Loading…
Loading…
14 results • Latest
RE-CONSTRUCTION OF MAIN GATE COMPLEX OF PURANPUR SAMITI - PILIBHIT
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.
CONSTRUCTION OF 5 SHOPS IN JOGITHER GODOWN OF BISALPUR SOCIETY, AT DISTT PILIBHIT
Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loam clay or sand) including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 50m
CONSTRUCTION OF CHAIRMAN OFFICE IN CANE SOCIETY BAREILLY CAMPUS AT BAREILLY
Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loam clay or sand) including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 50m
Interlocking Work in Campus of Banda Khad Godown of Ganna Samiti Powayan, Shahjahanpur
Clearing jungle including uprooting of vegetation grass, bush, wood, trees and sapling of girth up to 30cm. Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area.
Interlocking Work in Cane Devolopment Samiti Campus, Bahedi, Bareilly
Carted Earth filling / Sand Filling from 5.0 km disdance for Raising
GANNA VIKAS SAMITI LTD AMROHA KE PRANGAN ME SITE DEVELOPMENT KA KARYE.
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches.