Loading…
Loading…
11 results • Latest
Part-A) Repair and maintenance of type-V quarters, ORH and Narmada club at Habibganj under ADEN(Works)Bhopal. Part-B) Repair and maintenance of Type- I,II,III and IV quarters at shakti nagar railway colony Habibganj under ADEN(Works)Bhopal.
Construction of Drain at RKMP, Bhopal & Nishatpura in connection with Yard Improvement and Up-gradation work under ADEN(W)Bhopal.
Part - (A) Execution of Turnout Sleeper Renewal (TTR(TSR)-21 sets), and Renewal of Turnouts (TTR(FS+TWR+CMS)05 sets) under the DEN/N/BPL section. Part-(B) Execution of TRR(P), TFR, De-stressing work, and other track-related works in ADEN/BINA & ADEN/GUNA section under the jurisdiction of DEN/N/BPL section. Part-C) BPL-BINA & BINA-MDVK Section-Provision of asphalting and repairing of existing Road surface at level crossings, etc and other ancillary works at Level Crossing No-003, 297, 300, 301, 302 and 305 under ADEN BINA.(TRACK WORK)
Construction of Signalling Buildings with PREFAB/PRECAST Elements in connection with "Interlocking of LC gate no. 146, 131 and 136 along with associated signalling and telecom work in Ruthiyai - Maksi section over Bhopal division."
Bhopal Division: Provision of FOB at 5 Nos. NSG 6 stations (PAL, CRK, PGL, DKI & DRA) in ET-KNW section.
Itarsi- Widening and Improving the Approach Road to Itarsi Station including Provision of Pathways, Kerb & Side Drain towards PF-7.
Itarsi - Supply of drinking water (Potable) in required quantity as and when and where required in Itarsi Railway station, Passenger yard and New Yard Colonies for Two year under ADEN (W) ET
Bhopal Division: Through Weld Renewal (Total length 57.45 kMS) BET-BINA-MDVK UP/Mid/DN Main Lines and Loop Lines /Sidings under the jurisdiction of DEN/North/Bhopal.
Cess Repair & widening work in Ruthiyai-Maksi Section and Construction of Open Drain along the track in Ruthiyai - Maksi Section At Km 1118/1-1119/4, 1120/11- 1121/1, 1130/6-1131/4, 1142/7-1143/3, 1146/1-1146/8 1149/3-1149/6, 1152/9- 1153/2, 1162/14-1153/5, 1168/03-1168/15, 1175/3-9, 1200/5-17, 1246/90- 1247/300, 1247/100-300, 1216/500-1217/100, 1218/250-500, 1273/600-1274/250, 1278/220-1278/780, 1280/265-1280/575, 1295/0-1295/450, 1301/800-1302/300 under ADEN/M/Shajapur.
Guna -Gwalior section:(A)Provision of surface side drain to prevent entry of surface Rain water into LHS-03, LHS-10, LHS-16, LHS-23.(B) Raising of existing LHS Wall height at LHS-14 & LHS-16.(C) Provision of grouting,joints sealing & Strengthning of LHS wall joints at LHS-33, LHS-56, LHS-57.
Bhopal Division -Works Zone for supply of material for the year 2025-26 under the jurisdiction of SSE/Works/Bhopal and SSE/Works/Habibganj under ADEN/Works/Bhopal (as per USSOR 2011).