| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 LAccepted-AOC PANCHAYAT SIJUA PAN THANA DUGDA BOKARO BOKARO 828307 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828307 | ₹2.0 L | L-1 | Accepted-AOC L1 |
| 2 | L-2₹2.1 L+₹9,150.57 (4.50%)Rejected-Finance DUGDA BOKARO | ₹2.1 L+₹9,150.57 (4.50%) | L-2 | Rejected-Finance Reject L-2 Bidder |
| 3 | L-3₹2.2 L+₹12,709.12 (6.25%)Rejected-Finance MADHUBAN PO NADKHURKEE PS MADHUBAN DHANBAD DHANBAD 828307 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828307 | ₹2.2 L+₹12,709.12 (6.25%) | L-3 | Rejected-Finance Reject L-3 Bidder |
Tender Value
Refer Docs
EMD Value
₹2,600
Closing Date
18 May 2026, 6:30 pmClosed
AREA MANAGER (ENM), BARORA AREA
ENM Department, Office of the General Manager, Barora Area, Nawagarh, Dhanbad
Erection of a separate 3.3KV O/H line from F.A.W. substation to N.D. Patch for the purpose of providing uninterrupted power supply in the mine at Damoda Colliery under Barora Area.
2026_BCCL_359154_1
BCCL/GM/AR-1/AM (ENM)/E-TENDER/2026-27/014
Open Tender
Electrical and Maintenance Works
Percentage
10 days
DAMODA COLLIERY, BARORA AREA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,600
21 Aug 2026
6 May 2026
19 May 2026
6 May 2026
18 May 2026
6 May 2026
6 May 2026 - 9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling & transporting of Idle Rail pole in safe place | 12 | No | 1,160 | ₹13,920 |
| 2 | Dismantling & transporting of Idle Pipe pole in safe place | 5 | No | 940 | ₹4,700 |
| 3 | Dismantling of Idle 3.3KV O/H line (13SpanX60MtrX3wire=2340 Mtr) | 2,340 | Mtr | 4 | ₹9,360 |
| 4 | Dismantling of Disc/pin insulator | 51 | No | 100 | ₹5,100 |
| 5 | Dismantling of iron materials | 570 | Kg | 20 | ₹11,400 |
| 6 | Transporting and Erection of Rail pole | 12 | No | 1,160 | ₹13,920 |
| 7 | Transporting and Erection of Pipe pole | 5 | No | 940 | ₹4,700 |
| 8 | Fabrication of iron materials | 570 | Kg | 20 | ₹11,400 |
| 9 | Providing and Erection of stay Rod | 23 | No | 1,200 | ₹27,600 |
| 10 | Fitting of Disc/pin insulator | 54 | No | 100 | ₹5,400 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.47 MB
BOQ_372019.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .