Construction of Community Shed at Barabani Village under Barabani AC district of Paschim Bardhaman.
Earthwork in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone ) including removing spreading or stacking the spoils within a lead of 75 metre as per direction.The items includes necessary trimming the sides of trenches, levelling , dressing & ramming the bottom , bailing out water as required complete.
CIVIL WORKS
Repair to pot holes by removal of failed material, trimming the sides to vertical and leveling the bottom, cleaning the same with compressed air or any appropriate method filled with B.M (thickness not more than 75 mm in single layer) applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per technical specifications Clauses 502 and 503 for Rural Roads of MORD.
CIVIL WORKS
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (i) With pumping out water including shoring as required.
CIVIL WORKS
Repair to pot holes by removal of failed material, trimming the sides to vertical and leveling the bottom, cleaning the same with compressed air or any appropriate method filled with B.M (thickness not more than 75 mm in single layer) applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per technical specifications Clauses 502 and 503 for Rural Roads of MORD.
CIVIL WORKS
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (i) With pumping out water including shoring as required.
Supply, Installation and Commissioning of LED Street Lighting arrangement in Sitla Ranga Para (Bauri Para) of ward no-21 within A.M.C of 281-Asansol Uttar AC BEUP FUND
Supply of Hot dip Galvanized Swaged type Steel Tubular pole of 7.0 mtr long with inbuilt junction box including cut-out, terminal etc. for cable termination, base plate, pole cap & 1.5 mtr long swan neck as per specification IS : 410 SP 3 at work site of make BPP/Utkarsh Tubes and Pipes Ltd./Skipper Steel Ltd./Subham Pole. (Analysis rate)