34 live11 closing this weekmost from Bangalore Metro Rail Corporation Limited
34 results • Latest
RAIL LUBRICATION SYSTEM
TRAIN CAB DOOR LIMIT SWITCH FOR CRRC TRAIN SETS
RAIL WEAR AND CMS NOSE WEAR GAUGE
PROCUREMENT OF TRAIN STICKERS
Procurement of Train Stickers for CRRC Train Sets
Rust Remover/Rust Penetrant/Penetrating Oils (Q3) (PACOnly)
KIRLOSKAR 180KVA ALUMINIUM RADIATOR
Work station PC, M365 Business standard, Laptop, All in one printer, M365 Business standard No teams, Teams Essentials
ZeroTrust Network Access, single sign on (sso), Multi Factor Authentication
Overhaul of On Load Tap Changers (OLTC) of Power Transformers
Assessment of Cables
UPS battery 65ah 12V SMF, UPS battery stand
Contract Package-P4-Partial and Full Demolition/Dismantling of Buildings/Structures identified from Hosahalli Station to Kadabagere Station (from Ch. -0.600Km to Ch.11.907 Km) excluding 1.64 Km (From Ch.4.620Km to 6.26Km) in Corridor-2 of BMRCL Ph-3.
Contract Package-P1- Partial and Full Demolition/Dismantling of Buildings/Structures identified from JP Nagar 4th Phase Station to Mysore Road Station (from Ch. (-) 0.330 Km to Ch. 10.550 Km) in Corridor-1 of Bangalore Metro Rail Project Phase-3.
Package-P2-Partial and Full Demolition/Dismantling of Buildings/Structures identified from Mysore Road Station to Kottigepalya Junction in Corridor-1, from Kottigepalya Junction to Sunkadakatte Depot entry/exit incl Sunkadakatte Station in Corridor-2
Contract Package-P3- Partial and Full Demolition/Dismantling of Buildings/Structures identified from Sumanahalli Station (Excl) to Kempapura Station (Excl) (from Ch. 17.695 Km to Ch. 30.866 Km) in Corridor-1of Bangalore Metro Rail Project Phase-3.
Periodical Painting, distempering, colour washing etc to CBPK and VDSA Metro station buildings of UG-2 Section
DIGITAL FORCE GAUGE - 200N, DIGITAL FORCE GAUGE - 500N
SINGLE CAVITY AUTO MOULD FOR TRAIN AIR COMPRESSOR
TRAIN CAB DOOR LIMIT SWITCH
Portable Hardness Tester, Portable Surface Roughness Tester
Construction of Check Post at entrance of the Airport Depot approach road and construction of Boundary Wall for BMRCL acquired land surrounded by private properties in Airport Line, Bangalore Metro Rail Project- Package-3/Phase-2B.
The brief scope of work under this tender is Shifting of BESCOM utilities at w-06, N-02, N-08 & N-06 Sub-Divisions which are infringing/ obstructing to construction of Viaduct and Metro Stations all along the ORR from PES College to Laggere Pipeline Road in Corridor-1 of BMRCL Phase-3 Project on Total Turnkey basis which includes Design, Engineering, Manufacturing, Testing, Supply on FOR Destination to Site basis, Transportation, Insurance, Storage, Handling and moving into the final position, Erection, Testing at Site and Commissioning including Civil works.
Replacing of Damaged cable trough cover slabs and Manufacturing, Supplying and Fixing of Precast RCC cable trough cover slabs at viaduct track level
PROVIDING HOUSEKEEPING SERVICES FOR DEPOT, STATIONS, VIADUCT, TRACK AND TRAINS OF Phase-2A OF BMRCL
Petty repair works
Providing Security & Allied Services for Stations, Viaduct, Tunnels, Track and Trains in Reach-6 Underground(UG) Sections of BMRCL
Providing Security & Allied Services for Depot, Stations, Viaduct, Tunnel, Track and Trains in Reach-3&3A and Underground Sections (UG1&UG2) of BMRCL
Providing Security & Allied Services for Stations, Viaduct, Track and Trains in Phase-2A Sections of BMRCL
TRACTION CABLE 185 SQ. MM
Construction of DoubleDecker structures of approx. 6.652 Km from Ch.11.734 Km to Ch.16.746 Km in C1 and from Ch.4.620 Km to Ch.6.260 Km in C2 and Stations.Vinayaka Layout,PapareddyPalya,BDA Complex Nagarbhavi in C1 at Sunkadakatte in C2 of BMRCL,Ph3.
Construction of DoubleDecker structures for a length of 6.521 Km excluding JP Nagar 4th Ph station from Ch-0.330 Km to Ch.6.326 Km and 4 Nos of Elevated Double Decker Metro Stations JP Nagar 5th Ph,JP Nagar,Kadirenahalli and Kamakya Jn. of BMRCL Ph3.
Construction of Double Decker structures for a length of 5.408 Km from Ch.6.326 Km to Ch.11.734 Km and 4 Nos of DoubleDecker Metro Stations, Hoskerehalli, Dwaraka Nagar, Mysore Road and Nagarbhavi Circle of BMRCL, Ph3.