Loading…
Loading…
172 results • Latest
electricalpurpose (V2) ISImarkedto IS7809 (Part3/Sec1) (Q2)
Foot Valves for Water Works Purpose as per IS 4038 (Latest) (Q3), Sluice Valve For Water Works Purposes (50 To 1200 Mm Size) (V2) As Per Is 14846 (Q3), Swing Check Type Reflux Valves for Water Works Purposes (Single Door Pattern) (V2) as per IS 5312 (Part1) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Internal Combustion Engine Crankcase Oilsfor Automotive Application (V2) Conformingto IS13656 (Q3)
Cast Iron Detachable Joints for use with Asbestos Cement Pressure Pipes as per IS 8794, IS 12987 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
modularelectricalenclosureswitchboardboxesformodular typeaccessories (Q3)
C-180 V-Belt: Classical C-section V-belt having a top width of 22 mm and height of 14 mm, with a nom, C-108 V-Belt: Classical C-section V-belt having a top width of 22 mm and height of 14 mm, C-136 V-Belt: Classical C- section V-belt having a top width of 22 mm and height of 14 mm, B-97 V-Belt: Classical B-section V-belt having a top width of 17 mm and height of 11 mm, with a nomi, C-105 V-Belt: Classical C-section V-belt having a top width of 22 mm and height of 14 mm, C-90 V- Belt: Classical C-section V-belt having a top width of 22 mm and height of 14 mm, SPA-2580 V-Belt: Narrow wedge SPA-section V-belt having a top width of 13 mm and Height of 10 mm, wi, SPA-1320 V-Belt: Narrow wedge SPA- section V-belt having a top width of 13 mm and height of 10 mm, SPA-5300 V-Belt: Narrow wedge SPA-section V-belt having a top width of 13 mm and height of 10 mm
Writing Pens (Q4), Black Lead Pencils (V3) Conforming to IS 1375 (Q4), Eraser (V2) (Q4), Manual Pencil Sharpener (V3) (Q4), Sketch Pens (V3) (Q4), Colour Pencil (V2) (Q4), Pressure Sensitive Adhesive Tapes with Plastic Base (V4) Conforming to IS 13262 (Q4), Graph Paper (V2) (Q4), Binder Clips (V3) Conforming to IS 8231 (Q4), Correspondence Envelopes (V3) Conforming to IS 13892 (Q4), Dak Pad (V3) (Q4), Electronic Calculator (V2) (Q4), Stationery Holder/Pen Stand(V3) (Q4), Correction Fluid Pen(V3) (Q4), Correction Tape (V2) (Q4), Glue Stick (V3) (Q4), Markers and Highlighters (Q4), Note Sheet Pad (Azure Laid) (V3) (Q4), Paper Clips (V2) Conforming to IS 5650 (Q4), Paper Punch Machine(V2) (Q4), Paper Weights (V2) (Q4), pin cushions (Q4), Paper Pins (V2) Conforming to IS 5653 (Q4), Drawing Pins (V3) as per IS 5205 (Q4), Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4), Metric Scale (V2) Conforming to IS 1480 (Q4), File/Folder (V3) (Q4), Tags For Files (V3) Conforming to IS 8499 (Q4), Stationery Scissors (V2) Conforming to IS 989 (Q4), Self Adhesive Flags (V3) (Q4), Desk Pads - Writing (V2) (Q4), Pads for Rubber Stamps (V2) Conforming to IS 4747 (Q4), Staple Pins/Staples(V3) (Q4), Staplers(V3) (Q4), Sticky Notes (V2) (Q4), Register (V2) (Q4), Paper Adhesives, Liquid Gum and Office Paste Type (V2) Conforming to IS 2257 (Q3) MSE Relaxation for Years of Experience and Turnover No
Pneumatic Tyres For Passenger Car Vehicles - Diagonal And Radial Ply Marked to IS 15633 (Q2), Pneumatic Tyres for Commercial Vehicles - Diagonal and Radial Ply Marked to IS 15636 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
CHLORINATED POLYVINYL CHLORIDE (CPVC) FITTINGS FOR POTABLE HOT AND COLD WATER DISTRIBUTION SUPPLIES Conforming to IS 17546 (Q3), Chlorinated Polyvinyl Chloride (CPVC) Pipes For Portable Hot and Cold Water Distribution Supplies (V3) conforming to IS 15778 (Q3), Commercial UPVC Fittings (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Water Fittings-Copper Alloy Float Valves (Horizontal Plunger Type) conformingto IS1703 (Q3)
Flexible Drain Hoses for Wash Basins/Sinks (Q3), Plastic Seats and Covers for Water - Closets as per IS 2548 (Q3), Stainless Steel Sinks for Domestic Purposes (V3) as per IS 13983 (Q2), Floor Drain Traps (V2) (Q3), Connector Pipes for Washbasins/Sinks/Geyser (Q3), Ceramic ( Vitreous China ) Flushing Cisterns for Water Closets and Urinals conforming to IS 774 (Q3), Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
CPVC Ball Valve (Q4), Running Nipples, Close Taper Nipples and Barrel Nipples confirming to IS 1239 (Part 2) (Q4), Elbows, Tees and Crosses, Equal confirming to IS 1239 (Part 2) (Q4), Pipe Unions confirming to IS 1239 (Part 2) (Q4), Pipe Clamps (V2) (Q4), Commercial PPR Pipes Fittings as per IS 15801 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Providing and Fixing 80 mm thick paver block along right side of NHC from Ganguwal Power House main gate to Charanganga escape and also providing 60 mm thick paver block in canal colony main link road to 41-DD at Ganguwal
Repair and replacement of RHR Gate no. 18.
