Erection of a separate 3.3KV O/H line from F.A.W. substation to N.D. Patch for the purpose of providing uninterrupted power supply in the mine at Damoda Colliery under Barora Area.
Repairing and maintenance of 11KV O/H Line due to smooth power supply of Minop UG mine Under Muraidih AMP Colliery, Barora Area.
Township maintenance of 440V O/H line of Sahana workers colony by replacement of damaged poles and conductor and other miscellaneous electrical works for safe and uninterrupted operation of domestic power supply at Phularitand, AMP Colliery.
Maintenance of LT overhead line of 3 No CISF camp substation of Muraidih Colony AMP Colliery of Barora Area.
Shifting and installation of MN-6 pump motor set of Madhuban Incline in upper and safe side of the Incline 04times due to continuously water level increasing at Phularitand, AMP Colliery, Barora Area.
Transporting of 150nos. 8inch dia MS pipes from Muraidih W/S to SOCP attendance room premises and fabrication of 300nos. flange along with fabrication of 8inch dia MS bend, MS taper pipe and MS short piece for erection of pipe line under AMPC.