Loading…
Loading…
3 results • Latest
Package XXXVII: WB and ADB funded Amaravati Capital City Development Program Related Construction of flood protection and strengthening of inspection of Right Bank of River Krishna E1 Road (Chainage 0+300 to Chainage 2+480) on Lump Sum basis (% contract) in Amaravati, Andhra Pradesh
Earthwork excavation in soils up to SDR by mechanical means including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines , grades and cross sections etc., and transporting to the embankment location with all lifts etc., with disposal upto 1000 metres complete for finished item of work for trench cutting as per MoRT&H specification 301 (5th Revision) and as directed by the Engineer-in-Charge.
Package XXXVIII: WB and ADB funded Amaravati Capital City Development Program Related Construction of flood protection and strengthening of inspection of Right Bank of River Krishna E1 Road (Chainage 2+480 to Chainage 4+990) on Lump Sum basis (% contract) in Amaravati, Andhra Pradesh
Earthwork excavation in soils up to SDR by mechanical means including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines , grades and cross sections etc., and transporting to the embankment location with all lifts etc., with disposal upto 1000 metres complete for finished item of work for trench cutting as per MoRT&H specification 301 (5th Revision) and as directed by the Engineer-in-Charge.
Package XXXIX: Construction of Flood Protection and Strengthening of Inspection of Right Bank of River Krishna E1 Road (Chainage 4+990 To Chainage 7+200) On Lump Sum Basis (% Contract) In Amaravati, Andhra Pradesh
Earthwork excavation in soils up to SDR by mechanical means including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines , grades and cross sections etc., and transporting to the embankment location with all lifts etc., with disposal upto 1000 metres complete for finished item of work for trench cutting as per MoRT&H specification 301 (5th Revision) and as directed by the Engineer-in-Charge.