Loading…
Loading…
5,147 results • Latest
Unbranded Calcium + Vitamin D3 500 Mg 500 mg Tablet
Unbranded Diclofenac Gel 30 gm Ointment, Unbranded Diclofenac Gel 30 gm Ointment Ointment
Repair and changing of damaged false ceiling of ERP office Koyla Nagar
3M Non Rigid - Straight Joint - Cold Shrink Cable Joint Kit For 3 Core, 3M Non Rigid - Straight Joint - Cold Shrink Cable Joint Kit For 3 Core Cable
Repair and Maintenanceof Dr B.R Ambedkar Platform and shed at Bye Quarter Gourkhutti Bhowra under EJ Area
Towards extension of 6.6KV(feeder no.50)grade overhead lines 5 pit substation to works(ASBNC),Loyabad colliery to provide 6.6KV power to workshop for testing of Motors,Breakers and Starters after repairing used for different colliery under Sijua Area
New making of two Nos. of plumber block through casting and machining for crusher roll of feeder breaker, AMP Colliery.
Complete repairing of rotating unit of 10UPH8, 4000GPM pump no 1 under Muraidih, AMP Colliery, Barora Area.
Repairing of 6inch dia domestic water supply pipe range from Karmatand to Ramgarh Jhariya coloney and 02times shifting of 1000GPM pump, motor set in lower side of the sump due to decreasing of water level of Albion OCP sump at Damoda Colliery.
Repairing of two nos of damaged rest shelter and one base frame for 4000GPM pump motor sets at AMP Colliery.
Extension of 3.3KV O/H line for feeding power and smooth running of pump for dewatering of mine water and domestic water supply at main patch at Phularitand, AMP Colliery
Different type pumping and pipeline works i.e.replacing B/D 4000GPM Pump, bearing changing, fabrication of bends, tapper pipes, extension of pipe, modification of baseplate and leakage repairing in different location of Phularitand, AMP Colliery.
Diversion of 6.6 KV O/H line due to OB Dumping in Jarlahi face to feeding power of 4000 GPM Motor pump and repairing, maintenance in SOCP Substation under Muraidih AMP colliery.
Changing of damage poles and conductor and dismantling of idle O/H line in 440V O/H line to feeding domestic power to Barora Basti and Mandal Kenduadih for safe and uninterrupted operation of power supply under SOCP patch at Muraidih, AMP Colliery.
Dismantling and erection of 440V overhead line for repairing and maintenance in Budora Mandra and Kewda Basti in Phularitand under AMP Colliery.
Maintenance of chemical earthpit through repairing,overhauling and filling of required chemical materials in Muraidih colony substation and Muraidih Office substation of AMP Colliery of Barora Area.
Repairing of 4inch dia sluice valve and maintenance of DSM-3 pump and erection of PVC pipe line from Nadi Kinare to CISF Checkpost of Muraidih of AMPC of Barora Area.
Repairing of AB switches horn gap lighting Arrester and other works of overhead line of 500 KVA, 11KV/440V Transformer in Muraidih, AMP Colliery.
(A)Dismantling and Erection of L.T220V O/H line in raper face and jarlahi face for lighting purpose (B)Extension of 6.6KV O/H line in Jarlahi face to feeding power of 4000GPM motor pump and idle O/H line dismantling near Deco in SOCP Muraidih,AMPC.
New making of 06 Nos. of plumber block to be used in tail end drum and loop-take-up drums of conveyor belt system of AMPC of Barora Area.
Dismantling of idle 6.6KV O/H line in Jharna face and diversion of 6.6KV O/H line F.No.3 feeding power to 4000GPM pump motor set due to advancement of OB face at Muraidih, AMP Colliery.
Transporting and installation of HT 2000GPM Pump, motor set at old Ghutway patch-3 and 02times shifting of HT2000GPM pump, motor set in the lower side of the sump and other misc.pumping and pipe line works at Old Ghutway Patch-3 of Damoda Colliery.
(A) Dismantling of Idle 11KV O/H line from 8 pole to Bokaro Jhariya for gainfully utilization of materials and safety purpose (B) diversion of 3.3 KV O/H line in mine periphery due to mining activity at old Ghutway Patch-3A at Damoda Colliery.
