Loading…
Loading…
5,403 results • Recent activity
10UPH8 200 Mtr head pump and MNP pump shifting work at dragline Purba Coal face patch with delivery diversion as per new location under ABOCP Mine, Block-II Area
Shifting of 4000 GPM (10UPHT) and 6000 GPM (10UPH6) pumps with diversion and tension of delivery pipeline range new location at Deco patch ABOCP Mine under Block-II Area
Shifting of installation of 4000GPM and 2000 GPM pump at 1T coal face ABOCP mine Block-II Area
Repairing of 3200 GPM 02 Nos pump set along with delivery for JOCP patch water de-watering of ABOCP Mine under Block-II Area
Repair and maintenance work after dismantling of gear boxes installed at Drive drum of unit 801-B and C-2 conveyor belts under section-V at Moonidih Coal Washery.
Repairing of boards along with Painting of Safety slogans and re-fixing of the safety boards at different locations of washery premises of Moonidih Coal Washery.