Loading…
Loading…
863 results • Latest
Alloy Steel Plate (Q4), Two Way Valve (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
AC Static Watthour Meters - Energy Meter (V2) as per IS 13779 (Q2) ( ( 3 3 ))
Disinfectant Fluids, Phenolic Type (V5) conforming to IS 1061 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair of Common roof drain in S-3 type residential houses in BBMB Colony, Sundernagar
Refurbishment and Preventive Maintenance of old Furniture at BBMB Rest House Suket Sadan and Field hostel at BSL(P), BBMB Sundernagar
Removal and Clearance of weed growth, shrubs, jungle bushes etc. along BCW complex area at Baggi in BSL Project Sundernagar.
Pneumatic Tyres for Commercial Vehicles - Diagonal and Radial Ply Marked to IS 15636 (Q2) ( ( 3 3 ))
Providing 0.5 MLD Sewerage Treatment Plant with construction and replacement of main sewer line and manholes including operation and maintenance of the STP for 5 years at Kotla.
Sweeping Broom (V5) (Q4), Disinfectant Fluids, Phenolic Type (V5) conforming to IS 1061 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Carbon Sealing Rings of Turbine Shaft Gland System on Proprietary basis from M/s Assam Carbon P Ltd.
Paper-based Printing Services - Printing with Material; As per scope of work; As per scope of work
Glyphosate41% SL (Soluble Liquid) (IPASalt) (Q2)
Electric Ceiling Fan (V4) ISIMarkedto IS374 (Q2)
Consumables items for Rest House
KHADI DUSTER SIZE 68 X 68 CM & 150 GSM
Silica Gel Breather (V2) (Q3)
Television (V3) (Q2)
Cummins Engine Spares
Elbow, Equal, 135 Degrees conforming to IS 1239 (Part 2) (Q4) Steel Sockets confirming to IS 1239 (Part 2) (Q4), Running Nipples, Close Taper Nipples and Barrel Nipples confirming to IS 1239 (Part 2) (Q4), Nipples, Hexagon, Equal confirming to IS 1239 (Part 2) (Q4), Elbows, Tees and Crosses, Socket Reducing confirming to IS 1239 (Part 2) (Q4), Socket Unions confirming to IS 1239 (Part 2) (Q4), Plug confirming to IS 1239 (Part 2) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Coke-Blast Furnace (RINL) (In Metrictonne) (Q3)
Flat Brushes for Paints and Varnishes for Heavy Duty (V2) conforming to IS 384 (Part 1) (Q4), Nitrile Coated/Nitrile Hand Gloves (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6998569 Dated : 13-12-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Nitrile Coated/Nitrile Hand Gloves (V2) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3), Flat Brushes for Paints and Varnishes for Heavy Duty (V2) conforming to IS 384 (Part 1) (Q4), GUM SPIRIT OF TURPENTINE (OIL OF TURPENTINE) conforming to IS 533 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Platform Step Ladder (V2) (Q3)
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
High Pressure Washer (Q3)
Renovation of BBMB Dispensary at Ganguwal.
Single integral unit respiratory fiilter full face mask, Nitrile coated hand gloves, PPE Kit for sewerman, Safety helmet with rechargeable LED head lamp, Nylon rope ladder, Safety belts, Search light
Technical Grade Sulfur Hexafluoride (SF 6) for use in Electrical Equipment as per IS 13072 (Q3)
Studwith Nuts (Q3)
Stainless Steel Shelf Rack (Q3), Modular Table/Meeting Table/Centre Table (V2) (Q2), Chair for General Purpose (Q2)
Painting anti corrosive CA-50 paint of left out trash rack gates at Ganguwal and Kotla along with 3 Nos penstock at Kotla.
Providing Fencing and Renovation of Building of Research Labortary (Near Jawalaji) at Beas Dam site
Internal Combustion Engine Crankcase Oils for Automotive Application (V2) Conforming to IS 13656 (Q3), Gear Lubricants, Multipurpose (?Extreme?Pressure?Gear?Oil?) (V3) Conforming to IS 1118 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Augmentation of existing 05 nos. protection walls for safety of 04 nos. 100 MVA, 220/66-33 kV T/F at 220 kV sub station, BBMB, Delhi by dismantling existing old brick walls and providing new RCC walls
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2), LED Batten Light (LED Tube Light) (V2) (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Dungarees (Q4), High Visability Reflective Vest (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Industrial Safety Glove/Gauntlet (V2) (Q3)
Graphite Gun Metal Bush with Size as follows (Outer Diameter= 78mm Inner diameter= 45mm and Length
Bathing Soap Bar (V3) Conformingto IS13498 (Q4)
Providing Bullet Proof cabin/sentry guard cabin at various sites of Bhakra Dam
A3 Size Multifunction Printer (MFP) (Q2)
Silica Gel (V2) Conforming to IS 3401 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Distribution Transformer, 3 Phase, upto and Including 200 KVA ISI Marked To IS 1180 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Stationary Lead Acid Batteries (with Tubular Positive Plates) in Monobloc Container (V2) Conforming To IS 13369 (Q3), Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2) ( ( 3 3 ))
Hot Rolled Steel Beam, Column, Channel and Angle Sections (V2) conforming to IS 808 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Desilting of Dehar Khad in district Kangra Himachal Pradesh of Pong Dam Reservoir area
Gun Metal Gate Valves - BHEL (Q3), Sluice Valve For Water Works Purposes (50 To 1200 Mm Size) (V2) As Per Is 14846 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No