REPAIR OF TOILETS IN RE OFFICE, STAFF TOILETS IN DPH CIRCLE OFFICE AND PANTRY IN DIVISION OFFICE AND CIRCLE OFFICE AT BBMB (PW), SLAPPER.
Air Break Contactors (Q3), Vacuum Contactor Conforming To IS/IEC 60470 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Sodium Silicateforusein Foundries (V2) Conformingto IS6773 (Q3)
Annual Maintenance service-AIR CONDITIONER
Elbows, Tees and Crosses, Equal confirming to IS 1239 (Part 2) (Q4), Steel Sockets confirming to IS 1239 (Part 2) (Q4), Socket Reducing confirming to IS 1239 (Part 2) (Q4), Pipe Unions confirming to IS 1239 (Part 2) (Q4), Plug confirming to IS 1239 (Part 2) (Q4), Soap Dish - Case (Q4), Running Nipples, Close Taper Nipples and Barrel Nipples confirming to IS 1239 (Part 2) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3), Cast Copper Alloy Screw Down Bib Taps and Stop Valves for Water Services conforming to IS 781 (Q3), (Vitreous China) - Washdown Water Closets as per IS 2556 (Q3), Wash Basins - Vitreous Sanitary Appliances (Vitreous China) conforming to IS 2556 (Part 4) (Q3), Bathroom or Toilet Mirror (V3) (Q4), Stainless Steel Sinks for Domestic Purposes (V3) as per IS 13983 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Revolving Chair (V5) (Q2), Executive Table (V4) (Q2), Computer Table (V3) (Q2), Modular Table/Meeting Table Centre Table (V2) (Q2), Wooden Shelf/Case/Rack Credenza/Modular Storage (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Renovation of 16 Nos. A-type quarters (C-Block) and 24 Nos. B-type quarters (A-Block) at Power House Colony at Ganguwal.
Renovation of AEE/SDO type kothi at Kotla Power House for providing chargeable base residential/support accommodation to M/s MACLEC in connection with Surface Hydro Kinetic Turbine (SHKT) Project.
For the work of strengthening/muffing of 220 kV Transmission Line Towers located at Dadri, Badarpur, Samaypur under SDO, TL, BBMB, Ballabgarh.
Clearance of drains and wild growth along the railway track from Nangal to Bhakra
Renovation of Gobind Vatika in Rose Garden at Bhakra Dam
Cast Copper Alloy Screw Down Bib Taps and Stop Valves for Water Services conforming to IS 781 (Q3), PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763 (Q3), Malleable Cast Iron Pipe Fittings (V2) as per IS 1879 (Q2), Health Faucet (Q3), Wash Basins - Vitreous Sanitary Appliances (Vitreous China) conforming to IS 2556 (Part 4) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Weightand High Cranking Performance (V2) Conformingto IS14257 (Q3)
Providing adequate ground clearance between Span No 164
Aluminium Paint for General Purposes in Dual Container as per IS 2339 (Q3), Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
GUM SPIRIT OF TURPENTINE (OILOFTURPENTINE) conformingto IS533 (Q3)
Renovation of 2 nos. rooms of field hostel at BBMB colony, Slapper
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Crane; Telescopic Crane, Mobile Crane, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Earth Moving Equipment; JCB, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Tractor; Tractor, Tractor with Disc Harrow, Tractor with Rotavator, Tractor with Plough, Tractor with Cultivator
GUM SPIRIT OF TURPENTINE (OIL OF TURPENTINE) conforming to IS 533 (Q3), Flat Brushes for Paints and Varnishes for Heavy Duty (V2) conforming to IS 384 (Part 1) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No