INSTALLATION OF LIFT AT CG RESIDENCE OF CHANCERY-CUM-RESIDENTIAL COMPLEX OF CGI AT PHUENTSHOLING, UNDER 60 RCC / 19 BRTF OF PROJECT DANTAK INSIDE BHUTAN
504 SS TC SAMDRUP JONKHAR PHUENTSHOLING | Armed Forces (APS)·14d agoPublished 28 Aug 2026
SUPPLY OF VARIOUS SIZES OF TYRE TUBE FROM THE ORIGINAL MANUFACTURER PART I AND PART II DELIVERED AT DETT A OF 504 SS TC SAMDRUP JONKHAR AND VARIOUS TYPE OF BATTERIES FROM ORIGINAL MANUFACTURER FOR PART III DELIVERED AT 504 SS TC PHUENTSHOLING BHUTAN
64 RCC HMP loc at Km 54.1 Samrang-Jomotsangkha | Armed Forces (APS)·14d agoPublished 28 Aug 2026
SUPPLY AND STACKING OF STONE AGGREGATE OF SIZE 26.50 MM, 13.20 MM, 11.20 MM, 6.70 MM AND COARSE SAND/ STONE DUST AT HMP LOCATION KM 54.100 ON SAMRANG -JOMOTSANGKHA ROAD FOR SURFACING WORK UNDER 64 RCC/19 BRTF ROAD SECTOR OF PROJECT DANTAK BHUTAN
BETWEEN KM 24.00 TO KM 61.59 ON NGANGLAM-DEWATHANG | Armed Forces (APS)·18d agoPublished 24 Aug 2026
EXE OF SURFACING WORKS FROM KM 24.00 TO KM 43.70 AND KM 43.70 TO KM 61.590 INCLUDING PROVIDING LAYING OF WMM 2 LAYERS DBM 60 MM BC ON NGANGLAM DEOTHANG ROAD BHUTAN
AT KM 40.160 ON NGANGLAM-DEWATHANG | Armed Forces (APS)·23d agoPublished 19 Aug 2026
DESIGN AND CONSTRUCTION OF 60 MTR SPAN PSC BOX GIRDER BRIDGE OVER KHALATSHO RIVER AT KM 40.160 ON NGANGLAM - DEWATHANG ROAD UNDER 63 RCC/ 19 BRTF/ CE (P) DANTAK IN EASTERN BHUTAN