Sr.DEN/East/SBC section: Bengaluru- Jolarpettai section: Collection of machine crushed ballast along side the track in connection with the works of a) SBC Division: Construction of Track Machine siding for a length of 420m at 15 minor stations in SBC division (MLO, SKPT, SVS & MAR Stations). b) Through Ballast recoupment for a length of 22 km from 313/000-332/000,330/000- 333/300,340/000-341/300 on UP line and 325/400-332/200,337/400-339/000 on Down line in SSE/PWAY/WFD section. c) TTR(FS+TWS+WCMS): 49 Sets & TTR (TWS+WCMS): 10 Sets in connection with increasing speed from 110 to 130 kmph. d)Through Ballast recoupment of Points & Crossings 15 numbers in Sr.DEN/East/SBC section. e) Bengaluru Division:- Construction of New AC Loco Trip Shed at SMVB and g) Increasing Sleeper Density from 1310 to 1540 for a length of 8.042 kms in SBC yar Rd No.5, 6, 7, 14, 15 and 16 in SSE/P.Way/SBC section.