Loading…
Loading…
5,408 results • Recent activity
Repairing/ Strengthening and replacement of discharge chute and base frame of its tail drum for Unit 901 at Moonidih Coal Washery.
Re-fabrication and Installation of Cable tray at 32 Mtr. Floor of Washery building (150 mtr. Length) at Moonidih Coal Washery.
Dismantling, Repairing and Replacement of Bearing and intermediate pinion of gear box (Model GS-100) installed at drive end along with alignment of drive drum of unit 801-A and C-1 conveyor belt at Moonidih Coal Washery.
Repairing/ Strengthening of walkway, Platform for both walkway and non-walkway sides of unit 801-A conveyor belt up to 75 Mtr. Length from head end at Moonidih Coal Washery.
Repairing of 90 Lb rail ramp for the purpose of Washed power coal loading in wagons by payloader/ Shovel of Moonidih Coal Washery.
Repairing of head drum and 1 no. of snub drum Assembly after dismantling of existing worn-out drums for unit 901 belt conveyor and refitting of all its accessories at Moonidih Coal Washery