Loading…
Loading…
178 results • Latest
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Crane; Telescopic Crane, Mobile Crane, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Earth Moving Equipment; JCB, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Tractor; Tractor, Tractor with Disc Harrow, Tractor with Rotavator, Tractor with Plough, Tractor with Cultivator
GUM SPIRIT OF TURPENTINE (OIL OF TURPENTINE) conforming to IS 533 (Q3), Flat Brushes for Paints and Varnishes for Heavy Duty (V2) conforming to IS 384 (Part 1) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
GUM SPIRIT OF TURPENTINE (OILOFTURPENTINE) conformingto IS533 (Q3)
Water and Oil resistant rubber cup seals suitable for brake jacks of 157 MW Hydro Generators
electricalpurpose (V2) ISImarkedto IS7809 (Part3/Sec1) (Q2)
HRC (High Rupturing Capacity) Fuse Conforming to IS/IEC 60269 (Part 2) (Q3), Electrical Cable Lugs (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Aluminium Paint for General Purposes in Dual Container as per IS 2339 (Q3), Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
NIT FOR REPLACEMENT OF DAMAGED DOORS AND ELECTRICAL FITTING ALONG WITH CONSTRUCTION OF WALLS FOR AIR BLOWERS ROOM AT 0.5 MGD WATER TREATMENT PLANT AT BBMB SLAPPER.
Fire Protection System viz Fire Stop Sealing System, Fire Resistant Doors and Mortar Fire Barrier
Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2), Miniature Circuit Breaker Boards for Voltages Conforming To IS 13032 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
CONSTRUCTION OF RAMP FOR CWSN STUDENTS AT BBMB DAV PUBLIC SCHOOL TALWARA
Upgradation and Modernization of critical infrastructure work at Hydro Power Training Centre Nangal Punjab
Renovation the Shed of Fire station BBMB at Beas Dam Site
Ordinary Portland Cement (V3) Confirming to IS 269 (Q3)
Submersible Pumpsets (Three Phase) Conforming To IS 8034 (V2) (Q2), Submersible Pump Starters (Motor starter controls) (Q3)
Pillar Taps for Water Supply Purpose conforming to IS 1795 (Q3), Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3), Connector Pipes for Washbasins/Sinks/Geyser (Q3), Health Faucet (Q3), Unplsticized PVC Pipes for Water Supply conforming to IS 4985 (Q3), Solvent cement for use with unplasticized polyvinylchloride plastic pipe and fittings conforming to IS 14182 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Wash Basins - Vitreous Sanitary Appliances (Vitreous China) conforming to IS 2556 (Part 4) (Q3), Stainless Steel Sinks for Domestic Purposes (V3) as per IS 13983 (Q2), Pipe Clamps (V2) (Q4), Ceramic ( Vitreous China ) Flushing Cisterns for Water Closets and Urinals conforming to IS 774 (Q3), Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3), Plastic Seats and Covers for Water - Closets as per IS 2548 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Convection Heaters - Room Heater, Blower (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Vitreous China Sanitary Appliances – Squatting Pans conforming to IS 2556 (Part 3) (Q3), Unplsticized PVC Pipes for Water Supply conforming to IS 4985 (Q3), (Vitreous China) - Washdown Water Closets as per IS 2556 (Q3)
Wash Basins - Vitreous Sanitary Appliances (Vitreous China) conforming to IS 2556 (Part 4) (Q3), Bathroom or Toilet Mirror (V3) (Q4), Health Faucet (Q3)
Internal Combustion Engine Crankcase Oilsfor Automotive Application (V2) Conformingto IS13656 (Q3)
Dismantle and reconstruct boundary wall including barbed wire fencing along with pole mounted LED lights and steel gates in Shakti Sadan Rest House at Nangal for security purpose.
Mobile Containers For Solid Waste Conformingto IS12402 (Q3)
Electro Chlorination System for Disinfecting drinking water
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Hydraulic Excavator with Driver, Tractor with Trolley, Crane; Hydraulic Excavator with Driver, Crane
Capital Maintenance of Unit No. 1 and Repair of underwater parts for 2 units at Dehar Power House, Slapper through OEM
Executive Table (V4) (Q2), Revolving Chair (V5) (Q2), Chair for General Purpose (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Microwave Ovens For Household And Similar Purposes As Per Is 11676 (V2) (Q2), Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years of Experience and Turnover No
Aluminium Paint for General Purposes in Dual Container as per IS 2339 (Q3), Epoxy Based Zinc Phosphate Primer (two- pack) as per IS 13238 (Q3), Thinner For Epoxy Paints (BHEL) (Q3), Ready Mixed Paint, Brushing, Bituminous, Black, Lead Free, Acid, Alkali and Heat Resisting as per IS 158 (Q3), Air Drying, Red Oxide Zinc Chrome, Priming (V2) as per IS 2074 (Q3), THINNER FOR CELLULOSE NITRATE BASED PAINTS AND LACQUERS (Q3), Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3), GUM SPIRIT OF TURPENTINE (OIL OF TURPENTINE) conforming to IS 533 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) ( ( 3 3 ))
PVC Insulated Copper Cable Single Core and Multi Core Circular Sheathed with Flexible Conductor (V2) ISI Marked To IS 694 (Q2), PVC Insulated Copper Cable Single Core and Multi Core Circular Sheathed with Rigid Conductor (V2) ISI Marked To IS 694 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Construction of cross drain along with sump at Kosri camp at Bhakra Dam
Chlorinated Polyvinyl Chloride (CPVC) Pipes For Portable Hot and Cold Water Distribution Supplies (V3) conforming to IS 15778 (Q3), Flexible Drain Hoses for Wash Basins/Sinks (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Stainless Steel Sinks for Domestic Purposes (V3) as per IS 13983 (Q2), Lock Stoppers as per IS 1223 (Q3), M - Seal as per IS 9197 (Q3), Cyanoacrylate Adhesive (Q3), EPDM Rubber Beading For Passenger Door (Q3), Self Drilling Screw (Q3), Wood screws (Q3), Tower Bolts (Non-Ferrous Metals) V2 as per IS 204 (Q2), Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3), PVC gitti (Q3) ( ( 3 3 ))
Computer Mouse (Q2), Computer Keyboards (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair of Physics, chemistry, bio-lab at BBMB DAV Public school Nangal.
Replacement of 4 Nos. steel wire rope 34 mm dia of floating deck No. I and II and 4 Nos. steel wire ropes 20 mm dia of 4 Nos. Inclined carriage way trollies at Timber rope way section at Bhakra Dam
Antimicrobial Hand Wash (V2) (Q2), Water Jugs (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
cobweb brush (Q3), Scouring Products for Utensil Cleaning- Dishwash (V3) Conforming to IS 6047 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Plywood for General Purposes Marked to IS 303 (V3) (Q2), Steel Countersunk Head Wire Nails Conforming To IS 723 (Q3), Plastic Seats and Covers for Water - Closets as per IS 2548 (Q3), PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763 (Q3) ( ( 3 3 ))
Replacement of damaged door and window alongwith other items in office building and Mtc. of Rest House at 220 KV sub-station, BBMB, Narela
Antimicrobial Hand Wash (V2) (Q2), Toilet Soap Conforming to IS 2888 (V3) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LED Batten Light (LED Tube Light) (V2) (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)