Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.9 LAccepted-AOC MADHUBAND NEW COLONY PO NUDHKHURKEE DHANBAD DHANBAD DHANBAD 828306 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828306 | ₹1.9 L | L-1 | Accepted-AOC L1 |
| 2 | L-2₹1.9 L+₹6,705.36 (3.60%)Rejected-Finance AT HARINA GOMOH ROAD POST NAWAGARH DHANBAD DHANBAD 828306 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828306 | ₹1.9 L+₹6,705.36 (3.60%) | L-2 | Rejected-Finance Reject L-2 Bidder |
| 3 | L-3₹2.0 L+₹10,151.17 (5.45%)Rejected-Finance 0 BHIMKANALI KHANUDIH BAGHMARA DHANBAD JHARKHAND 828306 | DHANBAD | JHARKHAND | 828306 | ₹2.0 L+₹10,151.17 (5.45%) | L-3 | Rejected-Finance Reject L-3 Bidder |
Tender Value
Refer Docs
EMD Value
₹2,400
Closing Date
6 Mar 2026, 6:30 pmClosed
AREA MANAGER (ENM), BARORA AREA
ENM Department, Office of the General Manager, Barora Area, Nawagarh, Dhanbad
Different type pumping and pipeline works i.e.replacing B/D 4000GPM Pump, bearing changing, fabrication of bends, tapper pipes, extension of pipe, modification of baseplate and leakage repairing in different location of Phularitand, AMP Colliery.
2026_BCCL_354216_1
BCCL/GM/AR-1/AM (ENM)/E-TENDER/2025-26/395
Open Tender
Electrical and Maintenance Works
Percentage
10 days
AMP COLLIERY, BARORA AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,400
19 Jun 2026
23 Feb 2026
7 Mar 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
23 Feb 2026 - 26 Feb 2026
Dismantling & withdrawal of B/D 4000GPM Pump with electricals
Transporting of B/D 4000GPM Pump with electricals from face sump to SOCP premises for repairing
Assembling of two another 4000GPM Pump i.e. fitting of rotating shaft, impeller, checknut, long bush, bearing & housing including greasing & packing of the pump
Transporting of assembled 4000GPM Pump with electricals from SOCP to pumping face & installation of the pump with proper allignment
Dismantling, transporting and fitting of suction & delivery for replacing of Pump
Changing of bearing 6218 both side of 4000GPM Pump through providing & fitting 2times 2x2x2=08Nos.
Modification of 02Nos. of baseplate by cutting & welding of channels & making necessary holes for fitting of 6.6KV/3.3KV motor on the baseplate
Erection of tanker filling point
Fabrication of 10"dia M.S.Taper pipe
Fabrication of 10"dia M.S.Bend
Fabrication of 8"dia M.S.Bend
Fabrication of 8"dia M.S.Taper pipe
Extension of suction pipe of 03nos. pump i.e. dismantling, transporting & fitting of 10"dia M.S. bend, 10"dia M.S. Pipe & 10"dia footvalve 02+02+02=06times
Leakage repairing in 10"dia M.S.Pipe line in different location of mine by dismantling of damaged pipes, welding of damaged portion of the pipe & flange and refitting the pipes in 05 places
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.47 MB
BOQ_367031.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .