Loading…
Loading…
582 results • Recent activity
Repairing and replacement of damaged vibrating screen unit No. 926-3 and under hopper Liner plates of unit No. 913-1 and 913-2 of PS-9 section of Madhuban Coal Washery under Block-II Area, BCCL.
Replacement and repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at unit no. 301 drive side belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area,
Repairing of overhauling of 10 Lathe Machine of Madhuban Coal Washery under Block-II Area, BCCL
Overhauling of Gear box unit no. 1402 in Loading section at Madhuban Coal Washery under Block-II Area, BCCL
Dismantling, Lifting, shifting and transportation of one no. of BD HT motor ar receiving Hopper and transportation, shifting, lowering and installation of repaired motor at the required place at Madhuban Coal Washery under Block-II Area, BCCL
Repairing, overhauling of 6.6 KV 1250 AMPS LOCB breaker and panel of PS-9 and PS-24 and overhauling 3.3 KV CT 15 nos. and P.T. 06 nos. in 33KV sub-station at Madhuban Coal Washery under Block-II Area, BCCL