at RD 0/785 under PMGSY-III, Distt Amritsar (Pkg No. PB01157)
RO FILTER 12 LITER, REFRIGERATOR 200 LITER, EXIDE BETTARY 200AH, DOOR CURTAINS, SOFA
UPGRADATION OF L/R AMBALA CHANDIGARH ROAD NH - 22 (LALRU) TO HARYANA BORDER (PANJOKHRA SAHIB) VIA SITARPUR, BATOULI AND JAROUT (T-04 ) FROM KM.-0/000 TO KM.- 7/800 UNDER PMGSY-III (BATCH - III).
RECONSTRUCTION OF 26M TRIPLE SPAN RCC BRIDGE AT RD 59460 VILLAGE HERON KALAN ON BAHADUR SINGH WALA DRAIN ON LINK ROAD MATTI BHIKHI DHANAULA ROAD TO CHEEMA UPTO DISTRICT BOUNDARY, BLOCK BHIKHI, DISTT. MANSA. UNDER PMGSY- III (BATCH-2) PB-11-307
CONSTRUCTION OF 3 SPAN RCC BRIDGE 7 MTRS EACH ON LINK ROAD SUJANPUR TO SARNA ALONG UBDC MALIKPUR HEAD WORKS UNDER PMGSY- III BATCH-2 PACKAGE NO. PB 21-004 BLOCK SUJANPUR DISTT. PATHANKOT PB-21-004
UPGRADATION OF SUJANPUR TO SHAHPUR KANDI UNDER PMGSY III BATCH-3 LENGTH 8.90 KM BLOCKSUJANPUR DISTT PATHANKOT PB 21-007
Reconstruction of RCC Bridge of 5 Span of 8 Mtr each on Ajnala Chogawan Road to Poonga Road at RD 6000 (Under PMGSY-III, Batch-I) Year 2024-25, Distt. Amritsar. Package No. PB01164A
UP-GRADATION OF LINK ROAD UPGRADATION OF LINK ROAD BAGHAPURANA MUDKI ROAD ODR 06 RD 6.30 TO TR13 BHALOOR VIA NATHU WALA NATHE WALA. Package No. PB-12065 UNDER PMGSY III BATCH. II Year 2023.24 Length 7.87 KM Balance Work
Const. of 30.0 M Bridge (2-Span 15.0 M EACH) Over Sakki Drain at RD. 0.540 on Link Road T05 Ajnala-FGC Road to Focal Point Chamiari via Ibrahimpura Harrar Kalan (Amritsar) Block Ajnala Distt Amritsar Package No. PB01163A
RFP For Selection of Eligible Agencies to Implement and Manage Samekit Birsa Gram Yojana sah Krishak Pathshala Yojana in Jharkhand
hp A4 and Legal Monochrome (Black) Laser Computer, hp A4 and Legal Monochrome (Black) Laser Computer Printer
Up-gradation of FGC-Ajnala Road to Gorenangal via Mohan Bhandarian Bohranwala, Kot Mughal, Madhushanga, Mattenangal (T-03) under PMGSY-III (Batch-III), Block Ajnala, Distt. Amritsar. (Pkg No. PB01160)
Up-gradation of Gaggomahal to Dialpur via Abusaid Nanoke (Chamiari Sudhar Road) (MRL-03) From KM 0.000 to KM 5.800 under PMGSY-III (Batch-III), Block Ajnala, Distt. Amritsar. (Pkg No. PB01161)
UPGRADATION OF SUJANPUR TO SHAHPUR KANDI UNDER PMGSY III BATCH-3 LENGTH 8.90 KM BLOCKSUJANPUR DISTT. PATHANKOT PB 21-007
NH-7 KARAMGARH SHATRAN TO CHUGHE KALAN VIA SARDARGARH MRL-03 LENGTH 5/45 UNDER PMGSY-3 BATCH-III BLOCK BATHIDA DEHATI DISTT BATHINDA
UPGRADATION OF SHEIKH UPTO BLOCK BOUNDARY VIA CHATTEANA BHALIANA KOTLI ROAD T-19 FROM LENGTH 18/57 FROM UNDER PMGSY-III BATCH-III BLOCK KOTBHAI AT GIDDERBAHA DISTT MUKTSAR
CONST OF 41.90 M SPAN BRIDGE 5-SPAN 8.38M EACH AT RD 1665 M ON LINK ROAD TR 08 KHEOWALI DHAB TO KABULSHAH TO RAMKOT TO SUGAR MILL NH 07 WIDENING OF EXISTING BRIDGE UNDER PMGSY III BATCH -3 YEAR 2024-25 DISTRICT FAZILKA PACKAGE NO PB-19-313 A
20 MTR 2 SPAN HI LEVEL BRIDGE OVER PAVITTER BEIN CROSSING LINK ROAD TANDA SRI HARGOBINDPUR ROAD TO SH_22 TO GHORESHAWAN KM 2.950 AT FEROZE RAULIAN PB07314A
CONSTRUCTION OF 98.0 M 2-SPAN STEEL TRUSS BRIDGE OVER ABOHAR BRANCH RD-180265 FEET ON LINK ROAD JAGRAON TO HATHUR TO DALLAH, MALLAH, CHAKKAR ROAD T-01 From km. 0.000 to KM. 24.580 Under PMGSY-lll Batch-3 in District Ludhiana. Package No. PB-10-135A
Package No PB-06-104, PB-06-105, PB-06-106, PB-06-107 and PB-06-108
TRIMAX 0.5 mm Both(Plastic and Metal) Blue Rollerball Pen
TRIDENT COPIER 2.18 kilogram Ream of 500 Sheet 70 gsm A4 size, TRIDENT COPIER 2.18 kilogram Ream of 500 Sheet 70 gsm A4 size Plain Copier Paper
Const. of 30.0 M Bridge (2-Span 15.0 M EACH) Over Sakki Drain at RD. 0.540 on Link Road T05 Ajnala-FGC Road to Focal Point Chamiari via Ibrahimpura Harrar Kalan (Amritsar) Block Ajnala Distt Amritsar Package No. PB01163A
Reconstruction of RCC Bridge of 5 Span of 8 Mtr each on Ajnala Chogawan Road to Poonga Road at RD 6000 (Under PMGSY-III, Batch-I) Year 2024-25, Distt. Amritsar. Package No. PB01164A
Unbranded Work Bench with top size 65 mm X 65 mm X 8, Unbranded Work Bench with top size 65 mm X 65 mm X 8 mm
Canon Inkjet Monochrome (Black) A4 and Legal Size, Canon Inkjet Monochrome (Black) A4 and Legal Size Multifunction Printer (MFP)
BALANCE WORK for UPGRADATION OF SUJANPUR TO SARNA ALONG UBDC UNDER PMGSY- III BATCH-2 Block Sujanpur Distt Pathankot LENGTH 8.84 KM
MARUTI SUZUKI INDIA LIMITED Passenger Car SUV, MARUTI SUZUKI INDIA LIMITED Passenger Car SUV (Sports Utility Vehicle) Petrol