Extension of delivery of two 3000GPM pump installed on the pontoon at Main patch sump due to gradual decreasing of water level and maintenance of above pump for smooth operation at Phularitand, AMP Colliery.
Shortening of delivery of two 4000GPM pump sl.no.6 and 7 installed on the pontoon of Jarlahi sump due to increasing of water level and necessary maintenance of above pumps for smooth operation at Phularitand, AMP Colliery.
Repairing and maintenance of 11KV and 6.6KV O/H line from Muraidih substation to Minop circuit and Jharna circuit under AMP Colliery Barora Area.
Diversion of 11KV O/H line, Feeder No. 4 near Jamunia Shiv Mandir for safety purpose under Damoda Colliery.
Repair and Maintenance of New D type Qtrs No D 5 at Koyla Nagar under Bastacolla Area
Denting, painting, remolding and repairing of cabin of HYVA Water Tanker No.- JH10AH 5725 running under Area Auto workshop, Govindpur Area.
Repairing of Propeller Shaft Assembly 01 set Rear Hub Assembly and Air Dryer of HYVA Water Tanker No. JH 10-AH-5725 running under Area Auto workshop, Govindpur Area III.
Antiwear Hydraulic Oil, Extra Heavy Duty Type (V3) Conforming to IS 11656 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Antiwear Hydraulic Oil, Extra Heavy Duty Type (V3) Conforming to IS 11656 (Q2)
Antiwear Hydraulic Oil, Extra Heavy Duty Type (V3) Conforming to IS 11656 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Antiwear Hydraulic Oil, Extra Heavy Duty Type (V3) Conforming to IS 11656 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Power supply arrangement for Cameras, Poles, Towers, and Portable Cabin installations under ICCC Phase-II.
VOLT METER SF 0 TO 3.3 KV, CT 200 OR 100 OR 5 11 BY 3.3 KV MOLDED, NEGATIVE SEQUENCE RELAY NEX 202 H, DIGITAL EARTH LEAKAGE RELAY 3.3KV 0 TO 750 MA, BRKR CRCT MCCB 800A 415V 4P 3P W BY ENCLS
VCB CLOSING COIL, TIMER 0.5 TO 10SEC 220VDC ON DLY, SLING WEB 4M 10TON POLYSTR EYE, DETECTION LOW VLTG NON CONTACT 30 BY 600V, FLOODLGHT ELEC LOW BEAM SONT 250V 250W
Renovation of siding office situated at bansjora railway siding under Sijua Area
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Strengthening and concreting work at diverted trench of Bagdigi jore, New Akash Kinaree Colliery under Govindpur Area-III
Repair and Maintenance of Quarter No H/5 at Kandra Staff Colony under EJ Area
Mechanical Repairing/ Restrengthening of Head and Snub Drums of Conveyor unit 403-A at Moonidih Coal Washery.
Comprehensive Gearbox Repairing/ Re-strengthening and Precision Realignment, encompassing chute restoration and gear box base frame work for unit 103-B Reclaimer Trolley (ROM) at Moonidih Coal Washery.
Fabracation and Installation of 02 nos. of feed chute for unit 903 belt conveyor after dismantling of existing worn-out feed chutes at Moonidih Coal Washery.
Mechanical Repairing/ Restrengthening of Head, snub and take-up drums of Conveyor unit-105 at Moonidih Coal Washery.
Gearbox Repairing/ Restrengthening and Precision Realignment for conveyor belt system, unit 801-B and unit C-2 at Moonidih Coal Washery.
Repairing/ Strengthening and replacement of damaged structural members, platform, railings etc of Junction house of unit 502,504,, NS-1 and NS-2 from Safety point of view at Moonidih Coal Washery.
Mechanical Repair and Reconditioning of 3 nos. Cable Reeling Drum Assemblies for Reclaimers unit 103-A, 103-B and 404-A at Moonidih Coal Washery.
Repairing of Discharge launder of Screen unit 604-1, 604-2, 604-3 and 604-4 at 29M level of washery building at Moonidih Coal Washery.
Repairing/ Re-strengthening of Load Body of TATA Hyva Reg. No. JH10AJ-2513 and JH10AE-2367 at Moonidih Coal Washery.