Loading
Loading…
Loading…
23 results • Latest
Civil Renovation works and outside painting to the Meghnad Saha Planetarium Golapbag -B.U.
Construction of a Cycle stand for Geography Dept. B.U
E.I. work at Meghnad Saha Planetarium B.U.
Augmentation of electrical distribution system from overhead to underground at E.R.S. Hostel through U.G. cable.
Supply, Installation, Testing and Commissioning of UV Based Storage Water Cooler Cum Purifier machine with 80 Ltr Storage Two Faucets ( One Cold and one Ambient),B.U